Data Center Record.
Census GEOID: 17043 Location Precision: verified address Jump to Entity & Permit Table Commercial & Bulk Data (CC BY-NC 4.0)

Last verified: · 5 primary and 12 reporting sources

● Running First recorded September 14, 2026 · 3 Buildings

CyrusOne Aurora Campus (CHI1 / CHI2 / CHI3)

Street address 2905 Diehl Rd, Aurora, IL 60502, DuPage County verified address Exact, at the address [3] CyrusOne: CyrusOne Aurora CHI1-CHI3

Overview, regulatory gates and specifications

CyrusOne lists a data center at Aurora, Illinois among the sites it operates. [1] Filings on the record specify 3 planned or operational buildings. [3] CyrusOne lists CyrusOne Aurora CHI1 CHI3 at Aurora, Illinois on its own page of data center locations, read September 14, 2026. [3]

1. Land & Parcel
Parcel located
2. Local Zoning
Zoning approved
3. Tax & EDA Deal
Not yet on file
4. Utility Grid Queue
Energized
5. Air & Water Permits
Illinois DCEO Data Center In
What happens next: Facility is operational; air permit compliance, water reporting and utility filings are monitored.
Electricity Demand
Not disclosed
No MW figure in public filings yet

U.S. EIA residential equivalence (~830 homes per MW) will compute automatically once a permit or filing states facility megawatts.

Utility interconnection queue filings monitored.

Cooling & Water
Not disclosed
Daily water volume not stated in public filings

U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.

No local property tax abatement amount disclosed in public filings.

Site & Buildings [3]
3 buildings
operator page

Assessor parcel acreage and building square footage are added when municipal or county filings are published.

Location: 2905 Diehl Rd, Aurora, IL 60502.

Taxes & Permanent Jobs
Not disclosed
Tax and job figures not yet on file

State and local tax abatement agreements and permanent job commitments are recorded when filed.

No local property tax abatement amount disclosed in public filings.

Key specifications on the record

Power capacity
Not disclosed
Water usage
Not disclosed
Land area
Not disclosed
Buildings
3 buildings operator page
[3] cyrusone.com
Backup generators
Not disclosed
Capital investment
Not disclosed
Commissioned
Operational since 2016 (10 years)
Who leads it
CyrusOne as stated by the source
Permitted legal entity
CyrusOne (C1 Chicago); C1 Chicago Aurora III LLC what a permit allows
[3] cyrusone.com
State permit status
Illinois DCEO Data Center Investment Program Certified (2022, CyrusOne (C1 Chicago); C1 Chicago Aurora III LLC) the state's permit register, as of December 31, 2025, last verified November 6, 2026
[4] dceo.illinois.gov
Official project website
cyrusone.com (opens in a new tab) verified October 28, 2026
cyrusone.com (opens in a new tab)
Archived promotional websites
cyrusone.com (opens in a new tab) [Wayback snapshot] (opens in a new tab) preserved in Internet Archive
tracked domains
Not disclosed
Who would use it, Jobs once it runs, Tax each year

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

JB Pritzker

JB Pritzker

Governor · Illinois

DID Recorded statement at Illinois Times (September 23, 2026)
SAID CyrusOne secured a tax break before Governor JB Pritzker used executive authority to pause a state program providing deals to developers (September 23, 2026) illinoistimes.com (opens in a new tab)

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: CyrusOne · Applicant / Shell LLC: CyrusOne (C1 Chicago); C1 Chicago Aurora III LLC
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for CyrusOne Aurora Campus (CHI1 / CHI2 / CHI3).

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW)
Site Footprint (Acres)
Data Hall Buildings 3 buildings 3 operator page [3] cyrusone.com
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Power the campus would draw A utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Hearings and statements on the record

March 24, 2026 Aurora, IL Aurora City Council Regular Meeting Aurora City Council 2 clips

Aurora City Council debated and adopted stricter data center zoning regulations and municipal electricity tax measures prior to the expiration of the city's temporary moratorium, following testimony from homeowners adjacent to the CyrusOne campus.

  1. Aurora City Council Alderman Elected Official transcribed from the official recording
    "together tonight with a clean resolution and to pass whatever we need to and making sure that we do not have the data centers going into an extension on the moratorium because should that happen, in that 30 day period like I mentioned before, cuz this isn't our first time we've been up here. I'm not going to rehash all the previous stuff because we've talked about that too much"
  2. Resident public comment Resident Public Comment transcribed from the official recording
    "we've been living in that home now for 19 years. In 2010 when CME put that first warehouse, repurposed that first warehouse for a data center, it was of no problem to the neighborhood. the generators would run every now and then. There'd be a little bit of noise, but it didn't take long to get that resolved. There was no other other noise that was bothering any of the homeowners."
March 24, 2026 Aurora, IL Aurora City Council Hearing on CyrusOne Data Center Noise and Siting Restrictions Aurora City Council 3 clips

CBS Chicago report on Aurora City Council and community proceedings in Aurora, IL: Aurora City Council Hearing on CyrusOne Data Center Noise and Siting Restrictions (March 24, 2026).

  1. CBS Chicago Broadcast Report Broadcast Report transcribed from local broadcast report
    "People who live in a neighborhood behind this Cyrus One data center here day and night. It's near Interstate 88, and those neighbors have been coming to city council meetings for months to get their point across. We hear the sound constantly. I can hear the chiller fans in my yard, in my house. I can hear it in the shower. I hear it all the time. It never goes away. At the meeting tonight, city council was set to give a final vote on restrictions for new data"
  2. CBS Chicago Broadcast Report Broadcast Report transcribed from local broadcast report
    "noise, and water before development, meet standards for noise, vibrations, and energy, and get city council approval. The thing that's been challenging is getting the right noise level. We got some recommendations from some of the residents that the decibel levels on our noise limits were not high or not low enough. City officials say in the last week they brought down the noise level requirements and want generators"
  3. Resident public comment Resident Public Comment transcribed from local broadcast report
    "centers must be transparent about their energy, water, and noise usage. Some say these strict limits would deter new businesses. So now we come out, we're all public about oh, we're going to do the strictest regulations on data centers. What What message does that send to anybody else in the area about developing anything in Aurora? While those with Cyrus One data centers say they are already doing a decent job and"
January 20, 2026 Naperville, IL Naperville City Council Vote Rejecting Karis Critical Data Center Proposal Naperville City Council 3 clips

In a late night vote on January 20, 2026 following five months of review and hours of resident testimony, the Naperville City Council rejected a last minute request to delay and voted down the proposed Karis Critical data center.

  1. FOX 32 Chicago Broadcast Report Broadcast Report transcribed from local broadcast report
    "the city council there voted to not move forward with that proposal. And we're also getting a reaction and a little more insight into how last night's city council meeting played out. Ian Holzhauer, one of the city council members who actually voted against that proposed data center, posted this on his Facebook page last night and he said in part, "After more than 5 months of review, hours of public testimony, and after every council member had spoken, a"
  2. Resident public comment Resident Public Comment transcribed from local broadcast report
    "p.m. The mayor and the developer's attorney suggested delaying the vote to allow the developer more time to submit revised plans despite the developer itself choosing last night as the date for this item to appear on the agenda." Now, he goes on to say, "Instead, a motion was made to table the agenda item, not because of new information from the community, but because the petitioner was not fully prepared on the"
  3. FOX 32 Chicago Broadcast Report Broadcast Report transcribed from local broadcast report
    "motion to delay failed and shortly after, the city council struck down that proposed data center altogether. Now, that proposal, if approved, would have put the 200,000 square foot data center along Naperville and Warrenville Roads with dozens of diesel generators. That area is pretty close to residential homes and nearby parks and playgrounds. And the people who live in that area say really location was their biggest concern, pointing to a risk of air"
January 20, 2026 Naperville, IL Naperville residents opposing potential data center pack city council meeting Naperville City Council 3 clips

CBS Chicago report on Naperville City Council and community proceedings in Naperville, IL: Naperville residents opposing potential data center pack city council meeting (January 20, 2026).

  1. CBS Chicago Broadcast Report Broadcast Report transcribed from local broadcast report
    "Rich Janer lives near the proposed data center site, the 36 megawatt facility spanning over 130,000 square feet would be built along the I88 corridor. My own kids are six, nine, and 15 and don't necessarily want them growing up playing basketball, riding their bikes in such close proximity to a to a facility that's going to generate diesel exhaust. Fears over increased"
  2. CBS Chicago Broadcast Report Broadcast Report transcribed from local broadcast report
    "diesel generators as opposed to the data center will stand out for just some of the concerns shared by those against the project at Tuesday's PAC city council meeting in Neapville. Here to protect the health of my family, my home, property values, and just our community. If we're doing this work at an executive with Caris Critical, the developer behind the data center, says the facility will use less water than the office building that once stood at"
  3. Resident public comment Resident Public Comment transcribed from local broadcast report
    "all of that. We do not want a data center anywhere in Neighborville or even Illinois. Not near our homes, not near our trees, and not near our water. And those residents who also live near this proposed site against this proposal, they are concerned about their property values decreasing. And last year, neighboring suburb Aurora, they"
Said and filed

Said and filed

Statements and filings, side by side

Tax Abatements Power & Grid Zoning Moratorium
Column A · Dated Statement
JB Pritzker Governor of Illinois
Venue: Illinois DCEO Data Center Investment Program & Climate and Equitable Jobs Act (CEJA) Record
"Touted hundreds of millions of dollars in state tax exemptions under the Illinois Department of Commerce and Economic Opportunity (DCEO) Data Center Investment Program alongside Illinois's Climate and Equitable Jobs Act (CEJA) mandate for a 100 percent clean energy grid."
WBEZ Chicago & St. Louis Public Radio (NPR) Timestamp 01:05
Column B · Primary Government Record
Illinois EPA Bureau of Air Diesel Generator Construction Permits & PJM / ComEd Base Residual Auction Capacity Filings
Illinois EPA Bureau of Air Tier 2 Diesel Generator Permits · PJM / ComEd 2025/2026 & 2026/2027 Capacity Dockets
Agency or Venue: Illinois Environmental Protection Agency (IEPA) & PJM Interconnection / Illinois Commerce Commission
"Primary air construction permits issued by the Illinois EPA Bureau of Air authorize hundreds of megawatts of fossil fuel Tier 2 diesel backup generators at DCEO tax exempt data center campuses across the Chicago metro area, while PJM Interconnection and ComEd capacity auction filings document acute Northern Illinois load growth and capacity price spikes that prompted Aurora's March 24, 2026 zoning and electricity tax ordinance."
City of Aurora, Illinois (Official)
Noise Zoning Water Power & Grid
Column A · Dated Statement
CyrusOne Campus Representatives and Municipal Development Presentation Data Center Operator Representatives
Venue: Aurora City Council Expansion Review
"Operator expansion filings for the CyrusOne Aurora campus near Diehl Road and Interstate 88 described enclosed mechanical yards and acoustic screening designed to prevent off site sound impacts on adjacent residential subdivisions."
Column B · Primary Government Record
Aurora City Council Data Center Noise, Vibration, Water, and Conditional Use Ordinance
City of Aurora, Illinois Council Docket · June 2026
Agency or Venue: Aurora City Council (Illinois)
"Following months of resident testimony reporting continuous 24 hour chiller fan hum inside homes bordering the Interstate 88 campus, Aurora City Council enacted municipal data center regulations lowering maximum permissible decibel limits, requiring pre development energy, water, and acoustic studies, and mandating full city council approval."

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

No dated entry is on the record yet.

Every event in order

  • Read on September 14, 2026 (the day the page was read; it gives no date of its own)

    CyrusOne lists CyrusOne Aurora CHI1 CHI3 at Aurora, Illinois on its own page of data center locations, read September 14, 2026.

    [3] cyrusone.com

2 corrections to this record

Every correction, with its reason
  1. · Speaker role

    Speaker read again from the statement's source line, "Governor JB Pritzker": the title in front of the name (Governor) is the role, not part of the name.

  2. · Speaker

    Speaker read again from the statement's source line, "Governor JB Pritzker": the title in front of the name (Governor) is the role, not part of the name.

Every correction on the record is on the corrections page.

Nearest data centers in Illinois

Verified data center records in Illinois within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
Edged Chicago Data Center Campus (Aurora CHI01) Aurora, Kane County 1 mi Running Edged 96 MW
Meridian Parkway Aurora Data Center Aurora, DuPage County 2 mi Running Meridian Parkway Data Center Owner LLC 1 building
Centersquare Chicago Lisle (ORD4) Lisle, DuPage County 8 mi Running Centersquare 15 MW
Ensono Downers Grove Data Center Downers Grove, DuPage County 11 mi Running Ensono 1 building
CyrusOne Chicago Lombard Lombard, DuPage County 12 mi Running CyrusOne 1 building
Digital Glendale Heights Data Center Glendale Heights, DuPage County 12 mi Running Digital Realty 1 building

Blank cell: not disclosed by any source on file.

Common questions about CyrusOne Aurora Campus (CHI1 / CHI2 / CHI3)

Answered directly from the verified filings and local actions on this page.

Who is building CyrusOne Aurora Campus (CHI1 / CHI2 / CHI3)?

CyrusOne is the developer. No construction contractor is named on the record yet.

How much power and water does CyrusOne Aurora Campus (CHI1 / CHI2 / CHI3) say it needs?

Power: not disclosed by any source on file. Water: not disclosed by any source on file.

Where does CyrusOne Aurora Campus (CHI1 / CHI2 / CHI3) stand today?

It is running; the date it reached that stage is not sourced, only the day a page was read. No dated entry is on the record yet.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Tracked project domains

Promotional domains, campaign sites, and municipal portals preserved through the Internet Archive.

Primary documents

  1. CyrusOne: Data centers (opens in a new tab), CyrusOne, September 14, 2026
  2. EPA Facility Registry Service (FRS) Detailed Facility Report: CyrusOne LLC (110070005159) (opens in a new tab), US Environmental Protection Agency ECHO, October 28, 2026
  3. CyrusOne: CyrusOne Aurora CHI1-CHI3 (opens in a new tab), CyrusOne, September 14, 2026
  4. Illinois DCEO Data Center Investment Program 2025 Annual Report (CyrusOne (C1 Chicago); C1 Chicago Aurora III LLC, Aurora) (opens in a new tab), Illinois Department of Commerce and Economic Opportunity, December 31, 2025
  5. Illinois DCEO Data Center Investment Program 2025 Annual Report (C1 Chicago Aurora III LLC, 2024 Certification) (opens in a new tab), Illinois Department of Commerce and Economic Opportunity, December 31, 2025

Reporting

  1. Gov. Pritzker Celebrates New CyrusOne Data Center Groundbreaking - RiverBender.com (opens in a new tab), RiverBender.com, October 2, 2024, news outlet
  2. CyrusOne receives rezoning approval for data center campus outside Chicago, Illinois - Data Center Dynamics (opens in a new tab), Data Center Dynamics, June 26, 2024, news outlet
  3. CyrusOne Plans Campus With 2 Data Centers, 3 Towers Near Chicago - bisnow.com (opens in a new tab), bisnow.com, June 3, 2024, news outlet
  4. CyrusOne Kicks Off Chicago Data Center Campus - CommercialSearch (opens in a new tab), CommercialSearch, October 4, 2024, news outlet
  5. CyrusOne Breaks Ground on New Data Center in Aurora - citybiz (opens in a new tab), citybiz, October 2, 2024, local outlet
  6. CyrusOne files for nine-building data center campus outside Chicago, Illinois - Data Center Dynamics (opens in a new tab), Data Center Dynamics, June 10, 2024, news outlet
  7. CyrusOne breaks ground on new data center campus in Aurora - WSPYnews.com (opens in a new tab), WSPYnews.com, October 3, 2024, local outlet
  8. CyrusOne breaks ground on 40MW Illinois data center campus - Data Center Dynamics (opens in a new tab), Data Center Dynamics, October 4, 2024, news outlet
  9. Holmes celebrates new CyrusOne data center in Aurora - Illinois Senate Democratic Caucus (opens in a new tab), Illinois Senate Democratic Caucus, October 4, 2024, local outlet
  10. Emergency repair work happening Thursday at CyrusOne data center in Aurora after weather delays - chicagotribune.com (opens in a new tab), chicagotribune.com, August 13, 2025, local outlet
  11. CyrusOne prepares for $350 million Aurora data center campus - Chicago Construction News (opens in a new tab), Chicago Construction News, October 8, 2024, news outlet
  12. Aurora to negotiate with data center company on expansion plan - Chicago Tribune (opens in a new tab), Chicago Tribune, February 15, 2024, local outlet

17 sources on file.

Regional grid context

This site is in the RFC West (RFCW) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "CyrusOne Aurora Campus (CHI1 / CHI2 / CHI3)", https://datacenterrecord.org/projects/cyrusone-aurora-chi1-chi3-il, last verified November 6, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "CyrusOne Aurora Campus (CHI1 / CHI2 / CHI3)", https://datacenterrecord.org/projects/cyrusone-aurora-chi1-chi3-il. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Running
Tier
built from one source
Tags
Built from one source
Coordinates
41.796754, -88.24276
How the location is known
Location from the site's street address.
Location source
https://www.cyrusone.com/data-centers/north-america/aurora-il
Coordinate source
CyrusOne Aurora (2905 Diehl Rd) campus specification
Location last verified
September 14, 2026
Published
September 14, 2026
Last verified
November 6, 2026
Not disclosed
Location source number, EPA registry id, Uses, Tenancy, Cooling, How capacity was disclosed, How water was disclosed, How acreage was disclosed, Interconnection, Capacity, if disclosed, Rating of the county's rows

Researcher view · CyrusOne Aurora Campus (CHI1 / CHI2 / CHI3) · 17 sources, 1 entry · basis and source tier on every row · verified November 6, 2026

Download CSV JSON