Data Center Record.
Census GEOID: 30063 Location Precision: county centroid Jump to Entity & Permit Table Commercial & Bulk Data (CC BY-NC 4.0)

Last verified: · 10 reporting sources

● Stalled or Cancelled Reported July 6, 2026

Krambu Bonner Data Center

Location Bonner, Missoula County, Montana county centroid County level, the county seat

Overview, regulatory gates and specifications

Krambu proposed a 29 MW data center in Bonner, Montana, but withdrew its application following public opposition, and the property owner also backed out. [3] Krambu Bonner data center proposal halted after public concerns; general manager withdrew signature [10]

Verified Site & Permit Summary
Verified address
Bonner, Missoula County, Montana county centroid
Operator / developer
Krambu
Permit / registry ID
Data Center Dynamics on file [1]

How much power it needs, how much water it would use and who would use it have not been disclosed.

What happens next: Next public milestones include utility queue filings, state environmental permits and local site plan review.

Key specifications on the record

Power capacity
Not disclosed
Water usage
Not disclosed
Land area
Not disclosed
Buildings
Not disclosed
Backup generators
Not disclosed
Capital investment
Not disclosed
Who leads it
Krambu as stated by the source
Not disclosed
Who would use it, Jobs once it runs, Tax each year

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: Krambu
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for Krambu Bonner Data Center.

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW) 29 MW Disclosed filing [3] datacenterdynamics.com
Site Footprint (Acres)
Data Hall Buildings
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Power the campus would draw A utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

  1. (source date; the content gives no date of its own)

    Krambu Bonner data center proposal halted after public concerns; general manager withdrew signature

    [10] nbcmontana.com

  2. · Status: stalled or cancelled (source date; the content gives no date of its own)

    Krambu withdrew application for Bonner data center

    [6] missoulacurrent.com, also [1] kpax.com, also [2] nbcmontana.com

Every event in order

6 corrections to this record

Every correction, with its reason
  1. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  2. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  3. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  4. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  5. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  6. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

Every correction on the record is on the corrections page.

Nearest data centers in Montana

Nearest records are not computed for a record placed at a county seat. Browse all data centers in Montana.

Common questions about Krambu Bonner Data Center

Answered directly from the verified filings and local actions on this page.

Who is building Krambu Bonner Data Center?

Krambu is the developer. No construction contractor is named on the record yet.

How much power and water does Krambu Bonner Data Center say it needs?

Power: not disclosed by any source on file. Water: not disclosed by any source on file.

Where does Krambu Bonner Data Center stand today?

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Reporting

  1. Proposed Bonner AI data center now dead in the water after property owner removes signature on application - KPAX News (opens in a new tab), KPAX News, July 6, 2026, local outlet
  2. Construction of Bonner data center halted at mill location - NBC Montana (opens in a new tab), NBC Montana, July 6, 2026, local outlet
  3. Plans for 29MW data center in Bonner, Montana, dropped - Data Center Dynamics (opens in a new tab), Data Center Dynamics, July 8, 2026, trade press
  4. Bonner data center plans halted following public outcry - Montana Public Radio (opens in a new tab), Montana Public Radio, July 8, 2026, local outlet
  5. Missoula meeting draws opposition to proposed Bonner data center - montanarightnow.com (opens in a new tab), montanarightnow.com, July 7, 2026, local outlet
  6. Krambu withdraws application for proposed Bonner data center - Missoula Current (opens in a new tab), Missoula Current, July 6, 2026, local outlet
  7. Developer Backs Out of Bonner Data Center - newstalkkgvo.com (opens in a new tab), newstalkkgvo.com, July 7, 2026, news outlet
  8. Property owner of proposed Bonner data center backs out - Montana Free Press (opens in a new tab), Montana Free Press, July 6, 2026, local outlet
  9. Water, energy, land use: Missoula data center proposal prompts questions - Montana Free Press (opens in a new tab), Montana Free Press, May 21, 2026, local outlet
  10. Missoula Co. unanimously passes 1 year moratorium on data centers - NBC Montana (opens in a new tab), NBC Montana, July 9, 2026, local outlet

10 sources on file.

Regional grid context

This site is in the Northwest Power Pool (NWPP) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Krambu Bonner Data Center", https://datacenterrecord.org/projects/krambu-bonner-data-center-mt, last verified September 17, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Krambu Bonner Data Center", https://datacenterrecord.org/projects/krambu-bonner-data-center-mt. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Stalled or cancelled
Tier
built from one source
Tags
Built from one source
Coordinates
46.8625, -114.01167
How the location is known
Location is the county seat; exact site not disclosed.
Location source
County seat (Missoula), Wikidata, placed at county level
Coordinate source
wikidata county seat
Location last verified
September 16, 2026
Capacity, if disclosed
29 MW, not disclosed
Published
September 5, 2026
Last verified
September 17, 2026
Not disclosed
Location source number, EPA registry id, Uses, Tenancy, Cooling, How capacity was disclosed, How water was disclosed, How acreage was disclosed, Interconnection, Rating of the county's rows

Researcher view · Krambu Bonner Data Center · 10 sources, 2 entries · basis and source tier on every row · verified September 17, 2026

Download CSV JSON