● Proposed Campus Reported July 9, 2026 · 6 Buildings In court filed July 10, 2026

CyrusOne Sangamon County Data Center Campus (Waverly)

Street address 12000 Rohrer Rd, Waverly, IL 62692, Sangamon County assessor parcel Exact, on the parcel [1] illinoistimes.com

Overview, regulatory gates and specifications

Residents sued to stop a data center project in Sangamon County. [1] Filings on the record specify disclosed capacity of 600 MW (the developer's figure), 6 planned or operational buildings. [1] Residents near the proposed Sangamon County data center filed a lawsuit [3]

1. Land & Parcel
Parcel located
2. Local Zoning
Zoning approved
3. Tax & EDA Deal
Not yet on file
4. Utility Grid Queue
600 MW disclosed
5. Air & Water Permits
Not yet on file
What happens next: Next public milestones include utility queue filings, state environmental permits and local site plan review.
Electricity Demand [1]
600 MW
the developer's figure

Equivalent to ~498,000 U.S. homes (U.S. EIA 830 homes/MW baseline) · 29% of Hoover Dam nameplate capacity (2,080 MW).

Grid interconnection and utility service tracked on file.

Cooling & Water
Not disclosed
Daily water volume not stated in public filings

U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.

No local property tax abatement amount disclosed in public filings.

Site & Buildings [1]
6 buildings
zoning application

Assessor parcel acreage and building square footage are added when municipal or county filings are published.

Location: 12000 Rohrer Rd, Waverly, IL 62692.

Taxes & Permanent Jobs
Not disclosed
Tax and job figures not yet on file

State and local tax abatement agreements and permanent job commitments are recorded when filed.

No local property tax abatement amount disclosed in public filings.

Key specifications on the record

Power capacity
600 MW developer figure Equivalent to the continuous electricity demand of about 498,000 average U.S. homes based on U.S. Energy Information Administration residential consumption data. About 6 percent of New York City's summer peak demand in 2024.
[1] illinoistimes.com
Water usage
Not disclosed
Land area
Not disclosed
Buildings
6 buildings operator page
[1] illinoistimes.com
Backup generators
Not disclosed
Capital investment
Not disclosed
Who leads it
CyrusOne as stated by the source
Not disclosed
Who would use it, Jobs once it runs, Tax each year
The math behind the comparison
  1. CyrusOne Sangamon County Data Center Campus (Waverly), capacity: 600 MW.
  2. New York City (NYISO Zone J) summer peak demand, actual, 2024: 10,245 MW (2024).
  3. 600 ÷ 10,245 = 0.06 (MW over MW).

Sources:

A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

CyrusOne spokesperson

Public Record Speaker

DID Recorded statement at www.springfieldbusinessjournal.com (July 9, 2026) [5]
SAID CyrusOne stated its commitment to Sangamon County remains unchanged and it intends to be a long term partner that will create hundreds of jobs and expand the local tax base (July 9, 2026) [5]

Brian McFadden

County Administrator

DID Recorded statement at www.springfieldbusinessjournal.com (July 9, 2026) [5]
SAID Brian McFadden, County Administrator, stated the county followed proper procedures before the Board took its vote and the State's Attorney's Office will represent the County (July 9, 2026) [5]

Ryan McCrady

President and Chief Executive Officer · Springfield Sangamon Growth Alliance

DID Recorded statement at NPR Illinois interview (November 4, 2025)
SAID This data center is going to use a large amount of electricity. And they have no financial interest in driving up rates because they're the ones that will pay the most for a rate increase because of the amount of power that they use (November 4, 2025) nprillinois.org (opens in a new tab)

Nick Dodson

Chair · Sangamon Valley Sierra Club

DID Recorded statement at NPR Illinois interview (November 4, 2025)
SAID It seems extremely shortsighted to build [a data center] and then leave the rest of it up to the state and the community to figure out. This is going to pass on some serious costs, in my opinion, to Ameren ratepayers and to the REC ratepayers (November 4, 2025) nprillinois.org (opens in a new tab)

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: CyrusOne
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for CyrusOne Sangamon County Data Center Campus (Waverly).

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW) 600 MW the developer's figure [1] illinoistimes.com
Site Footprint (Acres)
Data Hall Buildings 6 buildings zoning application [1] illinoistimes.com
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

  1. (source date; the content gives no date of its own)

    Residents near the proposed Sangamon County data center filed a lawsuit

    [3] sj-r.com

  2. (source date; the content gives no date of its own)

    Sangamon County Board approved a resolution for the CyrusOne data center April 7

    [5] springfieldbusinessjournal.com

  3. · In court (source date; the content gives no date of its own)

    Waverly residents filed a lawsuit July 6 against Sangamon County and the Sangamon County Board seeking to overturn the county's approval of the CyrusOne data center

    [5] springfieldbusinessjournal.com

  4. · Status: stalled or cancelled (content date)

    Residents sued to stop a data center project in Sangamon County.

    [1] illinoistimes.com

Every event in order

3 corrections to this record

Every correction, with its reason
  1. · City

    Postal mailing address city is not a Census place in Sangamon County; filed at the county level per place-geoid-fixes-1016.

  2. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  3. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

Every correction on the record is on the corrections page.

Nearest data centers in Illinois

Verified data center records in Illinois within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
Decatur Brush College Road Data Center Proposal Decatur, Macon County 59 mi Proposed ADM / Brush College Industrial Developer 2 buildings

Blank cell: not disclosed by any source on file.

Comparisons

2 metrics with more than one figure

Every figure on the record for the same thing, each with who gave it, its date and its basis.

Permanent jobs

1 figure, 1 source
Show each source's words
  • 100 jobs, Illinois Times: The data center is expected to employ 100 permanent full time employees on campus

Tax each year

1 figure, 1 source
Show each source's words
  • 100,000,000 USD, Illinois Times: The proposed data center project would generate nearly $100 million in tax revenue

Common questions about CyrusOne Sangamon County Data Center Campus (Waverly)

Answered directly from the verified filings and local actions on this page.

Who is building CyrusOne Sangamon County Data Center Campus (Waverly)?

CyrusOne is the developer. No construction contractor is named on the record yet.

Who will use CyrusOne Sangamon County Data Center Campus (Waverly)?

Not disclosed. No source on file names a tenant, says whether the site is single or multi tenant, or states what it is for. The record keeps the use as not disclosed until one does; see Who it serves.

How much power and water does CyrusOne Sangamon County Data Center Campus (Waverly) say it needs?

Power: 600 MW (the developer's figure, illinoistimes.com (opens in a new tab)). Water: not disclosed by any source on file.

Where does CyrusOne Sangamon County Data Center Campus (Waverly) stand today?

It is approved, as reported July 9, 2026. The newest entry, reported July 10, 2026: Residents near the proposed Sangamon County data center filed a lawsuit [3].

What is still unknown about CyrusOne Sangamon County Data Center Campus (Waverly)?

Not disclosed by any source on file: how much water it would use, how loud it would be, jobs once it runs, tax it would pay each year, who is constructing it, how much land, where its power comes from, grid connection, how it is cooled. No missing primary document is listed for this record yet; What the record lacks is where one appears when a person names it.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Reporting

  1. Data center details - Illinois Times (opens in a new tab), Illinois Times, July 9, 2026, local outlet
  2. Residents sue to stop Sangamon County data center - Illinois Times (opens in a new tab), Illinois Times, July 9, 2026, local outlet
  3. Residents near proposed Sangamon County data center file lawsuit (opens in a new tab), www.sj-r.com, July 10, 2026, news outlet
  4. Sangamon County Board approves a controversial data center project - NPR Illinois (opens in a new tab), NPR Illinois, April 7, 2026, local outlet
  5. Residents sue to stop Sangamon County data center (opens in a new tab), www.springfieldbusinessjournal.com, July 9, 2026, news outlet

5 sources on file.

Regional grid context

This site is in the SERC Midwest (SRMW) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "CyrusOne Sangamon County Data Center Campus (Waverly)", https://datacenterrecord.org/projects/sangamon-county-data-center-il, last verified November 6, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "CyrusOne Sangamon County Data Center Campus (Waverly)", https://datacenterrecord.org/projects/sangamon-county-data-center-il. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Proposed
Tier
built from one source
Tags
In court, Built from one source
Coordinates
39.5912, -89.9215
How the location is known
Location from the county parcel record.
Location source
https://sangamonil.gov/
Coordinate source
Sangamon County Board Conditional Permitted Use Approval (April 7, 2026)
Location last verified
September 16, 2026
How capacity was disclosed
the developer's figure
Capacity, if disclosed
600 MW, the developer's figure
Published
September 4, 2026
Last verified
November 6, 2026
Not disclosed
Location source number, EPA registry id, Uses, Tenancy, Cooling, How water was disclosed, How acreage was disclosed, Interconnection, Rating of the county's rows

Researcher view · CyrusOne Sangamon County Data Center Campus (Waverly) · 5 sources, 4 entries · basis and source tier on every row · verified November 6, 2026

Download CSV JSON