● Running First recorded September 14, 2026 · 1 Building

Equinix BO2

Street address 47 Manning Rd, Billerica, MA 01821, Middlesex County verified address Exact, at the address [3] U.S. Census Bureau TIGERweb city centroid, public domain

Overview, regulatory gates and specifications

Equinix lists a data center at Billerica, Massachusetts among the sites it operates. [1] Filings on the record specify 1 planned or operational building. [2] Equinix lists Equinix BO2 at Billerica, Massachusetts on its own page of data center locations, read September 14, 2026. [2]

1. Land & Parcel
Parcel located
2. Local Zoning
Zoning approved
3. Tax & EDA Deal
Not yet on file
4. Utility Grid Queue
Energized
5. Air & Water Permits
EPA air permit on file
What happens next: Facility is operational; air permit compliance, water reporting and utility filings are monitored.
Electricity Demand
Not disclosed
No MW figure in public filings yet

U.S. EIA residential equivalence (~830 homes per MW) will compute automatically once a permit or filing states facility megawatts.

Utility interconnection queue filings monitored.

Cooling & Water
Not disclosed
Daily water volume not stated in public filings

U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.

No local property tax abatement amount disclosed in public filings.

Site & Buildings [2]
1 building
Disclosed building count

Assessor parcel acreage and building square footage are added when municipal or county filings are published.

Location: 47 Manning Rd, Billerica, MA 01821.

Taxes & Permanent Jobs
Not disclosed
Tax and job figures not yet on file

State and local tax abatement agreements and permanent job commitments are recorded when filed.

No local property tax abatement amount disclosed in public filings.

Key specifications on the record

Power capacity
Not disclosed
Water usage
Not disclosed
Land area
Not disclosed
Buildings
1 building operator page
[2] equinix.com
Backup generators
Not disclosed
Capital investment
Not disclosed
Commissioned
Operational since 2012 (14 years)
Who leads it
Equinix as stated by the source
[2] equinix.com
Official project website
equinix.com (opens in a new tab) verified October 28, 2026
equinix.com (opens in a new tab)
Archived promotional websites
equinix.com (offline) [Wayback snapshot] (opens in a new tab) preserved in Internet Archive
tracked domains
Not disclosed
Who would use it, Jobs once it runs, Tax each year

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: Equinix
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for Equinix BO2.

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW)
Site Footprint (Acres)
Data Hall Buildings 1 building 1 Site filing [2] equinix.com
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Power the campus would draw A utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Hearings and statements on the record

August 11, 2026 Lowell, MA Lowell Zoning Board and Superior Court Ruling Halting Markley Data Center Expansion Lowell Zoning Board of Appeals 3 clips

On August 11, 2026, a Massachusetts judge overturned the Lowell Zoning Board of Appeals approval and halted the expansion of the Markley Group data center, the largest data center in Massachusetts, after neighboring residents sued over constant low frequency noise and diesel generator fumes.

  1. CBS Boston Broadcast Report Broadcast Report transcribed from local broadcast report
    "sided with them. Today, WBZ's Louisa Moller spoke with one resident who's been fighting the data center for years. These aren't supposed to be here. For years, Jake Forts has been in an all out battle with his back door neighbor. He says for 5 to 10 minutes each week, the stack near his backyard spews thick smoke that fills up his home. And the whole house smelled of diesel fumes."
  2. Resident public comment Resident Public Comment transcribed from local broadcast report
    "Department of Environmental Protection approved a permit for the data center owned by the Markley Group to have up to 27 diesel generators. And earlier this year, a group of community members filed suit appealing that decision to a Superior Court judge. Yesterday, that judge issued an order that the massive data center in Lowell's Sacred Heart neighborhood cannot add an additional four backup diesel generators."
  3. CBS Boston Broadcast Report Broadcast Report transcribed from local broadcast report
    "But you think it's not making the noise that the neighbor is complaining of. Correct. You think he's exaggerating? I think they're exaggerating, yes. This is a more than 350,000 square foot facility, and it's been here about a decade. With 23 backup diesel generators already, I asked Jake, why do four generators and the judge's order matter so much? It's finally somebody recognizing that"

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

No dated entry is on the record yet.

Every event in order

  • Read on September 14, 2026 (the day the page was read; it gives no date of its own)

    Equinix lists Equinix BO2 at Billerica, Massachusetts on its own page of data center locations, read September 14, 2026.

    [2] equinix.com

Nearest data centers in Massachusetts

Verified data center records in Massachusetts within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
EdgeConneX Boston (BOS01 Billerica) Billerica, Middlesex County Less than 1 mi Running EdgeConneX 1 building
TierPoint Boston Andover Data Center Andover, Essex County 7 mi Running TierPoint 1 building
DataBank Boston data center Boston, Suffolk County 9 mi Running DataBank 1 building
Centersquare Boston (BOS1A Waltham) Waltham, Middlesex County 9 mi Running Centersquare 1 building
Equinix Boston Waltham (BO1) Waltham, Middlesex County 10 mi Running Equinix 1 building
Centersquare Boston (BOS4A Watertown) Watertown, Middlesex County 13 mi Running Centersquare 1 building

Blank cell: not disclosed by any source on file.

Common questions about Equinix BO2

Answered directly from the verified filings and local actions on this page.

Who is building Equinix BO2?

Equinix is the developer, equinix.com (opens in a new tab). No construction contractor is named on the record yet.

How much power and water does Equinix BO2 say it needs?

Power: not disclosed by any source on file. Water: not disclosed by any source on file.

Where does Equinix BO2 stand today?

It is running; the date it reached that stage is not sourced, only the day a page was read. No dated entry is on the record yet.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Tracked project domains

Promotional domains, campaign sites, and municipal portals preserved through the Internet Archive.

Primary documents

  1. Equinix: United States and Canada colocation data centers (opens in a new tab), Equinix, September 14, 2026
  2. Equinix: Equinix BO2 (opens in a new tab), Equinix, September 14, 2026
  3. US EPA ECHO and Massachusetts Department of Environmental Protection Permit & Parcel Record (47 Manning Rd, Billerica, MA 01821) (opens in a new tab), U.S. Environmental Protection Agency and Massachusetts Department of Environmental Protection, November 6, 2026

3 sources on file.

Regional grid context

This site is in the NPCC New England (NEWE) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Equinix BO2", https://datacenterrecord.org/projects/equinix-bo2-billerica-ma, last verified November 6, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Equinix BO2", https://datacenterrecord.org/projects/equinix-bo2-billerica-ma. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Running
Tier
built from one source
Tags
Built from one source
Coordinates
42.5365, -71.2485
How the location is known
Location from the site's street address.
Location source
U.S. Census Bureau TIGERweb city centroid, public domain
Coordinate source
US EPA ECHO FRS and municipal parcel records
Location last verified
November 6, 2026
Published
September 14, 2026
Last verified
November 6, 2026
Not disclosed
Location source number, EPA registry id, Uses, Tenancy, Cooling, How capacity was disclosed, How water was disclosed, How acreage was disclosed, Interconnection, Capacity, if disclosed, Rating of the county's rows

Researcher view · Equinix BO2 · 3 sources, 1 entry · basis and source tier on every row · verified November 6, 2026

Download CSV JSON