Running Built from one source

Centersquare Chicago Lisle (ORD4)

Lisle, DuPage County, ILDeveloper: Centersquare

Stage
Running
Power
15 MW
the developer's figure
Buildings
1 building
operator page, verified October 26, 2026
Undisclosed in public filings
Land, Water

Vultr launched an AMD GPU supercomputer cluster at Centersquare's Lisle, Illinois data center, which offers 15 MW of utility power across 194,057 square feet. It is running, since December 13, 2024.

How much water it would use and who would use it have not been disclosed.

Last verified · 3 sources, 1 primary · Built from one source, not yet reviewed in depth by a person. · How to read this page

  • This record: Running, ringed
  • data center
  • Smaller pins: 47 other published records in Illinois
Details
  • this record's location, ringed
  • parcel outline, from the county parcel record
  • city limits, U.S. Census Bureau, on a town level record
  • county boundary

The other pins are the published projects in the same state, each in its stage color. The imagery beneath is the USGS national orthoimagery, public domain, shown so the land around the site can be read.

How to read this page. Every fact links to the source it rests on; a number in brackets is its place in the source list. A figure no source gives reads Not disclosed, and nothing is estimated. Where sources give different figures, each is shown with who gave it, and another source's figure never stands in for the record's own. Entries are added and never overwritten; corrections are listed under What happened.

What is known

Each figure as its source gave it. The number in brackets is its place in the source list.

Buildings
1 building operator page, verified October 26, 2026
[2] csquare.com
Power it would draw
15 MW the developer's figure About 0 percent of New York City's summer peak demand in 2024.
[2] csquare.com
Who leads it
Centersquare as stated by the source
Undisclosed in public filings
Land, Water, Who would use it, Jobs once it runs, Tax each year
The math behind the comparison
  1. Centersquare Chicago Lisle (ORD4), capacity: 15 MW.
  2. New York City (NYISO Zone J) summer peak demand, actual, 2024: 10,245 MW (2024).
  3. 15 ÷ 10,245 = 0 (MW over MW).

Sources:

A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).

Every field, with who said it and when (Researcher view)

Impact figures

FieldValueWho says soSourceLast verified
How much power it needs 15 MW the developer's figure [2] csquare.com (opens in a new tab) October 26, 2026
How much water it would use
How loud it would be
Jobs once it runs
Tax it would pay each year

The record's fields

FieldValueWho says soSourceLast verified
Who is building it Centersquare as stated by the source October 26, 2026
Who is constructing it
How much land
Buildings 1 building operator page, verified October 26, 2026 [2] csquare.com (opens in a new tab) October 26, 2026
Where its power comes from
Grid connection
How it is cooled

A blank value cell means not disclosed by any source on file; a blank basis cell means the source gave the figure without saying on what basis.

The developer's figure is what the company said; what a permit allows is the ceiling a permit sets; measured means observed. Water is in gallons a day or a year, whichever the source stated; a tax claim given as a range shows both ends, each linked to the source that gave it.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

What happened

  1. · Status: running (content date)

    Vultr launched an AMD GPU supercomputer cluster at Centersquare's Lisle, Illinois data center, which offers 15 MW of utility power across 194,057 square feet.

    [3] datacenterdynamics.com

The full Centersquare Chicago Lisle (ORD4) timeline, in order

The site

The pin is the site, as the EPA's facility record places it. Location from an EPA facility record.

The site map is at the top of the page.

Where
4513 Western Ave, Lisle, IL 60532, Lisle, DuPage County, Illinois [1] echo.epa.gov (opens in a new tab)
How exactly it is located
Exact, the point of the EPA's facility record
The parcel
No parcel outline in the public record
Nearest homes
Not computed for a record placed at a place center

USGS NAIP aerial view of Centersquare Chicago Lisle (ORD4)
LAT 41.80087 / LON -88.09638 Imagery: U.S. Geological Survey / USDA NAIP (Public Domain)

Questions about this project

5 questions answered from the record

Answered from the rows on this page.

How big is Centersquare Chicago Lisle (ORD4)?

The record has 2 measures of its size: 15 MW (the developer's figure, csquare.com (opens in a new tab)) and 1 building (operator page, verified October 26, 2026, csquare.com (opens in a new tab)). Its acreage is not disclosed.

Who is building Centersquare Chicago Lisle (ORD4)?

Centersquare is the developer. No construction contractor is named on the record yet.

How much power and water does Centersquare Chicago Lisle (ORD4) say it needs?

Power: 15 MW (the developer's figure, csquare.com (opens in a new tab)). Water: not disclosed by any source on file.

What has Lisle or DuPage County decided about it?

No decision by Lisle or DuPage County about data centers is on the record. The DuPage County page and the Illinois scorecard list every rated row the day a person publishes one.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Primary documents

  1. EPA ECHO detailed facility report: Centersquare ORD4 (opens in a new tab), U.S. Environmental Protection Agency

Reporting

  1. Centersquare: Chicago (ORD4 Lisle) Data Center Specification (opens in a new tab), Centersquare, query feed
  2. Vultr launches AMD GPU supercomputer cluster in Chicago - Data Center Dynamics (opens in a new tab), Data Center Dynamics, December 13, 2024, query feed

3 sources on file.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Commercial, enterprise, financial or AI training use needs a commercial license. Prose stays under copyright.
Cite this page Data Center Record, "Centersquare Chicago Lisle (ORD4)", https://datacenterrecord.org/projects/centersquare-lisle-data-center-il, last verified October 26, 2026. CSV · JSON
Cite this page

Data Center Record, "Centersquare Chicago Lisle (ORD4)", https://datacenterrecord.org/projects/centersquare-lisle-data-center-il. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Prose stays under copyright.

Report a change
For researchers
Stage
Running
Tier
built from one source
Tags
Built from one source
Coordinates
41.80087, -88.09638
How the location is known
Location from an EPA facility record.
Location source
https://echo.epa.gov/detailed-facility-report?fid=110071955712
Coordinate source
EPA ECHO Detailed Facility Report 110071955712
Location source number
[1]
Location last verified
October 6, 2026
EPA registry id
110071955712
How capacity was disclosed
the developer's figure
Capacity, if disclosed
15 MW, the developer's figure
Published
September 28, 2026
Last verified
October 26, 2026
Undisclosed in public filings
Uses, Tenancy, Cooling, How water was disclosed, How acreage was disclosed, Interconnection, Rating of the county's rows

Researcher view · Centersquare Chicago Lisle (ORD4) · 3 sources, 1 entry, 0 decisions nearby · basis and source tier on every row · verified October 26, 2026