Data Center Record.

Proposed Built from one source

Eagle Rock Partners Colleton County Data Center

Walterboro, Colleton County, SCDeveloper: Eagle Rock PartnersCensus GEOID 45029

Stage
Proposed
Power
1 GW
the developer's figure
Buildings
9 buildings
zoning application, verified October 27, 2026
Undisclosed in public filings
Land, Water

Eagle Rock Partners proposed an 860 acre, nine building, 1,000 megawatt data center campus four miles southeast of Walterboro in Colleton County, South Carolina. It is proposed, since December 19, 2025.

How much water it would use and who would use it have not been disclosed.

Last verified · 1 source, 0 primary · Built from one source, not yet reviewed in depth by a person. · How to read this page

  • This record: Proposed, ringed
  • data center
  • Smaller pins: 19 other published records in South Carolina
Details
  • this record's location, ringed
  • parcel outline, from the county parcel record
  • city limits, U.S. Census Bureau, on a town level record
  • county boundary

The other pins are the published projects in the same state, each in its stage color. The imagery beneath is the USGS national orthoimagery, public domain, shown so the land around the site can be read.

How to read this page. Every fact links to the source it rests on; a number in brackets is its place in the source list. A figure no source gives reads Not disclosed, and nothing is estimated. Where sources give different figures, each is shown with who gave it, and another source's figure never stands in for the record's own. Entries are added and never overwritten; corrections are listed under What happened.

What is known

Each figure as its source gave it. The number in brackets is its place in the source list.

Buildings
9 buildings zoning application, verified October 27, 2026
Power it would draw
1 GW the developer's figure About 10 percent of New York City's summer peak demand in 2024.
Who leads it
Eagle Rock Partners as stated by the source
Undisclosed in public filings
Land, Water, Who would use it, Jobs once it runs, Tax each year
The math behind the comparison
  1. Eagle Rock Partners Colleton County Data Center, capacity: 1,000 MW.
  2. New York City (NYISO Zone J) summer peak demand, actual, 2024: 10,245 MW (2024).
  3. 1,000 ÷ 10,245 = 0.1 (MW over MW).

Sources:

A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).

Every field, with who said it and when (Researcher view)

Impact figures

FieldValueWho says soSourceLast verified
How much power it needs 1 GW the developer's figure colletoncounty.org (opens in a new tab) October 27, 2026
How much water it would use
How loud it would be
Jobs once it runs
Tax it would pay each year

The record's fields

FieldValueWho says soSourceLast verified
Who is building it Eagle Rock Partners as stated by the source October 27, 2026
Who is constructing it
How much land
Buildings 9 buildings zoning application, verified October 27, 2026 colletoncounty.org (opens in a new tab) October 27, 2026
Where its power comes from
Grid connection
How it is cooled

How much power it needs, also reported: 1 GW, 2026 (Walterboro Live (opens in a new tab): The ordinance allows data centers to be built on Mount Carmel Road and potentially a 1 gigawatt facility using electricity equivalent to 1 million homes.) .

A blank value cell means not disclosed by any source on file; a blank basis cell means the source gave the figure without saying on what basis.

The developer's figure is what the company said; what a permit allows is the ceiling a permit sets; measured means observed. Water is in gallons a day or a year, whichever the source stated; a tax claim given as a range shows both ends, each linked to the source that gave it.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

What was decided

Acts of Colleton County and Walterboro about data centers, on the record with their source. A rule about the area is not a decision about this record.

DateWhoDecisionSource
Colleton County restrictive Colleton County and Fairfield County are considering similar data center moratoriums southcarolinapublicradio.org (opens in a new tab)
Colleton County restrictive Miles Crosby and another resident sued to block a proposed 859 acre data center campus in Colleton County South Carolina latimes.com (opens in a new tab)
Colleton County restrictive Colleton County Council unanimously approved Digital Infrastructure Overlay ordinance on September 14, 2026, allowing data centers in designated zones after having a moratorium. walterborolive.com (opens in a new tab)
Colleton County restrictive Developments under the overlay would also need at least 300 acres of land to be approved. live5news.com (opens in a new tab)
Colleton County restrictive It also requires data centers to use closed loop water or air cooled cooling systems. live5news.com (opens in a new tab)
Colleton County restrictive The new overlay does set limits: a 65 decibel noise cap and 200 foot buffer setbacks. live5news.com (opens in a new tab)
4 earlier decisions on the county's rows
DateWhoDecisionSource
Colleton County restrictive The council passed a six month moratorium on data centers back in July. But that moratorium is now partially repealed and no longer applies west of Interstate 95, or in areas already zoned industrial with this overlay. live5news.com (opens in a new tab)
Colleton County restrictive County Council voted unanimously to approve a controversial zoning change that opens the door to data centers across much of the county's rural land, through a new Digital Infrastructure Overlay District. live5news.com (opens in a new tab)
Colleton County restrictive Colleton County Planning Commission and Council approved first reading on August 10, 2026 of ordinance for digital infrastructure overlay related to data centers blufftontoday.com (opens in a new tab)
Colleton County restrictive Colleton County Council approved six month moratorium on data centers in early July 2026 blufftontoday.com (opens in a new tab)

What happened

  1. · Status: proposed (content date)

    Eagle Rock Partners proposes a 860 acre, nine building, 1,000 megawatt data center campus four miles southeast of Walterboro in Colleton County, requiring a zoning exception and drawing community opposition over water and power concerns.

    [1] scdailygazette.com

Every event in order

The site

The pin is the site. The shaded outline is the parcel, from the county's own parcel record.

The site map is at the top of the page.

Where
Ritter Road and ACE Basin Highway, Walterboro, SC 29488, Walterboro, Colleton County, South Carolina [source] (opens in a new tab)
How exactly it is located
Exact, on the parcel
The parcel
No parcel outline in the public record
Nearest homes
Not computed for a record placed at a place center

USGS NAIP aerial view of Eagle Rock Partners Colleton County Data Center
LAT 32.86240 / LON -80.61280 Imagery: U.S. Geological Survey / USDA NAIP (Public Domain)

Comparisons

2 metrics with more than one figure

Every figure on the record for the same thing, the record's own or the document's first, each with who gave it, its date and its basis.

Capacity at full buildout

2 figures, 2 sources
Show each source's words
  • 1 GW, Walterboro Live: The ordinance allows data centers to be built on Mount Carmel Road and potentially a 1 gigawatt facility using electricity equivalent to 1 million homes.

Project footprint

1 figure, 1 source
Show each source's words
  • 859 acres, latimes.com: Colleton County South Carolina data center proposal would have been 859 acres

Questions about this project

7 questions answered from the record

Answered from the rows on this page.

How big is Eagle Rock Partners Colleton County Data Center?

The record has 2 measures of its size: 1 GW (the developer's figure, colletoncounty.org (opens in a new tab)) and 9 buildings (zoning application, verified October 27, 2026, colletoncounty.org (opens in a new tab)). Its acreage is not disclosed.

Who is building Eagle Rock Partners Colleton County Data Center?

Eagle Rock Partners is the developer. No construction contractor is named on the record yet.

Who will use Eagle Rock Partners Colleton County Data Center?

Not disclosed. No source on file names a tenant, says whether the site is single or multi tenant, or states what it is for. The record keeps the use as not disclosed until one does; see Who it serves.

How much power and water does Eagle Rock Partners Colleton County Data Center say it needs?

Power: 1 GW (the developer's figure, colletoncounty.org (opens in a new tab)). Water: not disclosed by any source on file.

What has Walterboro or Colleton County decided about it?

Colleton County (rated restrictive): Colleton County and Fairfield County are considering similar data center moratoriums (reported September 23, 2026, southcarolinapublicradio.org (opens in a new tab)); and Colleton County: Miles Crosby and another resident sued to block a proposed 859 acre data center campus in Colleton County South Carolina (reported September 14, 2026, latimes.com (opens in a new tab)). 10 events are on the county's rows; a rule about the area is not a decision about this record.

What is still unknown about Eagle Rock Partners Colleton County Data Center?

Not disclosed by any source on file: how much water it would use, how loud it would be, jobs once it runs, tax it would pay each year, who is constructing it, how much land, where its power comes from, grid connection, how it is cooled. No missing primary document is listed for this record yet; What the record lacks is where one appears when a person names it.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Reporting

  1. Gigawatt data center proposal draws opposition from SC Lowcountry residents, politicians - South Carolina Daily Gazette (opens in a new tab), South Carolina Daily Gazette, December 19, 2025, query feed

1 source on file.

Regional grid context

This site is in the SERC Virginia and Carolina South (SRVC-S) regional power market. 2024 to 2025 wholesale price effect: 7.5 percent (+$3.01 per MWh, 2024 to 2025), modeled wholesale price effect, Dallas Fed WP 2606r1, third party estimate. 2028 projected wholesale price effect: 14.7 percent (+$4.94 per MWh, 2028 projected), modeled wholesale price effect, Dallas Fed WP 2606r1, third party estimate.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

What researchers have found

These studies measure different things. Some model wholesale market prices. Some measure what households actually paid. Some model what would happen under a policy change. The record shows each one as the authors stated it and does not rank them.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Eagle Rock Partners Colleton County Data Center", https://datacenterrecord.org/projects/eagle-rock-partners-colleton-county-data-center-walterboro-sc, last verified October 27, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Eagle Rock Partners Colleton County Data Center", https://datacenterrecord.org/projects/eagle-rock-partners-colleton-county-data-center-walterboro-sc. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Proposed
Tier
built from one source
Tags
Built from one source
Coordinates
32.8624, -80.6128
How the location is known
Location from the county parcel record.
Location source
https://www.colletoncounty.org/
Coordinate source
Colleton County zoning application near Walterboro
How capacity was disclosed
the developer's figure
Capacity, if disclosed
1 GW, the developer's figure
Rating of the county's rows
Restrictive
Published
September 28, 2026
Last verified
October 27, 2026
Undisclosed in public filings
Location source number, Location last verified, EPA registry id, Uses, Tenancy, Cooling, How water was disclosed, How acreage was disclosed, Interconnection

Researcher view · Eagle Rock Partners Colleton County Data Center · 1 source, 1 entry, 10 decisions nearby · basis and source tier on every row · verified October 27, 2026

Download CSV JSON