"We have had nothing but noise. We have dust, dirt. We have all kinds of mist"
Context & source notes
Provenance: Quoted; content date; reported from elsewhere.
Setting: Her residence in Lowell.
Primary source: eNCA (opens in a new tab).
Massachusetts has 8 data center sites, 0 buildings where disclosed on the record: 5 running and 3 proposed. Most are in Suffolk County (4) and Middlesex County (2), and records are in 4 of 14 counties. The largest proposal is Holyoke Paper Mill Data Center in Hampden County; it is reported, as reported May 4, 2026.
How to read this page. Every count comes from the records on this page and links to where it is counted. Nothing is published until a person reads its source, and a figure no source gives reads Not disclosed; nothing is estimated. A rating changes only when a person sets it.
A blank cell means not disclosed by any source on file. Power is the developer's figure or a permit's, each linked on the record. All 8 Massachusetts projects.
| Record | Place | Stage | Operator | MW | Basis | Located | Tier | Verified |
|---|---|---|---|---|---|---|---|---|
| Grafton Data Center | Grafton, Worcester | Not yet verified | EPA registry | 2 | 2026-10-20 | |||
| Centersquare Boston data center | Boston, Suffolk | Running | Centersquare | centroid | 1 | 2026-09-17 | ||
| DataBank Boston data center | Boston, Suffolk | Running | DataBank | centroid | 2 | 2026-09-17 | ||
| Digital Realty Needham | Needham, Norfolk | Running | Digital Realty | centroid | 2 | 2026-09-17 | ||
| Equinix BO2 | Billerica, Middlesex | Running | Equinix | centroid | 2 | 2026-09-17 | ||
| TierPoint Boston | Boston, Suffolk | Running | TierPoint | centroid | 2 | 2026-09-17 | ||
| Holyoke Paper Mill Data Center | Holyoke, Hampden | Proposed | centroid | 4 | 2026-09-17 | |||
| Boston Neighborhood Data Center | Boston, Suffolk | Proposed | centroid | 4 | 2026-09-17 | |||
| Markley Group Lowell Data Center | Lowell, Middlesex | Proposed | Markley Group | centroid | 4 | 2026-09-17 |
Tier 1: an official or company source. Tier 2: a news report resolving to the outlet's own page. Located: a site coordinate from a permit, a parcel or an address, or the county or town centroid. Verified: the last day a person read the source. A blank cell means not disclosed by any source on file.
| County | Census GEOID | Projects | Rules |
|---|---|---|---|
| Suffolk County | 25025 | 0 | |
| Middlesex County | 25017 | 0 | |
| Hampden County | 25013 | 1 | |
| Norfolk County | 25021 | 0 | |
| Essex County | 25009 | 1 | |
| Barnstable County | 25001 | 0 | 0 |
| Berkshire County | 25003 | 0 | 0 |
| Bristol County | 25005 | 0 | 0 |
| Dukes County | 25007 | 0 | 0 |
| Franklin County | 25011 | 0 | 0 |
| Hampshire County | 25015 | 0 | 0 |
| Nantucket County | 25019 | 0 | 0 |
| Plymouth County | 25023 | 0 | 0 |
| Worcester County | 25027 | 0 | 0 |
A county without a record is listed, not linked.
What the state and its counties and cities have decided. Each row is rated by what it has decided, open, case by case, restrictive or closed, never by whether that is good or bad.
| Body | Level | Rating | In force until | Latest act | Acts | Verified |
|---|---|---|---|---|---|---|
| Massachusetts | state | Healey paused new applications for the state's data center sales tax exemption in June 2026. capecodtimes.com (opens in a new tab) local outlet Jun 1, 202641 acts on this rowEvery act on the Massachusetts row
| 41 | 2026-09-24 | ||
| Mansfield | city | Mansfield voters passed near total ban on data centers in May 2026. yahoo.com (opens in a new tab) national outlet Sep 8, 20263 acts on this rowEvery act on the Mansfield row
| 3 | 2026-09-24 | ||
| Lowell | city | until February 24, 2027 | 2027-02-24 | Lowell City Council imposed a 360 day moratorium on data centers in March. bostonherald.com (opens in a new tab) local outlet Mar 1, 20267 acts on this rowEvery act on the Lowell row
| 7 | 2026-09-23 |
| Holyoke | city | Holyoke approved a ban on data centers earlier this year. bostonglobe.com (opens in a new tab) local outlet Sep 8, 20262 acts on this rowEvery act on the Holyoke row
| 2 | 2026-09-23 | ||
| Agawam | city | Agawam city council approved a temporary hold on data center developments while drafting a preliminary ordinance. atmmarketplace.com (opens in a new tab) news outlet Sep 22, 20262 acts on this rowEvery act on the Agawam row
| 2 | 2026-09-22 | ||
| Salem | city | not rated | Salem City Council passed first reading of a zoning ordinance to ban data centers with an aggregate energy demand of two megawatts or higher on September 25, 2026. patch.com (opens in a new tab) local outlet Sep 251 act on this rowEvery act on the Salem row
| 1 | 2026-09-25 | |
| Westfield | city | until September 8, 2027 | 2027-09-08 | City councilors in Westfield voted earlier this year to enact a one year moratorium on additional data centers. bostonglobe.com (opens in a new tab) local outlet Sep 8, 20261 act on this rowEvery act on the Westfield row
| 1 | 2026-09-08 |
Reported: the source's date; the item names no day of its own. A month with no day: the source names the month and not the day. A rating rests only on a binding act in force; "not rated" means no person has set one. A blank cell means the record holds nothing for it.
No statute, commission order, tariff, tax rule, moratorium or bill on data centers at the state level is on the record for Massachusetts yet. The Massachusetts laws page is where one appears when a person publishes it.
0 bills tracked in Massachusetts; 194th General Court, legislature in session; last checked October 26, 2026. The last check found: No data center bills found as of October 26, 2026. Search terms: data center, data centre, large load, hyperscale, computing facility, server farm, high load factor (indirect), energy intensive facility (indirect), large electric load (indirect), digital asset mining (indirect), cryptocurrency mining (indirect), qualified technology facility (indirect), colocation (indirect), moratorium (with another term), sales tax exemption (with another term). The search on LegiScan. (opens in a new tab)
Bill data from LegiScan (opens in a new tab), licensed CC BY 4.0 (opens in a new tab). The record chooses the bills, writes each stage in its own words and cites the legislature's own page for every bill.
| Member | Party | Position |
|---|---|---|
| Auchincloss | D | Yea |
| Clark (MA) | D | Yea |
| Keating | D | Yea |
| Lynch | D | Yea |
| McGovern | D | Yea |
| Moulton | D | Yea |
| Neal | D | Yea |
| Pressley | D | Yea |
| Trahan | D | Yea |
A blank party cell means the clerk's roll gives none.
| Member | Party | Position |
|---|---|---|
| Markey (D-MA) | D | Nay |
| Warren (D-MA) | D | Nay |
A blank party cell means the clerk's roll gives none.
Positions as the clerk records them. How bills and votes are recorded.
Moratorium adoptedSalem
Scorecard eventMansfield
Scorecard eventMassachusetts
MoratoriumMassachusetts
MoratoriumAgawam
Scorecard eventAgawam
Agawam city council voted unanimously to ban cryptocurrency ATMs, requiring removal within 90 days.
The Markley Group serves more than 600 clients in Massachusetts and connects the digital infrastructure that powers our economy, our schools, and the everyday needs of our community
Governor Maura Healey asking data centers to bring their own clean energy
Every Massachusetts statement, by speaker (30)
"We have had nothing but noise. We have dust, dirt. We have all kinds of mist"
Provenance: Quoted; content date; reported from elsewhere.
Setting: Her residence in Lowell.
Primary source: eNCA (opens in a new tab).
Matthew Madden noted executive order does not provide detailed grandfathering rule or guidance as to projects already in permitting or development process
Provenance: Paraphrased; said in the source itself.
Primary source: Bowditch & Dewey (opens in a new tab).
In June , Senator Markey wrote to EPA Administrator Zeldin to demand the withdrawal of a proposed rule that undermines Clean Air Act permitting standards to facilitate the buildout of data centers and associated fossil fuel infrastructure.
Provenance: Paraphrased; said in the source itself.
Primary source: markey.senate.gov (opens in a new tab).
Archived copy: Wayback Machine (opens in a new tab).
Proposed data center regulations would require data centers to bring their own water resilience
Provenance: Paraphrased; said in the source itself.
Primary source: The Boston Globe (opens in a new tab).
Mayor Dominick Pangallo advocated for the ordinance banning data centers citing Salem's size, density, economic viability and desire to remain affordable for residents and workers.
Provenance: Paraphrased; content date; reported from elsewhere.
Primary source: Patch (opens in a new tab).
Salem Mayor Dominick Pangallo proposed an ordinance that would prohibit large AI data centers from being built in Salem.
Provenance: Paraphrased; said in the source itself.
Primary source: The Boston Globe (opens in a new tab).
Anthony Russo, City Council President, stated Gov. Maura Healey executive order grants municipalities authority over data center approvals.
Provenance: Paraphrased; said in the source itself.
Primary source: ATM Marketplace (opens in a new tab).
Ed Gaskin, columnist, argues that municipalities should develop comprehensive data center strategies including capital transformation plans and transparent incentive policies before developers arrive
Provenance: Paraphrased; said in the source itself.
Primary source: bostonherald.com (opens in a new tab).
Ed Gaskin proposes that host municipalities keep 100% of property taxes, PILOT payments, infrastructure reimbursements, and community benefits, with separate statewide data center contribution to Green Zone Investment Fund
Provenance: Paraphrased; said in the source itself.
Primary source: bostonherald.com (opens in a new tab).
Culpepper said Boston's density and existing infrastructure demands make large scale data centers incompatible with the city's direction
Provenance: Paraphrased; said in the source itself.
Primary source: wbur.org (opens in a new tab).
Trahan supported the Ratepayer Protection Act in committee in July, and the measure now moves to the Senate
Provenance: Paraphrased; said in the source itself.
Primary source: Quiver Quantitative (opens in a new tab).
Lori Trahan voted for the bipartisan Ratepayer Protection Act, which sets standards for state utility regulators and requires large electricity users, including data centers, to cover the cost of grid upgrades and provide financial guarantees
Provenance: Paraphrased; content date; reported from elsewhere.
Primary source: Quiver Quantitative (opens in a new tab).
Trump posted on Truth Social this week that AI and data centers will be the Greatest Economic Development Engine in History
Provenance: Paraphrased; said in the source itself.
Primary source: Boston Globe (opens in a new tab).
Archived copy: Wayback Machine (opens in a new tab).
Matthew Madden noted that data centers require massive utility upgrades, interconnections and long lead times for electrical equipment
Provenance: Paraphrased; said in the source itself.
Primary source: Bowditch & Dewey (opens in a new tab).
Kate Saenko, Boston University computer science professor, said Healey's data center executive order is sensible and requires thoughtful process
Provenance: Paraphrased; said in the source itself.
Primary source: WGBH (opens in a new tab).
Salem Mayor Dominick Pangallo defended proposed ban on data center construction citing documented impacts and community affordability
Provenance: Paraphrased; said in the source itself.
Primary source: WGBH (opens in a new tab).
John Byers, Boston University AI Accelerator director, said ban on NDAs promotes transparency and cost mitigation for consumers
Provenance: Paraphrased; said in the source itself.
Primary source: WGBH (opens in a new tab).
Massachusetts Green High Performance Computing Center operates on carbon free power
Provenance: Paraphrased; said in the source itself.
Primary source: WBUR (opens in a new tab).
Republican Mike Minogue challenging Healey for governorship criticized her data center stance
Provenance: Paraphrased; said in the source itself.
Primary source: Briefs Finance (opens in a new tab).
Lowell data center residents sued Massachusetts Department of Environmental Protection for approving flawed air quality plan from Markley Group to install eight new generators and operate total of 27 diesel generators
Provenance: Paraphrased; said in the source itself.
Primary source: WBUR (opens in a new tab).
Chrissy Lynch Massachusetts AFL CIO president said data center construction supports tens of thousands of union jobs
Provenance: Paraphrased; said in the source itself.
Primary source: Realtor.com (opens in a new tab).
Also reported by: Briefs Finance (opens in a new tab) national outlet .
Said again: September 10, 2026 ( Briefs Finance (opens in a new tab) national outlet ).
Governor Maura Healey made an announcement regarding data centers in Massachusetts
Provenance: Paraphrased; said in the source itself.
Primary source: C-SPAN (opens in a new tab).
Gov. Healey announced an executive order requiring data center developers to enter into community benefits agreements with municipalities.
Provenance: Paraphrased; said in the source itself.
Primary source: CBS News (opens in a new tab).
Jake Fortes, a Markley Data Center opponent whose home backs up to the facility, said the executive order does not address his concerns about the existing facility.
Provenance: Paraphrased; said in the source itself.
Primary source: CBS News (opens in a new tab).
Healey stated data centers must bring their own energy supply or pay a fee into a ratepayer protection fund returning money to ratepayers.
Provenance: Paraphrased; said in the source itself.
Primary source: CBS News (opens in a new tab).
Republican gubernatorial candidate Mike Minogue stated he has little interest in investing in new data centers due to insufficient energy infrastructure.
Provenance: Paraphrased; said in the source itself.
Primary source: CBS News (opens in a new tab).
Governor Maura Healey announced an executive order on data centers in Massachusetts
Provenance: Paraphrased; said in the source itself.
Primary source: C-SPAN (opens in a new tab).
A judge found that Lowell residents may have been denied a meaningful opportunity to challenge the project during the state permitting process
Provenance: Paraphrased; said in the source itself.
Primary source: NBC Boston (opens in a new tab).
On the November 3, 2026 ballot in Massachusetts: Governor (3), U.S. Senate (4), U.S. House, District 1 (2), U.S. House, District 2 (1), U.S. House, District 3 (3), U.S. House, District 4 (2), U.S. House, District 5 (1), U.S. House, District 6 (2), U.S. House, District 7 (1), U.S. House, District 8 (3), U.S. House, District 9 (2); 2 of 24 candidates with a statement on data centers on the record. Every candidate.
5 sites are serving load, 3 of them in Suffolk County.
8 projects are on the record in Massachusetts: 3 reported, 5 running and 1 not yet verified. Each is listed under Projects with its status history and sources. Resources: the questions people ask about data centers
answered from the rows aboveRecords are in 4 counties: Suffolk County (4), Middlesex County (2), Hampden County (1) and Norfolk County (1). The county table lists every county with its count, zero included. Resources: the questions people ask about data centers
answered from the rows aboveNot disclosed. None of the 8 records on file for Massachusetts states a power figure. Resources: the questions people ask about data centers
answered from the rows aboveNot disclosed. None of the 8 records on file for Massachusetts states a water figure. Resources: the questions people ask about data centers
answered from the rows above6 developers are named on the record: Centersquare, DataBank, Digital Realty, Equinix, Markley Group and TierPoint. 2 records name no developer; each name above opens the record, where the developer's source is listed. Resources: the questions people ask about data centers
answered from the rows above6 county and city rows are on the record, 5 of them rated: Mansfield is rated closed: Mansfield voters passed near total ban on data centers in May 2026, September 8, 2026, source (opens in a new tab), Lowell is rated restrictive: Lowell City Council imposed a 360 day moratorium on data centers in March, March 1, 2026, source (opens in a new tab) and Holyoke is rated closed: Holyoke approved a ban on data centers earlier this year, September 8, 2026, source (opens in a new tab). The state's own row is rated case by case, with 41 dated acts listed under the scorecard. Resources: the questions people ask about data centers
answered from the rows above3 records are not yet running. Hampden County: Holyoke Paper Mill Data Center (reported); Middlesex County: Markley Group Lowell Data Center (reported); and Suffolk County: Boston Neighborhood Data Center (reported). A county name opens its page with the map and every record there. Resources: the questions people ask about data centers
answered from the rows aboveNo statute, commission order, tariff, tax rule, moratorium or bill on data centers at the state level is on the record for Massachusetts yet; the laws page is where one appears when a person publishes it. The state's own scorecard row carries 41 dated acts, the newest reported September 24, 2026. Resources: the questions people ask about data centers
answered from the rows abovesummed only where a record disclosed the figure
| Figure | Disclosed total | Disclosed | Without a figure | Basis |
|---|---|---|---|---|
| Power | 0 | 8 | ||
| Water, stated per day | 0 | 8 | ||
| Water, stated per year | 0 | 8 | ||
| Permanent jobs | 0 | 8 | ||
| Tax each year | 0 | 8 |
A blank cell means no record in Massachusetts disclosed the figure. Third party figures on the same metrics are listed apart below; a figure a project disclosed about itself is never mixed with them.
| Figure | Disclosed total | Disclosed | Without a figure | Basis |
|---|---|---|---|---|
| Power | 0 | 8 | ||
| Water, stated per day | 0 | 8 | ||
| Water, stated per year | 0 | 8 | ||
| Permanent jobs | 0 | 8 | ||
| Tax each year | 0 | 8 |
A blank total means no record disclosed the figure; the count without one says how many.
Summed only where a record disclosed the figure; a record with no figure adds nothing and is counted as not disclosed. Water is summed per day and per year separately, as the sources stated it, and never converted. A tax claim given as a range is summed at both ends.
The disclosed totals are in the table above.
No source on file states what any of the 8 tracked facilities in Massachusetts are for. 1 site not yet verified is named apart and is not in that number.
| Use | Records | Power | Water | Jobs | Tax each year |
|---|---|---|---|---|---|
| No stated use | 8 |
A blank cell means no record with that use disclosed the figure.
A record that lists several uses counts once under each. Each cell is the sum over the records with that use, disclosed rows only.
No source on file states how any of the 8 tracked facilities in Massachusetts are cooled. 1 site not yet verified is named apart and is not in that number.
Report a correction · Send a tip about Massachusetts
Data Center Record, "Data center records in Massachusetts", https://datacenterrecord.org/states/ma. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.
The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Prose stays under copyright.