Data Center Record.
Census GEOID: 17089 Location Precision: assessor parcel Jump to Entity & Permit Table Commercial & Bulk Data (CC BY-NC 4.0)

Last verified: · 2 reporting sources

● Stalled or Cancelled Recorded August 19, 2026 · 2 Buildings

South Elgin Sundowner Road Data Center Proposal

Street address 1200 Sundowner Rd, South Elgin, IL 60177, Kane County assessor parcel Exact, on the parcel [1] facebook.com

Overview, regulatory gates and specifications

South Elgin rejected a data center development, becoming the latest Chicagoland village to do so. [1] Filings on the record specify 2 planned or operational buildings. [1]

1. Land & Parcel
Parcel located
2. Local Zoning
Not yet on file
3. Tax & EDA Deal
Not yet on file
4. Utility Grid Queue
Not yet on file
5. Air & Water Permits
Not yet on file
What happens next: Next public milestones include utility queue filings, state environmental permits and local site plan review.
Electricity Demand
Not disclosed
No MW figure in public filings yet

U.S. EIA residential equivalence (~830 homes per MW) will compute automatically once a permit or filing states facility megawatts.

Utility interconnection queue filings monitored.

Cooling & Water
Not disclosed
Daily water volume not stated in public filings

U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.

No local property tax abatement amount disclosed in public filings.

Site & Buildings [1]
2 buildings
zoning application

Assessor parcel acreage and building square footage are added when municipal or county filings are published.

Location: 1200 Sundowner Rd, South Elgin, IL 60177.

Taxes & Permanent Jobs
Not disclosed
Tax and job figures not yet on file

State and local tax abatement agreements and permanent job commitments are recorded when filed.

No local property tax abatement amount disclosed in public filings.

Key specifications on the record

Power capacity
Not disclosed
Water usage
Not disclosed
Land area
Not disclosed
Buildings
2 buildings operator page
[1] facebook.com
Backup generators
Not disclosed
Capital investment
Not disclosed
Who leads it
Sundowner Industrial Developer LLC as stated by the source
Not disclosed
Who would use it, Jobs once it runs, Tax each year

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: Sundowner Industrial Developer LLC
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for South Elgin Sundowner Road Data Center Proposal.

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW)
Site Footprint (Acres)
Data Hall Buildings 2 buildings zoning application [1] facebook.com
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Power the campus would draw A utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Hearings and statements on the record

March 24, 2026 Aurora, IL Aurora City Council Regular Meeting Aurora City Council 2 clips

Aurora City Council debated and adopted stricter data center zoning regulations and municipal electricity tax measures prior to the expiration of the city's temporary moratorium, following testimony from homeowners adjacent to the CyrusOne campus.

  1. Aurora City Council Alderman Elected Official transcribed from the official recording
    "together tonight with a clean resolution and to pass whatever we need to and making sure that we do not have the data centers going into an extension on the moratorium because should that happen, in that 30 day period like I mentioned before, cuz this isn't our first time we've been up here. I'm not going to rehash all the previous stuff because we've talked about that too much"
  2. Resident public comment Resident Public Comment transcribed from the official recording
    "we've been living in that home now for 19 years. In 2010 when CME put that first warehouse, repurposed that first warehouse for a data center, it was of no problem to the neighborhood. the generators would run every now and then. There'd be a little bit of noise, but it didn't take long to get that resolved. There was no other other noise that was bothering any of the homeowners."

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

  1. · Status: stalled or cancelled (content date)

    South Elgin rejected a data center development, becoming the latest Chicagoland village to do so.

    [1] facebook.com

Every event in order

1 correction to this record

Every correction, with its reason
  1. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

Every correction on the record is on the corrections page.

Nearest data centers in Illinois

Verified data center records in Illinois within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
Compass Datacenters Hoffman Estates Campus (ORD1) Hoffman Estates, Cook County 8 mi Running Compass Datacenters 5 buildings
Karis Critical Hoffman Estates Data Center Proposal Hoffman Estates, Cook County 10 mi Stalled or cancelled Karis Critical 2 buildings
Microsoft Hoffman Estates Data Center Campus (CHI22) Hoffman Estates, Cook County 11 mi Running Microsoft
Edged Chicago Data Center Campus (Aurora CHI01) Aurora, Kane County 12 mi Running Edged 96 MW
Digital Glendale Heights Data Center Glendale Heights, DuPage County 13 mi Running Digital Realty 1 building
CyrusOne Aurora Campus (CHI1 / CHI2 / CHI3) Aurora, DuPage County 13 mi Running CyrusOne 3 buildings

Blank cell: not disclosed by any source on file.

Common questions about South Elgin Sundowner Road Data Center Proposal

Answered directly from the verified filings and local actions on this page.

Who is building South Elgin Sundowner Road Data Center Proposal?

Sundowner Industrial Developer LLC is the developer. No construction contractor is named on the record yet.

How much power and water does South Elgin Sundowner Road Data Center Proposal say it needs?

Power: not disclosed by any source on file. Water: not disclosed by any source on file.

Where does South Elgin Sundowner Road Data Center Proposal stand today?

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Reporting

  1. Any advice on how to go about this would be super duper appreciated. Yesterday the Village of South Elgin IL tried to slip this by residents hoping they wouldn't notice. Many are still unaware. Some in the area don't even know what a data center is. It's by a ver (opens in a new tab), www.facebook.com, July 16, 2026, social media
  2. South Elgin becomes latest Chicagoland village to reject a data center development - The Real Deal (opens in a new tab), The Real Deal, August 19, 2026, news outlet

2 sources on file.

Regional grid context

This site is in the RFC West (RFCW) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "South Elgin Sundowner Road Data Center Proposal", https://datacenterrecord.org/projects/south-elgin-data-center-il, last verified November 6, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "South Elgin Sundowner Road Data Center Proposal", https://datacenterrecord.org/projects/south-elgin-data-center-il. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Stalled or cancelled
Tier
built from one source
Tags
Built from one source
Coordinates
41.9815, -88.3182
How the location is known
Location from the county parcel record.
Location source
https://www.southelgin.com/
Coordinate source
Village of South Elgin Committee of the Whole Concept Plan Rejection (August 18, 2026)
Location last verified
September 16, 2026
Published
September 4, 2026
Last verified
November 6, 2026
Not disclosed
Location source number, EPA registry id, Uses, Tenancy, Cooling, How capacity was disclosed, How water was disclosed, How acreage was disclosed, Interconnection, Capacity, if disclosed, Rating of the county's rows

Researcher view · South Elgin Sundowner Road Data Center Proposal · 2 sources, 1 entry · basis and source tier on every row · verified November 6, 2026

Download CSV JSON