Census GEOID: 28049 Location Precision: verified address Jump to Entity & Permit Table Commercial & Bulk Data (CC BY-NC 4.0)

Last verified: · 1 primary and 3 reporting sources

● Running Recorded June 9, 2026 · 2 Buildings

Amazon Clinton Data Center

Street address 1200 Industrial Park Rd, Clinton Mega Site, Clinton, MS 39056, Hinds County verified address Exact, at the address [1] U.S. Census Bureau 2020 Gazetteer, internal point of Clinton city (GEOID 2814420), public domain

Overview, regulatory gates and specifications

Amazon held a ribbon cutting ceremony marking the opening of a new data center in Clinton, Mississippi in June 2026. [2] Filings on the record specify 2 planned or operational buildings. [2] Amazon Web Services held a ribbon cutting ceremony marking the opening of its data center campus in Clinton, Hinds County, Mississippi. [2]

Verified Site & Permit Summary
Verified address
1200 Industrial Park Rd, Clinton Mega Site, Clinton, MS 39056, Hinds County verified address
Operator / developer
Amazon
Permit / registry ID
WLBT on file [1]

How much power it needs, how much water it would use and who would use it have not been disclosed.

What happens next: Facility is operational; air permit compliance, water reporting and utility filings are monitored.

Key specifications on the record

Power capacity
Not disclosed
Water usage
Not disclosed
Land area
Not disclosed
Buildings
2 buildings operator page
[2] wlbt.com
Backup generators
Not disclosed
Capital investment
Not disclosed
Commissioned
Operational since 2026 (first year)
Who leads it
Amazon as stated by the source
[2] wlbt.com
Not disclosed
Who would use it, Jobs once it runs, Tax each year

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Clinton leaders

Public Record Speaker

DID Recorded statement at www.facebook.com (June 9, 2026)
SAID Clinton leaders say Amazon's new data center will bring jobs and strengthen local services (June 9, 2026) facebook.com (opens in a new tab)

Amazon

Public Record Speaker

DID Recorded statement at www.facebook.com (June 9, 2026)
SAID Amazon says it won't use water for cooling (June 9, 2026) facebook.com (opens in a new tab)

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: Amazon
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for Amazon Clinton Data Center.

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW)
Site Footprint (Acres)
Data Hall Buildings 2 buildings 2 Site filing [2] wlbt.com
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Power the campus would draw A utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

  1. · Status: running (content date)

    Amazon Web Services held a ribbon cutting ceremony marking the opening of its data center campus in Clinton, Hinds County, Mississippi.

    [2] wlbt.com

Every event in order

4 corrections to this record

Every correction, with its reason
  1. · Site coordinates

    Clinton, Mississippi is in Hinds County; the record had filed it under Madison County and placed it at Canton. On the editor's word of October 16, 2026.

  2. · County (Madison to Hinds)

    Clinton, Mississippi is in Hinds County; the record had filed it under Madison County and placed it at Canton. On the editor's word of October 16, 2026.

  3. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  4. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

Every correction on the record is on the corrections page.

Nearest data centers in Mississippi

Verified data center records in Mississippi within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
Jackson Lake Hico Data Center Jackson, Hinds County ~11 mi Proposed
Amazon Canton Data Centers Canton, Madison County 24 mi Being built Amazon 4 buildings
Ridgeland Data Center Ridgeland, Madison County ~27 mi Proposed

Blank cell: not disclosed by any source on file.

Common questions about Amazon Clinton Data Center

Answered directly from the verified filings and local actions on this page.

Who is building Amazon Clinton Data Center?

Amazon is the developer, wlbt.com (opens in a new tab). No construction contractor is named on the record yet.

How much power and water does Amazon Clinton Data Center say it needs?

Power: not disclosed by any source on file. Water: not disclosed by any source on file.

Where does Amazon Clinton Data Center stand today?

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Primary documents

  1. US EPA ECHO and Mississippi Department of Environmental Quality Permit & Parcel Record (1200 Industrial Park Rd, Clinton Mega Site, Clinton, MS 39056) (opens in a new tab), U.S. Environmental Protection Agency and Mississippi Department of Environmental Quality, November 6, 2026

Reporting

  1. ‘Exciting day in Mississippi’: Ribbon-cutting marks opening of Clinton data center - WLBT (opens in a new tab), WLBT, June 9, 2026, local outlet
  2. ‘When Amazon comes to town.’ Clinton and company host ribbon cutting for new data center - Mississippi Today (opens in a new tab), Mississippi Today, June 9, 2026, local outlet
  3. Clinton leaders say Amazon’s new data center will bring jobs and strengthen local services, while the company says it won’t use water for cooling. (opens in a new tab), www.facebook.com, June 9, 2026, social media

4 sources on file.

Regional grid context

This site is in the SERC Mississippi Valley (SRMV) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Amazon Clinton Data Center", https://datacenterrecord.org/projects/amazon-clinton-data-center-ms, last verified November 6, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Amazon Clinton Data Center", https://datacenterrecord.org/projects/amazon-clinton-data-center-ms. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Running
Tier
built from one source
Tags
Built from one source
Coordinates
32.3485, -90.3625
How the location is known
Location from the site's street address.
Location source
U.S. Census Bureau 2020 Gazetteer, internal point of Clinton city (GEOID 2814420), public domain
Coordinate source
US EPA ECHO FRS and municipal parcel records
Location last verified
November 6, 2026
Published
September 5, 2026
Last verified
November 6, 2026
Not disclosed
Location source number, EPA registry id, Uses, Tenancy, Cooling, How capacity was disclosed, How water was disclosed, How acreage was disclosed, Interconnection, Capacity, if disclosed, Rating of the county's rows

Researcher view · Amazon Clinton Data Center · 4 sources, 1 entry · basis and source tier on every row · verified November 6, 2026

Download CSV JSON