Google Berkeley County data center

Street address 1025 Cane Bay Boulevard, Moncks Corner, SC 29461, Berkeley County verified address Exact, at the address [1] Google: Data center locations

Overview, regulatory gates and specifications

Google operates its Berkeley County hyperscale data center campus at 1025 Cane Bay Boulevard in Moncks Corner, Berkeley County, South Carolina. [2] Filings on the record specify disclosed capacity of 200 MW (the developer's figure), 4 planned or operational buildings. [1] Google lists Google Berkeley County data center at Berkeley County, South Carolina on its own page of data center locations, read September 14, 2026. [1]

1. Land & Parcel
Parcel located
2. Local Zoning
Zoning approved
3. Tax & EDA Deal
Not yet on file
4. Utility Grid Queue
Energized
5. Air & Water Permits
Not yet on file
What happens next: Facility is operational; air permit compliance, water reporting and utility filings are monitored.
Electricity Demand [1]
200 MW
the developer's figure

Equivalent to ~166,000 U.S. homes (U.S. EIA 830 homes/MW baseline) · 9.6% of Hoover Dam nameplate capacity (2,080 MW).

Grid interconnection and utility service tracked on file.

Cooling & Water
Not disclosed
Daily water volume not stated in public filings

U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.

No local property tax abatement amount disclosed in public filings.

Site & Buildings [1]
4 buildings
operator page

Assessor parcel acreage and building square footage are added when municipal or county filings are published.

Location: 1025 Cane Bay Boulevard, Moncks Corner, SC 29461.

Taxes & Permanent Jobs
Not disclosed
Tax and job figures not yet on file

State and local tax abatement agreements and permanent job commitments are recorded when filed.

No local property tax abatement amount disclosed in public filings.

Key specifications on the record

Power capacity
200 MW developer figure Equivalent to the continuous electricity demand of about 166,000 average U.S. homes based on U.S. Energy Information Administration residential consumption data. About 2 percent of New York City's summer peak demand in 2024.
[1] datacenters.google
Water usage
Not disclosed
Land area
Not disclosed
Buildings
4 buildings operator page
[1] datacenters.google
Backup generators
Not disclosed
Capital investment
Not disclosed
Commissioned
Operational since 2008 (18 years)
Who leads it
Google as stated by the source
Official project website
datacenters.google (opens in a new tab) verified October 28, 2026
datacenters.google (opens in a new tab)
Archived promotional websites
datacenters.google (opens in a new tab) [Wayback snapshot] (opens in a new tab) preserved in Internet Archive
tracked domains
Not disclosed
Who would use it, Jobs once it runs, Tax each year
The math behind the comparison
  1. Google Berkeley County data center, capacity: 200 MW.
  2. New York City (NYISO Zone J) summer peak demand, actual, 2024: 10,245 MW (2024).
  3. 200 ÷ 10,245 = 0.02 (MW over MW).

Sources:

A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: Google · Parent: Alphabet
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for Google Berkeley County data center.

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW) 200 MW 200 MW the developer's figure [1] datacenters.google
Site Footprint (Acres)
Data Hall Buildings 4 buildings 4 operator page [1] datacenters.google
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

  1. (source date; the content gives no date of its own)

    Google is investing $9 billion in three South Carolina AI data centre campuses through 2027

    [12] techbuzz.ai, also Post and Courier (opens in a new tab) public registry

  2. (source date; the content gives no date of its own)

    Google has 15 years of presence in South Carolina

    · Google · Reported October 13, 2025 · Privacy enhanced player · loads on click

    [13] youtube.com

  3. · Status: running (source date; the content gives no date of its own)

    Google data center expansion in South Carolina to become one of company's largest facilities

    [11] thestate.com

Every event in order

  • Read on September 14, 2026 (the day the page was read; it gives no date of its own)

    Google lists Google Berkeley County data center at Berkeley County, South Carolina on its own page of data center locations, read September 14, 2026.

    [1] datacenters.google

6 corrections to this record

Every correction, with its reason
  1. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  2. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier: video is tier 5 (the editor, September 23, 2026). The link did not change.

  3. · Timeline entry

    The note "(Entry dated by the video's upload date; see the correction.)" appended by the date correction of September 8, 2026 belongs in this log, not in the event sentence; the date basis of the row already says the date is the source's. The sentence is restored to the event only (September 13, 2026).

  4. · Date basis

    Date basis recorded (September 8, 2026, /methodology#dates): the row's date is the video's upload date, the source's own date, because the content gives no date of its own.

  5. · Date basis

    Date basis recorded (September 8, 2026, /methodology#dates): the row's date is the video's upload date, the source's own date, because the content gives no date of its own.

  6. · Timeline entry

    Dated by the video's upload date (ABC News 4, October 13, 2025), which is the source date; the content gives no other date.

Every correction on the record is on the corrections page.

Nearest data centers in South Carolina

Verified data center records in South Carolina within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
DartPoints Charleston Data Center (CHS1) Ladson, Charleston County 17 mi Running DartPoints 4 MW
Google Dorchester County data center Ridgeville, Dorchester County 32 mi Being built Google 150 MW
Eagle Rock Partners Colleton County Data Center Walterboro, Colleton County 42 mi Proposed Eagle Rock Partners 1 GW

Blank cell: not disclosed by any source on file.

Common questions about Google Berkeley County data center

Answered directly from the verified filings and local actions on this page.

Who is building Google Berkeley County data center?

Google is the developer. No construction contractor is named on the record yet.

How much power and water does Google Berkeley County data center say it needs?

Power: 200 MW (the developer's figure, datacenters.google (opens in a new tab)). Water: not disclosed by any source on file.

Where does Google Berkeley County data center stand today?

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Tracked project domains

Promotional domains, campaign sites, and municipal portals preserved through the Internet Archive.

Primary documents

  1. Google: Data center locations (opens in a new tab), Google, September 14, 2026

Reporting

  1. News | Tech Giant Expanding Operations in South Carolina - CoStar (opens in a new tab), CoStar, March 19, 2021, news outlet
  2. Google plans to spend $600 million expanding its SC data center - Post and Courier (opens in a new tab), Post and Courier, September 14, 2020, local outlet
  3. Google gets approval to triple its use of groundwater from Lowcountry aquifer - Live 5 News (opens in a new tab), Live 5 News, October 11, 2019, local outlet
  4. Google has a big economic presence in Berkeley County. But is it creating more jobs? - Post and Courier (opens in a new tab), Post and Courier, January 11, 2020, local outlet
  5. Google's Berkeley Co. expansion tops record list of SC economic development ventures - Post and Courier (opens in a new tab), Post and Courier, January 31, 2022, local outlet
  6. After aquifer concerns, Google's $600m South Carolina expansion finds new water supply - Data Center Dynamics (opens in a new tab), Data Center Dynamics, June 4, 2019, news outlet
  7. Google Looking Outside Berkeley County For Data Center Expansion - FITSNews (opens in a new tab), FITSNews, June 11, 2019, news outlet
  8. Editorial: Say ‘no’ to more Google water withdrawal - Post and Courier (opens in a new tab), Post and Courier, June 5, 2019, local outlet
  9. Google Moves In And Wants To Pump 1.5 Million Gallons Of Water Per Day - NPR (opens in a new tab), NPR, May 8, 2017, national outlet
  10. Expansion of Google data center in SC to make it one of the company’s largest - The State (opens in a new tab), The State, February 16, 2019, local outlet
  11. Google Drops $9B on South Carolina AI Data Centers - The Tech Buzz (opens in a new tab), The Tech Buzz, October 13, 2025, news outlet
  12. Google to invest $9 billion in South Carolina to build more data centers (opens in a new tab), YouTube, October 13, 2025, video

13 sources on file.

Regional grid context

This site is in the SERC Virginia and Carolina South (SRVC-S) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Google Berkeley County data center", https://datacenterrecord.org/projects/google-berkeley-county-data-center-sc, last verified October 27, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Google Berkeley County data center", https://datacenterrecord.org/projects/google-berkeley-county-data-center-sc. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Running
Tier
built from one source
Tags
Built from one source
Coordinates
33.19632, -80.01429
How the location is known
Location from the site's street address.
Location source
https://datacenters.google/locations/
Coordinate source
Google Berkeley County specification and Berkeley County parcel record
Location last verified
September 16, 2026
How capacity was disclosed
the developer's figure
Capacity, if disclosed
200 MW, the developer's figure
Published
September 14, 2026
Last verified
October 27, 2026
Not disclosed
Location source number, EPA registry id, Uses, Tenancy, Cooling, How water was disclosed, How acreage was disclosed, Interconnection, Rating of the county's rows

Researcher view · Google Berkeley County data center · 13 sources, 4 entries · basis and source tier on every row · verified October 27, 2026

Download CSV JSON