Google operates a 12 building hyperscale data center campus at 7025 Adams Center Road in Fort Wayne, Allen County, Indiana. [3] Filings on the record specify disclosed capacity of 400 MW (the developer's figure). [2] Google data center under construction on Adams Center Road in southeast Fort Wayne is exempt from proposed moratorium legislation [30]
Equivalent to ~332,000 U.S. homes (U.S. EIA 830 homes/MW baseline) · 19% of Hoover Dam nameplate capacity (2,080 MW).
Electric utility: ultra-low sulfur diesel or Hydrotreated Vegetable Oil (HVO).
U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.
No local property tax abatement amount disclosed in public filings.
Assessor parcel acreage and building square footage are added when municipal or county filings are published.
Location: 7025 Adams Center Road, Fort Wayne, IN 46816.
State and local tax abatement agreements and permanent job commitments are recorded when filed.
No local property tax abatement amount disclosed in public filings.
Sources:
A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).
Connected government officials, corporate entities, utilities and local rules on the public record.
Stutzman said data center operators should provide their own power and pay those costs upfront instead of receiving substantial tax abatements and write offs at the beginning of a project(October 15, 2026) wowo.com (opens in a new tab)
Councilwoman Rohli Booker introduced ordinance creating committee and moratorium on data centers(September 23, 2026) [30]
Google says the generators will use ultra low sulfur diesel or a renewable alternative.(September 22, 2026) [31]
Blaine Sefton, forum attendee, expresses frustration with offloading questions to website and email(December 11, 2025) 21alivenews.com (opens in a new tab)
View all 11 statements on the record in Indiana →
Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.
Disclosed engineering ceilings, reported actuals and primary regulatory basis for Google Fort Wayne data center.
| Field / Parameter | Disclosed Ceiling | Reported Actual | Basis & Primary Source |
|---|---|---|---|
| Electrical Capacity (MW) | 400 MW | 400 MW | the developer's figure [2] datacenters.google |
| Site Footprint (Acres) | |||
| Data Hall Buildings | 12 buildings | 12 | operator page [2] datacenters.google |
| Cooling & Water System | |||
| Backup Diesel / Gas Generators | |||
| Tax Abatement & Annual Revenue |
Blank cell: not disclosed by any source on file.
The record adds each the day a source gives it. Why these documents.
Chronological regulatory, corporate and permitting events on the record, newest first.
Moratorium (source date; the content gives no date of its own)
Google data center under construction on Adams Center Road in southeast Fort Wayne is exempt from proposed moratorium legislation
(source date; the content gives no date of its own)
Google's data center was first proposed as Project Zodiac and officially announced in spring 2024
(source date; the content gives no date of its own)
Earlier permit included 140 emergency generators, five smaller generators, dozens of diesel fuel tanks and nearly 50 cooling towers
(source date; the content gives no date of its own)
Google filed request for 228 additional diesel generators at Fort Wayne data center
(source date; the content gives no date of its own)
IDEM approved request in April to increase backup generators from 34 to 179.
(source date; the content gives no date of its own)
IDEM approved Google's request in April 2026 to increase backup generators from 34 to 179.
Air permit review (source date; the content gives no date of its own)
Google filed an air permit modification application in September 2026 requesting 228 more generators at the Fort Wayne data center.
(source date; the content gives no date of its own)
IDEM approved previous air permit modification in April allowing more than 140 additional emergency generators
(source date; the content gives no date of its own)
In September of last year, IDEM approved a similar request to fill more than two acres of wetlands in an earlier expansion phase.
(source date; the content gives no date of its own)
The department approved developers' request to fill just over two acres of wetlands earlier this month.
(source date; the content gives no date of its own)
IDEM first approved 34 main diesel generators for the project back in 2024.
(source date; the content gives no date of its own)
In April, IDEM approved a request to add more than 140 emergency diesel generators to the data center campus.
Filing (source date; the content gives no date of its own)
Google submitted a request to the Indiana Department of Environmental Management to add 228 emergency generators to its Fort Wayne data center.
(source date; the content gives no date of its own)
Google must not clear trees at Fort Wayne data center from April 1 to September 30 to protect federally protected Indiana bat habitat.
(source date; the content gives no date of its own)
Google must purchase wetland credits from Openings Wetland Mitigation Bank and Indiana Stream and Wetland Mitigation Program to mitigate wetland impact.
(source date; the content gives no date of its own)
IDEM approved Google's request to fill in additional four acres of wetlands on Fort Wayne data center property.
(source date; the content gives no date of its own)
This is Google's third air permit modification for the Fort Wayne data center since introduction.
(source date; the content gives no date of its own)
Original request for Fort Wayne data center was 34 diesel generators.
(source date; the content gives no date of its own)
Google requests 228 additional diesel emergency generators for Fort Wayne data center on top of 174 existing generators.
(source date; the content gives no date of its own)
Google filed request for 200+ additional emergency generators at Fort Wayne data center
(source date; the content gives no date of its own)
Google received approval to add 140+ generators at Fort Wayne data center five months prior to this new request
(source date; the content gives no date of its own)
Google submitted request for 200+ additional backup generators at Fort Wayne data center
(source date; the content gives no date of its own)
Developers must provide proof of purchase for wetland credits within one year
(source date; the content gives no date of its own)
Developers must purchase 4.26 acres of forested wetland mitigation
· running (source date; the content gives no date of its own)
Google held an open house on August 21 to discuss data center project
Read on September 14, 2026 (the day the page was read; it gives no date of its own)
Google lists Google Fort Wayne data center at Fort Wayne, Indiana on its own page of data center locations, read September 14, 2026.
Verified data center records in Indiana within 60 miles by straight line distance.
| Facility & Location | Distance | Stage | Operator / Tenant | Disclosed Scale |
|---|---|---|---|---|
| Lifeline Data Centers Fort Wayne Fort Wayne, Allen County | 5 mi | Running | Lifeline Data Centers | 6 MW |
Blank cell: not disclosed by any source on file.
Answered directly from the verified filings and local actions on this page.
Google is the developer. No construction contractor is named on the record yet.
Not disclosed. No source on file names a tenant, says whether the site is single or multi tenant, or states what it is for. The record keeps the use as not disclosed until one does; see Who it serves.
Power: 400 MW (the developer's figure, datacenters.google (opens in a new tab)). Water: not disclosed by any source on file.
It is running, as reported August 21, 2026. The newest entry, reported September 23, 2026: Google data center under construction on Adams Center Road in southeast Fort Wayne is exempt from proposed moratorium legislation [30].
Not disclosed by any source on file: how much water it would use, how loud it would be, jobs once it runs, tax it would pay each year, who is constructing it, how much land, grid connection, how it is cooled. No missing primary document is listed for this record yet; What the record lacks is where one appears when a person names it.
Official operator or facility campus page verified in 50 state website discovery pass.
35 sources on file.
This site is in the RFC West (RFCW) regional power market.
Every number on this page comes from a named source. Click any source to open the document in a new tab.
If a link has moved or a document has changed, let us know and we will update the record and log the change.
Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.
Data Center Record. Google Fort Wayne data center. Last verified October 27, 2026. https://datacenterrecord.org/projects/google-fort-wayne-data-center-in. Accessed November 22, 2026.
Every row on this page is available to download with its source, its basis and the date it was last verified.
Download this page's records (CSV) JSON
Licensed CC BY-NC 4.0. Say where it came from and do not sell it or use it to train a commercial model without a license.
Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.
Data Center Record takes no money from data center developers, operators, utilities or trade groups. That rule does not change for licensing.
Data Center Record is an independent project and takes no money from data center developers, operators, utilities or trade groups. Reader support keeps the record free to read, with no ads and no paywall.
Last verified , first recorded . Every correction is logged on the corrections page. Report a correction · Send a tip about Google Fort Wayne data center
Data Center Record, "Google Fort Wayne data center", https://datacenterrecord.org/projects/google-fort-wayne-data-center-in. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.
The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.