CloudHQ operates the Manassas Corporate Center (MCC1) data center campus at 10880 Airman Avenue in Manassas, Prince William County, Virginia, registered in the EPA Facility Registry Service (FRS ID 110070049664). It is running; the record holds no sourced date for when it reached that stage.
How much power it needs, how much water it would use and who would use it have not been disclosed.
Tap a pin for the data center, the parcel for its record
- This record: Running, ringed
- data center
- Smaller pins: 55 other published records in Virginia
Details
- this record's location, ringed
- parcel outline, from the county parcel record
- city limits, U.S. Census Bureau, on a town level record
- county boundary
The other pins are the published projects in the same state, each in its stage color. The imagery beneath is the USGS national orthoimagery, public domain, shown so the land around the site can be read.
How to read this page. Every fact links to the source it rests on; a number in brackets is its place in the source list. A figure no source gives reads Not disclosed, and nothing is estimated. Where sources give different figures, each is shown with who gave it, and another source's figure never stands in for the record's own. Entries are added and never overwritten; corrections are listed under What happened.
What is known
Each figure as its source gave it. The number in brackets is its place in the source list.
- Who leads it
- CloudHQ as stated by the source
- Undisclosed in public filings
- Land, Power it would draw, Water, Who would use it, Jobs once it runs, Tax each year
Every field, with who said it and when (Researcher view)
Impact figures
| Field | Value | Who says so | Source | Last verified |
|---|---|---|---|---|
| How much power it needs | ||||
| How much water it would use | ||||
| How loud it would be | ||||
| Jobs once it runs | ||||
| Tax it would pay each year |
The record's fields
| Field | Value | Who says so | Source | Last verified |
|---|---|---|---|---|
| Who is building it | CloudHQ | as stated by the source | October 24, 2026 | |
| Who is constructing it | ||||
| How much land | ||||
| Buildings | 1 building | air permit generator list | [1] echo.epa.gov (opens in a new tab) | October 24, 2026 |
| Where its power comes from | ||||
| Grid connection | ||||
| How it is cooled |
A blank value cell means not disclosed by any source on file; a blank basis cell means the source gave the figure without saying on what basis.
The developer's figure is what the company said; what a permit allows is the ceiling a permit sets; measured means observed. Water is in gallons a day or a year, whichever the source stated; a tax claim given as a range shows both ends, each linked to the source that gave it.
Still not public, and where it would show up
The record adds each the day a source gives it. Why these documents.
- Water use A state water right filing or a water supply agreement.
- Who would use it A lease announcement or a tenant named in a filing.
- Power the campus would draw A utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
- Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.
What was decided
Acts of Prince William County and Manassas about data centers, on the record with their source. A rule about the area is not a decision about this record.
| Date | Who | Decision | Source |
|---|---|---|---|
| Prince William County | Prince William County Board of Supervisors approved changes ending by right data center development and shrinking Data Center Opportunity Zone Overlay District from 9,698 acres to 3,641 acres | commercialobserver.com (opens in a new tab) | |
| Prince William County | Supervisors approved 90 day transition period for properties within overlay, rejecting motion to eliminate grace period entirely. | patch.com (opens in a new tab) | |
| Prince William County | Prince William County Board of Supervisors voted unanimously to reduce Data Center Opportunity Zone Overlay District from 9,700 acres to 3,650 acres, eliminating by right development outside the overlay and requiring special use permits. | patch.com (opens in a new tab) | |
| Prince William County | Property owners have 90 days to file certain data center related applications to remain in the reduced district | virginiabusiness.com (opens in a new tab) | |
| Prince William County | Data Center Opportunity Zone Overlay District expected to shrink from about 9,700 acres to roughly 3,641 acres | virginiabusiness.com (opens in a new tab) | |
| Prince William County | Prince William County Board of Supervisors voted unanimously to eliminate automatic approvals and data center opportunity overlay district, requiring special use permits and public hearings for all future data center projects | nbcwashington.com (opens in a new tab) |
20 earlier decisions on the county's rows
| Date | Who | Decision | Source |
|---|---|---|---|
| Prince William County | Planning Commission set to consider 120 day grace period and 500 foot setback buffer proposal, with November public hearing targeted | wtop.com (opens in a new tab) | |
| Prince William County | Future data center projects will require special use permit instead of by right development | wtop.com (opens in a new tab) | |
| Prince William County | Amendment established 90 day grace period for data centers with approved site plans or already built or under construction | wtop.com (opens in a new tab) | |
| Prince William County | Prince William Board of County Supervisors voted 8-0 to approve zoning text amendment ending by right data center development countywide | wtop.com (opens in a new tab) | |
| Prince William County | The Planning Commission is aiming for a November 2026 public hearing on setback proposal, with a board hearing targeted for January 2027 | rappnews.com (opens in a new tab) | |
| Prince William County | The amendment includes a 90 day grace period for qualifying projects already built or being built in the county, as well as those already with a site plan that has passed the quality control threshold | rappnews.com (opens in a new tab) | |
| Prince William County | The overlay district allows data centers to be built by right within its parameters; the countywide amendment will drastically shrink the size and scope of the overlay from its originally adopted form which dates back over a decade to May 2016 | rappnews.com (opens in a new tab) | |
| Prince William County | Planning commission recommended a 120 day grace period for developers; supervisors were also considering eliminating the grace period entirely. | patch.com (opens in a new tab) | |
| Prince William County | Prince William County Board of Supervisors is expected to vote on zoning changes to restrict by right data center development, shrinking the Data Center Opportunity Zone Overlay District. | patch.com (opens in a new tab) | |
| Prince William County | Prince William County Board of Supervisors voted unanimously Tuesday to shrink the Data Center Opportunity Zone Overlay District | virginiabusiness.com (opens in a new tab) | |
| Prince William County | Prince William Board of County Supervisors voted 8-0 on September 22, 2026 to end by right data center development countywide, requiring special use permits for future projects | rappnews.com (opens in a new tab) | |
| Prince William County | Several high profile projects in Prince William County were recently halted due to sustained community opposition | ground.news (opens in a new tab) | |
| Prince William County | Prince William County will vote to repeal zoning rules for one area of the county where data centers can be built without approval | nbcwashington.com (opens in a new tab) | |
| Prince William County | Supervisors voted 8-0 to reject a comprehensive plan amendment for Dulles South Innovation Center, a proposed campus covering about 1,940 acres with 43 million square feet of data center space | theminermag.com (opens in a new tab) | |
| Prince William County | A circuit judge invalidated rezonings for Prince William Digital Gateway in August 2025 and an appeals court upheld the result in March 2026 | theminermag.com (opens in a new tab) | |
| Prince William County | Planning Commission recommended a 500 foot separation from existing homes and schools for projects qualifying through the transition provision | theminermag.com (opens in a new tab) | |
| Prince William County | Planning Commission recommended extending the eligibility window from 90 to 120 days after adoption on September 9 | theminermag.com (opens in a new tab) | |
| Prince William County | Prince William County supervisors scheduled for September 22 to consider restrictions that would subject more data center projects to individual review | theminermag.com (opens in a new tab) | |
| Prince William County | Prince William dissolved the resident Data Center Ordinance Advisory Group and adopted a different measurement approach with advisory standards | virginiamercury.com (opens in a new tab) | |
| Prince William County | Prince William County's Data Center Ordinance Advisory Group raised noise standards by 6 decibels over consultant recommendations | virginiamercury.com (opens in a new tab) |
What happened
No dated entry is on the record yet.
-
Read on October 24, 2026 (the day the page was read; it gives no date of its own)
EPA ECHO Detailed Facility Report (FRS ID 110070049664) lists CloudHQ MCC1 at 10880 Airman Avenue in Manassas as operational.
The site
The pin is the site, as the EPA's facility record places it. Location from an EPA facility record.
- Where
- 10880 Airman Avenue, Manassas, VA 20109, Manassas, Prince William County, Virginia [1] echo.epa.gov (opens in a new tab)
- How exactly it is located
- Exact, the point of the EPA's facility record
- The parcel
- No parcel outline in the public record
- Nearest homes
- Not computed for a record placed at a place center
- Nearest records
- EvoSwitch WDC1 Manassas, 2.7 mi
- QTS Manassas 1, 3.0 mi
- Iron Mountain Manassas Campus (VA-1), 4.9 mi
- Equinix DC14, 6.0 mi
- Data Center Vint Hill LLC, 9.7 mi
Keep going
Questions about this project
5 questions answered from the record
How big is CloudHQ Manassas Campus (MCC1)?
-
The record has one measure of its size: 1 building (air permit generator list, echo.epa.gov (opens in a new tab)). Its power capacity is not disclosed.
Who is building CloudHQ Manassas Campus (MCC1)?
-
CloudHQ is the developer. No construction contractor is named on the record yet.
How much power and water does CloudHQ Manassas Campus (MCC1) say it needs?
-
Power: not disclosed by any source on file. Water: not disclosed by any source on file.
Where does CloudHQ Manassas Campus (MCC1) stand today?
-
It is running; the date it reached that stage is not sourced, only the day a page was read. No dated entry is on the record yet.
What has Manassas or Prince William County decided about it?
-
Prince William County (rated restrictive): Prince William County Board of Supervisors approved changes ending by right data center development and shrinking Data Center Opportunity Zone Overlay District from 9,698 acres to 3,641 acres (reported September 23, 2026, commercialobserver.com (opens in a new tab)); and Prince William County: Supervisors approved 90 day transition period for properties within overlay, rejecting motion to eliminate grace period entirely (reported September 23, 2026, patch.com (opens in a new tab)). 26 events are on the county's rows; a rule about the area is not a decision about this record.
Sources
Primary documents
- EPA ECHO detailed facility report: CloudHQ MCC1 Manassas (opens in a new tab), U.S. Environmental Protection Agency
1 source on file.
About this data
Last verified , first recorded . Every correction is logged on the corrections page. Report a correction · Send a tip about CloudHQ Manassas Campus (MCC1)
Cite this page
Data Center Record, "CloudHQ Manassas Campus (MCC1)", https://datacenterrecord.org/projects/cloudhq-llc-cloudhq-mcc1-manassas-va. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.
The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Prose stays under copyright.
For researchers
- Stage
- Running
- Tier
- reviewed in depth
- Tags
- Reviewed in depth
- Coordinates
- 38.716855, -77.499738
- How the location is known
- Location from an EPA facility record.
- Location source
- EPA ECHO Detailed Facility Report (FRS ID 110070049664) at 10880 Airman Avenue, Manassas, VA 20109.
- Coordinate source
- EPA ECHO FRS ID 110070049664
- Location last verified
- October 24, 2026
- Rating of the county's rows
- Restrictive
- Published
- October 21, 2026
- Last verified
- October 24, 2026
- Undisclosed in public filings
- Location source number, EPA registry id, Uses, Tenancy, Cooling, How capacity was disclosed, How water was disclosed, How acreage was disclosed, Interconnection, Capacity, if disclosed