Data Center Record.
Census GEOID: 45035 Location Precision: assessor parcel Jump to Entity & Permit Table Commercial & Bulk Data (CC BY-NC 4.0)

Last verified: · 2 primary and 4 reporting sources

● Being Built Reported May 28, 2026 · 2 Buildings

Google Dorchester County data center

Street address Pine Hill Business Campus, Ridgeville, SC 29472, Dorchester County assessor parcel Exact, on the parcel [1] Google: Data center locations

Overview, regulatory gates and specifications

Google is constructing a second Lowcountry hyperscale data center campus at the Pine Hill Business Campus in Ridgeville, Dorchester County, South Carolina. [1] Filings on the record specify disclosed capacity of 150 MW (the developer's figure), 2 planned or operational buildings. [1] Google lists Google Dorchester County data center at Dorchester County, South Carolina on its own page of data center locations, read September 14, 2026. [1]

1. Land & Parcel
Parcel located
2. Local Zoning
Zoning approved
3. Tax & EDA Deal
Not yet on file
4. Utility Grid Queue
150 MW disclosed
5. Air & Water Permits
Not yet on file
What happens next: Campus is under construction; building inspections, utility energization and air permits are monitored.
Electricity Demand [1]
150 MW
the developer's figure

Equivalent to ~124,500 U.S. homes (U.S. EIA 830 homes/MW baseline) · 7.2% of Hoover Dam nameplate capacity (2,080 MW).

Grid interconnection and utility service tracked on file.

Cooling & Water
Not disclosed
Daily water volume not stated in public filings

U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.

No local property tax abatement amount disclosed in public filings.

Site & Buildings [1]
2 buildings
operator page

Assessor parcel acreage and building square footage are added when municipal or county filings are published.

Location: Pine Hill Business Campus, Ridgeville, SC 29472.

Taxes & Permanent Jobs
Not disclosed
Tax and job figures not yet on file

State and local tax abatement agreements and permanent job commitments are recorded when filed.

No local property tax abatement amount disclosed in public filings.

Key specifications on the record

Power capacity
150 MW developer figure Equivalent to the continuous electricity demand of about 124,500 average U.S. homes based on U.S. Energy Information Administration residential consumption data. About 1 percent of New York City's summer peak demand in 2024.
[1] datacenters.google
Water usage
Not disclosed
Land area
Not disclosed
Buildings
2 buildings operator page
[1] datacenters.google
Backup generators
Not disclosed
Capital investment
Not disclosed
Who leads it
Google as stated by the source
Official project website
datacenters.google (opens in a new tab) verified October 28, 2026
datacenters.google (opens in a new tab)
Archived promotional websites
datacenters.google (opens in a new tab) [Wayback snapshot] (opens in a new tab) preserved in Internet Archive
tracked domains
Not disclosed
Who would use it, Jobs once it runs, Tax each year
The math behind the comparison
  1. Google Dorchester County data center, capacity: 150 MW.
  2. New York City (NYISO Zone J) summer peak demand, actual, 2024: 10,245 MW (2024).
  3. 150 ÷ 10,245 = 0.01 (MW over MW).

Sources:

A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Annie Andrews

Pediatrician and Democratic U.S. Senate Nominee · South Carolina Democratic Party

DID Recorded statement at The New York Times (October 27, 2026) [2]
SAID Democratic U.S. Senate nominee Dr. Annie Andrews called for a two year statewide moratorium on new data center construction in South Carolina, arguing that unchecked hyperscale development threatens household electricity rates, water supplies, and county tax bases. (October 27, 2026) [2]
Darline Graham

Darline Graham

U.S. Senator · South Carolina

DID Recorded statement at The New York Times (October 27, 2026) [2]
SAID Senator Darline Graham opposed calls for a data center moratorium in South Carolina and defended hyperscale artificial intelligence infrastructure as essential to U.S. national security in competition with China, while the AI industry super PAC Building the Future reserved $1.5 million in television advertising supporting his reelection. (October 27, 2026) [2]
Henry McMaster

Henry McMaster

Governor of South Carolina · South Carolina

DID Recorded statement at spectrumlocalnews.com (September 26, 2024)
SAID Governor Henry McMaster stated Google investment will strengthen South Carolina position as emerging leader in technology and innovation (September 26, 2024) spectrumlocalnews.com (opens in a new tab)

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: Google · Parent: Alphabet
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for Google Dorchester County data center.

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW) 150 MW the developer's figure [1] datacenters.google
Site Footprint (Acres)
Data Hall Buildings 2 buildings operator page [1] datacenters.google
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

  1. · Status: being built (source date; the content gives no date of its own)

    Google hosted a meet and greet in St. George related to data center expansion

    [5] counton2.com

Every event in order

  • Read on September 14, 2026 (the day the page was read; it gives no date of its own)

    Google lists Google Dorchester County data center at Dorchester County, South Carolina on its own page of data center locations, read September 14, 2026.

    [1] datacenters.google

1 correction to this record

Every correction, with its reason
  1. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

Every correction on the record is on the corrections page.

Nearest data centers in South Carolina

Verified data center records in South Carolina within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
Eagle Rock Partners Colleton County Data Center Walterboro, Colleton County 22 mi Proposed Eagle Rock Partners 1 GW
DartPoints Charleston Data Center (CHS1) Ladson, Charleston County 31 mi Running DartPoints 4 MW
Google Berkeley County data center Moncks Corner, Berkeley County 32 mi Running Google 200 MW
Hilton Head Area Data Centers Bluffton, Beaufort County 53 mi Proposed 2 buildings

Blank cell: not disclosed by any source on file.

Comparisons

1 metric with more than one figure

Every figure on the record for the same thing, each with who gave it, its date and its basis.

Permanent jobs

1 figure, 1 source
Show each source's words
  • 200 jobs, spectrumlocalnews.com: Google Dorchester County data centers will create 200 new jobs

Common questions about Google Dorchester County data center

Answered directly from the verified filings and local actions on this page.

Who is building Google Dorchester County data center?

Google is the developer. No construction contractor is named on the record yet.

Who will use Google Dorchester County data center?

Not disclosed. No source on file names a tenant, says whether the site is single or multi tenant, or states what it is for. The record keeps the use as not disclosed until one does; see Who it serves.

How much power and water does Google Dorchester County data center say it needs?

Power: 150 MW (the developer's figure, datacenters.google (opens in a new tab)). Water: not disclosed by any source on file.

Where does Google Dorchester County data center stand today?

It is being built, as reported May 28, 2026. The newest entry, reported May 28, 2026: Google hosted a meet and greet in St. George related to data center expansion [5].

What is still unknown about Google Dorchester County data center?

Not disclosed by any source on file: how much water it would use, how loud it would be, jobs once it runs, tax it would pay each year, who is constructing it, how much land, where its power comes from, grid connection, how it is cooled. No missing primary document is listed for this record yet; What the record lacks is where one appears when a person names it.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Tracked project domains

Promotional domains, campaign sites, and municipal portals preserved through the Internet Archive.

Primary documents

  1. Google: Data center locations (opens in a new tab), Google, September 14, 2026
  2. AI Industry Super PAC Spends $1.5 Million to Back Graham in Tight South Carolina Senate Race (opens in a new tab), The New York Times, October 27, 2026

Reporting

  1. Google gets approval for Charleston area data center expansion - Post and Courier (opens in a new tab), Post and Courier, August 28, 2018, local outlet
  2. Editorial: Google glistens in water agreement - Post and Courier (opens in a new tab), Post and Courier, December 12, 2019, local outlet
  3. Google to host data center meet and greet in St. George as the tech giant expands in the region - WCBD News 2 (opens in a new tab), WCBD News 2, May 28, 2026, news outlet
  4. Google to invest $9 billion in South Carolina to build more data centers (opens in a new tab), YouTube, October 13, 2025, video

6 sources on file.

Regional grid context

This site is in the SERC Virginia and Carolina South (SRVC-S) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Google Dorchester County data center", https://datacenterrecord.org/projects/google-dorchester-county-data-center-sc, last verified October 27, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Google Dorchester County data center", https://datacenterrecord.org/projects/google-dorchester-county-data-center-sc. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Being built
Tier
built from one source
Tags
Built from one source
Coordinates
33.186, -80.57565
How the location is known
Location from the county parcel record.
Location source
https://datacenters.google/locations/
Coordinate source
Google Dorchester County specification and Dorchester County Pine Hill Business Campus record
Location last verified
September 16, 2026
How capacity was disclosed
the developer's figure
Capacity, if disclosed
150 MW, the developer's figure
Published
September 14, 2026
Last verified
October 27, 2026
Not disclosed
Location source number, EPA registry id, Uses, Tenancy, Cooling, How water was disclosed, How acreage was disclosed, Interconnection, Rating of the county's rows

Researcher view · Google Dorchester County data center · 6 sources, 2 entries · basis and source tier on every row · verified October 27, 2026