Census GEOID: 25013 Location Precision: county centroid Jump to Entity & Permit Table Commercial & Bulk Data (CC BY-NC 4.0)

Last verified: · 5 reporting sources

● Proposed Campus Reported May 4, 2026

Holyoke Paper Mill Data Center

Location Holyoke, Hampden County, Massachusetts county centroid County level, the county seat

Overview, regulatory gates and specifications

A developer plans a $200 million data center at a former Holyoke paper mill, while city councilors are considering a ban on data centers. [1] Facility received highest rating for energy efficiency from U.S. Green Building Council in 2013 [3]

Verified Site & Permit Summary
Verified address
Holyoke, Hampden County, Massachusetts county centroid
Operator / developer
Not disclosed in filing
Permit / registry ID
masslive.com on file [1]

How much power it needs, how much water it would use and who would use it have not been disclosed.

What happens next: Next public milestones include utility queue filings, state environmental permits and local site plan review.

Key specifications on the record

Power capacity
Not disclosed Reported by others: 12 MW (WBUR (opens in a new tab)). Their figure, not the record's.
Water usage
Not disclosed Reported by others: 30,000 gallons per day (WBUR (opens in a new tab)). Their figure, not the record's.
Land area
Not disclosed
Buildings
Not disclosed
Backup generators
Not disclosed
Capital investment
Not disclosed
Not disclosed
Who leads it, Who would use it, Jobs once it runs, Tax each year

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

John Goodhue

executive director

DID Recorded statement at WBUR (September 11, 2026) [3]
SAID Massachusetts Green High Performance Computing Center operates on carbon free power (September 11, 2026) [3]

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: Not disclosed
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for Holyoke Paper Mill Data Center.

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW)
Site Footprint (Acres)
Data Hall Buildings
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Power the campus would draw A utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Who is behind it A land record, a zoning application or a company's own announcement.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

  1. (source date; the content gives no date of its own)

    Facility received highest rating for energy efficiency from U.S. Green Building Council in 2013

    [3] wbur.org

  2. (source date; the content gives no date of its own)

    Data center developers are pointing out assets at Holyoke site

    [5] masslive.com

  3. · Status: rumored (source date; the content gives no date of its own)

    Data center expansion in Lowell has affected the town

    [4] thecrimson.com

Every event in order

2 corrections to this record

Every correction, with its reason
  1. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  2. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

Every correction on the record is on the corrections page.

Nearest data centers in Massachusetts

Verified data center records in Massachusetts within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
TierPoint Boston Boston, Suffolk County ~52 mi Running TierPoint 1 building

Blank cell: not disclosed by any source on file.

Comparisons

2 metrics with more than one figure

Every figure on the record for the same thing, each with who gave it, its date and its basis.

Capacity at full buildout

1 figure, 1 source
12 MW Reported

WBUR, Sep 11, 2026

Show each source's words
  • 12 MW, WBUR: Data center is permitted to draw up to 12 megawatts of energy from the grid

Water a day

1 figure, 1 source
30,000 gallons per day Reported

WBUR, Sep 11, 2026

Show each source's words
  • 30,000 gallons per day, WBUR: Data center consumes between 20 to 30,000 gallons of water per day

Common questions about Holyoke Paper Mill Data Center

Answered directly from the verified filings and local actions on this page.

Who is building Holyoke Paper Mill Data Center?

Not disclosed. No source on file names the developer. The sources read for this record are listed under Sources.

Who will use Holyoke Paper Mill Data Center?

Not disclosed. No source on file names a tenant, says whether the site is single or multi tenant, or states what it is for. The record keeps the use as not disclosed until one does; see Who it serves.

How much power and water does Holyoke Paper Mill Data Center say it needs?

Power: not disclosed by any source on file. Water: not disclosed by any source on file.

Where does Holyoke Paper Mill Data Center stand today?
What is still unknown about Holyoke Paper Mill Data Center?

Not disclosed by any source on file: how much power it needs, how much water it would use, how loud it would be, jobs once it runs, tax it would pay each year, who is building it, who is constructing it, how much land, buildings, where its power comes from, grid connection, how it is cooled. No missing primary document is listed for this record yet; What the record lacks is where one appears when a person names it.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Reporting

  1. Developer plans $200M data center at former Holyoke paper mill: ‘We have the power’ - masslive.com (opens in a new tab), masslive.com, June 2, 2026, local outlet
  2. Holyoke councilors mull data center ban as developer seeks former complex - WAMC (opens in a new tab), WAMC, June 16, 2026, local outlet
  3. Holyoke banned new data centers. But it likes the eco-conscious one it already has - WBUR (opens in a new tab), WBUR, September 11, 2026, local outlet
  4. Lessons From Lowell: How a Data Center’s Expansion Has Choked a Small Town - The Harvard Crimson (opens in a new tab), The Harvard Crimson, May 4, 2026, news outlet
  5. At Holyoke site, data center developers point out assets - MassLive (opens in a new tab), MassLive, June 15, 2026, local outlet

5 sources on file.

Regional grid context

This site is in the NPCC New England (NEWE) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Holyoke Paper Mill Data Center", https://datacenterrecord.org/projects/holyoke-paper-mill-data-center-ma, last verified September 17, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Holyoke Paper Mill Data Center", https://datacenterrecord.org/projects/holyoke-paper-mill-data-center-ma. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Proposed
Tier
built from one source
Tags
Built from one source
Coordinates
42.11241, -72.54745
How the location is known
Location is the county seat; exact site not disclosed.
Location source
County seat (Springfield), Wikidata, placed at county level
Coordinate source
wikidata county seat
Location last verified
September 16, 2026
Published
September 5, 2026
Last verified
September 17, 2026
Not disclosed
Location source number, EPA registry id, Uses, Tenancy, Cooling, How capacity was disclosed, How water was disclosed, How acreage was disclosed, Interconnection, Capacity, if disclosed, Rating of the county's rows

Researcher view · Holyoke Paper Mill Data Center · 5 sources, 3 entries · basis and source tier on every row · verified September 17, 2026