Aligned Data Centers Plano

Street address 2800 Summit Ave, Plano, TX 75074, Collin County permit coordinates Exact, the point of the EPA's facility record [3] EPA ECHO detailed facility report: Aligned Data Center Plano

Overview, regulatory gates and specifications

Aligned Data Centers lists 3 data centers at Plano, Texas among the sites it operates. [1] Filings on the record specify 3 planned or operational buildings, closed loop liquid cooling. [2] Aligned Data Centers lists Aligned DFW-01, Aligned DFW-02, Aligned DFW-04 at Plano, Texas on its own page of data center locations, read September 14, 2026. [2]

Verified Site & Permit Summary
Verified address
2800 Summit Ave, Plano, TX 75074, Collin County permit coordinates
Operator / developer
Aligned Data Centers
Permit / registry ID
TCEQ 30 TAC 106.511 Stationary Emergency Generator Permit by Rule and EPA ECHO Facility Registry Record (2800 Summit Ave, Plano, TX 75074) [1]

How much power it needs, how much water it would use and who would use it have not been disclosed.

What happens next: Facility is operational; air permit compliance, water reporting and utility filings are monitored.

Key specifications on the record

Power capacity
Not disclosed
Water usage
Not disclosed
Land area
Not disclosed
Buildings
3 buildings operator page
[2] aligneddc.com
Backup generators
Not disclosed
Capital investment
Not disclosed
Commissioned
Operational since 2015 (11 years)
Who leads it
Aligned Data Centers as stated by the source
How it is cooled
Closed loop liquid as stated by the source
[2] aligneddc.com
Cooling fluid
water as stated by the source
[2] aligneddc.com
Permitted legal entity
Aligned Data Centers Texas Operations what a permit allows
[3] echo.epa.gov
State permit status
TCEQ 30 TAC 106.511 Stationary Emergency Generator Permit by Rule and EPA ECHO Facility Registry Record (2800 Summit Ave, Plano, TX 75074) the state's permit register, last verified November 9, 2026
[3] echo.epa.gov
Official project website
aligneddc.com (opens in a new tab) verified October 28, 2026
aligneddc.com (opens in a new tab)
Not disclosed
Who would use it, Jobs once it runs, Tax each year

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: Aligned Data Centers · Applicant / Shell LLC: Aligned Data Centers
UTILITIES
Electric utility: Not disclosed · Cooling / Water: water

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for Aligned Data Centers Plano.

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW)
Site Footprint (Acres)
Data Hall Buildings 3 buildings 3 operator page [2] aligneddc.com
Cooling & Water System Closed loop liquid water Company / permit specification [2] aligneddc.com
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Power the campus would draw A utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

No dated entry is on the record yet.

Every event in order

  • Read on September 14, 2026 (the day the page was read; it gives no date of its own)

    Aligned Data Centers lists Aligned DFW-01, Aligned DFW-02, Aligned DFW-04 at Plano, Texas on its own page of data center locations, read September 14, 2026.

    [2] aligneddc.com

Nearest data centers in Texas

Verified data center records in Texas within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
STACK DFW01 Plano, Collin County Less than 1 mi Running STACK Infrastructure 2 buildings
Flexential Dallas Plano (DFW01) Plano, Collin County Less than 1 mi Running Flexential 1 building
NTT Global Data Centers Garland (TX1) Garland, Dallas County 2 mi Running NTT Data 2 buildings
Stream Data Centers DFW VII Garland Garland, Dallas County 2 mi Running Stream Data Centers 2 buildings
Digital Realty Richardson Richardson, Dallas County 4 mi Running Digital Realty 7 buildings
Equinix DA9 Irving, Dallas County 4 mi Running Equinix 1 building

Blank cell: not disclosed by any source on file.

Buildings on this site

BuildingAddressStatusSource
Aligned DFW-01 running aligneddc.com (opens in a new tab)
Aligned DFW-02 running aligneddc.com (opens in a new tab)
Aligned DFW-04 running aligneddc.com (opens in a new tab)

Blank cell: not disclosed by any source on file.

3 buildings named on this site (how buildings are counted).

Common questions about Aligned Data Centers Plano

Answered directly from the verified filings and local actions on this page.

Who is building Aligned Data Centers Plano?

Aligned Data Centers is the developer. No construction contractor is named on the record yet.

How much power and water does Aligned Data Centers Plano say it needs?

Power: not disclosed by any source on file. Water: not disclosed by any source on file.

Where does Aligned Data Centers Plano stand today?

It is running; the date it reached that stage is not sourced, only the day a page was read. No dated entry is on the record yet.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Tracked project domains

Promotional domains, campaign sites, and municipal portals preserved through the Internet Archive.

Primary documents

  1. Aligned Data Centers: Data center locations (opens in a new tab), Aligned Data Centers, September 14, 2026
  2. Aligned Data Centers: Aligned DFW-01 (opens in a new tab), Aligned Data Centers, September 14, 2026
  3. EPA ECHO detailed facility report: Aligned Data Center Plano (opens in a new tab), U.S. Environmental Protection Agency

Reporting

  1. BlackRock Reportedly In Talks To Buy Aligned Data Centers For $40B - Bisnow (opens in a new tab), Bisnow, October 3, 2025, news outlet

4 sources on file.

Regional grid context

This site is in the ERCOT All (ERCT) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Aligned Data Centers Plano", https://datacenterrecord.org/projects/aligned-data-centers-plano-tx, last verified November 9, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Aligned Data Centers Plano", https://datacenterrecord.org/projects/aligned-data-centers-plano-tx. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Running
Tier
reviewed in depth
Tags
Reviewed in depth
Coordinates
33.0094, -96.6805
How the location is known
Location from an EPA facility record.
Location source
EPA ECHO Detailed Facility Report (FRS ID 110071345231) for Aligned Data Center at 2800 Summit Ave, Plano, Collin County, Texas.
Coordinate source
EPA ECHO FRS ID 110071345231
Location last verified
September 14, 2026
Cooling
Closed loop liquid
Published
September 14, 2026
Last verified
November 9, 2026
Not disclosed
Location source number, EPA registry id, Uses, Tenancy, How capacity was disclosed, How water was disclosed, How acreage was disclosed, Interconnection, Capacity, if disclosed, Rating of the county's rows

Researcher view · Aligned Data Centers Plano · 4 sources, 1 entry · basis and source tier on every row · verified November 9, 2026