Novva Data Centers lists a data center at Salt Lake City, Utah among the sites it operates. It is running, as reported October 24, 2022.

How much power it needs, how much water it would use and who would use it have not been disclosed.

Last verified · 4 sources, 2 primary · A skeleton record: built from one source, not yet reviewed in depth by a person. · How to read this page

How to read this page. Every fact links to the source it rests on; a number in brackets is its place in the source list. A figure no source gives reads Not disclosed, and nothing is estimated. Where sources give different figures, each is shown with who gave it, and another source's figure never stands in for the record's own. Entries are added and never overwritten; corrections are listed under What happened.

What is known

Each figure as its source gave it. The number in brackets is its place in the source list.

Land
37 acres
third party estimate [3]
Power it would draw
Not disclosed
Reported by others: 1 GW (Data Center Frontier). Their figure, not the record's.
Water
Not disclosed
Who leads it
Novva Data Centers
as stated by the source
Who would use it
Not disclosed
Jobs once it runs
Not disclosed
Tax each year
Not disclosed
Every field, with who said it and when (Researcher view)

Impact figures

FieldValueWho says soSourceLast verified
How much power it needs Not disclosed
How much water it would use Not disclosed
How loud it would be Not disclosed
Jobs once it runs Not disclosed
Tax it would pay each year Not disclosed

The record's fields

FieldValueWho says soSourceLast verified
Who is building it Novva Data Centers as stated by the source October 3, 2026
Who is constructing it Not disclosed
How much land 37 acres third party estimate [3] datacenterfrontier.com October 3, 2026
Where its power comes from Not disclosed
Grid connection Not disclosed
How it is cooled Not disclosed

How much power it needs, also reported: 1 GW, 2022 (Data Center Frontier: Novva long term goal to deploy up to 1 gigawatt capacity by 2027) .

The developer's figure is what the company said; what a permit allows is the ceiling a permit sets; measured means observed. Water is in gallons a day or a year, whichever the source stated; a tax claim given as a range shows both ends, each linked to the source that gave it.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water useA state water right filing or a water supply agreement.
  • Who would use itA lease announcement or a tenant named in a filing.
  • Power the campus would drawA utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Jobs and taxAn incentive agreement, a county's economic development filing or a fiscal note.

What was decided

Acts of Salt Lake County and Salt Lake City about data centers, on the record with their source. A rule about the area is not a decision about this record.

DateWhoDecisionSource
Salt Lake County County staff will look at every legal option available for data center regulations in unincorporated parts of the county. sltrib.com
Salt Lake County Salt Lake County hit pause on data centers and is developing new regulations. sltrib.com
Salt Lake County Salt Lake County Mayor and County Council voted against the tax breaks datacenterknowledge.com

What happened

  1. (the day the page was read; it gives no date of its own)

    Novva Data Centers lists Novva Salt Lake City data center at Salt Lake City, Utah on its own page of data center locations, read September 14, 2026. [2]

  2. (source date; the content gives no date of its own)

    Campus already leased to a leading global tech company in 2023 [4]

  3. (source date; the content gives no date of its own)

    Novva data centers use cooling system with ambient air, heat exchange coils and refrigerant, consuming about 84% less water than similar data centers in the area [4]

  4. (source date; the content gives no date of its own)

    Phases 2 and 3 are expected to be completed next year (2026) [4]

  5. (source date; the content gives no date of its own)

    Phase 3 construction started last year, covers 318,000 sq ft and adds 72 MW of capacity [4]

  6. (source date; the content gives no date of its own)

    Phase 2 construction started in late 2023, covers 318,000 sq ft and adds 72 MW of capacity [4]

  7. (source date; the content gives no date of its own)

    Phase 1 facility began operating in 2023, built by Layton Construction Co. [4]

  8. · Status: running (source date; the content gives no date of its own)

    Novva began construction on 100 megawatt data center in North Las Vegas, Nevada, expected to open late 2023, 275,000 square feet, $400 million, on 20 acre campus [3]

The full Novva Salt Lake City data center timeline, in order

1 correction to this record

Every correction, with its reason
  1. · the effective at of a status history row

    Dated from its source: the row's own text states it: "... read September 14, 2026." The old and new text.

Every correction on the record is on the corrections page.

The site

Where in Salt Lake City is not in the public record. The pin marks the center of Salt Lake City, not a building, and the outline is Salt Lake County.

  • This record: Running, ringed
  • data center
  • Dashed edge: the exact site is not in the public record
  • Smaller pins: 12 other published records in Utah
Details
  • this record's location, ringed
  • parcel outline, from the county parcel record
  • city limits, U.S. Census Bureau, on a town level record
  • county boundary

The other pins are the published projects in the same state, each in its stage color. The imagery beneath is the USGS national orthoimagery, public domain, shown so the land around the site can be read.

Where
Salt Lake City, Salt Lake County, Utah
How exactly it is located
Town level, the center of the city
The parcel
No parcel outline in the public record
Nearest homes
Not computed for a record placed at a place center
Nearest records
Nearest records are not computed for a record placed at the center of its town.

Comparisons

1 metric with more than one figure

Every figure on the record for the same thing, the record's own or the document's first, each with who gave it, its date and its basis.

Capacity at full buildout

1 figure, 1 source
Show each source's words
  • 1 GW, Data Center Frontier: Novva long term goal to deploy up to 1 gigawatt capacity by 2027

Questions about this project

7 questions answered from the record

Answered from the rows on this page.

How big is Novva Salt Lake City data center?

The record has one measure of its size: 37 acres (third party estimate, source). Its power capacity is not disclosed.

Who is building Novva Salt Lake City data center?

Novva Data Centers is the developer. No construction contractor is named on the record yet.

Who will use Novva Salt Lake City data center?

Not disclosed. No source on file names a tenant, says whether the site is single or multi tenant, or states what it is for. The record keeps the use as not disclosed until one does; see Who it serves.

How much power and water does Novva Salt Lake City data center say it needs?

Power: not disclosed by any source on file. Water: not disclosed by any source on file.

Where does Novva Salt Lake City data center stand today?

It is running, as reported October 24, 2022. The newest entry, reported March 13, 2025: Campus already leased to a leading global tech company in 2023 [4].

What has Salt Lake City or Salt Lake County decided about it?

Salt Lake County: County staff will look at every legal option available for data center regulations in unincorporated parts of the county. (reported September 18, 2026, source); and Salt Lake County: Salt Lake County hit pause on data centers and is developing new regulations. (reported September 18, 2026, source). 3 events are on the county's rows; a rule about the area is not a decision about this record.

What is still unknown about Novva Salt Lake City data center?

Not disclosed by any source on file: how much power it needs, how much water it would use, how loud it would be, jobs once it runs, tax it would pay each year, who is constructing it, where its power comes from, grid connection, how it is cooled. No missing primary document is listed for this record yet; What the record lacks is where one appears when a person names it.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Primary documents

  1. Novva Data Centers: Locations, Novva Data Centers, September 14, 2026
  2. Novva Data Centers lists Novva Salt Lake City data center at Salt Lake City, Utah, Novva Data Centers

Reporting

  1. As It Expands, Novva Data Centers Sees Design, Tech As Differentiators - Data Center Frontier, Data Center Frontier, October 24, 2022, trade press
  2. Novva Secures $2B to Complete Utah Data Center Campus Construction - enr.com, enr.com, March 13, 2025, local outlet

4 sources on file.

Cite this record

Data Center Record, "Novva Salt Lake City data center", https://datacenterrecord.org/projects/novva-salt-lake-city-data-center-ut, last verified October 3, 2026.

Last verified , first recorded . Every correction is logged on the corrections page and under What happened.

Cite this page

Data Center Record, "Novva Salt Lake City data center", https://datacenterrecord.org/projects/novva-salt-lake-city-data-center-ut. Data: Data Center Record, datacenterrecord.org, CC BY 4.0.

The structured rows are CC BY 4.0. Link to this page; that is what turns a reuse into a citation. Prose stays under copyright.

Report a change
For researchers
Slug
novva-salt-lake-city-data-center-ut
Status value
operational
Stage
Running
Tier
skeleton
Tags
skeleton
Place id
us/ut/salt-lake-county/salt-lake-city
Coordinates
40.7772238, -111.9305069
Location precision
city
Location source
U.S. Census Bureau TIGERweb city centroid, public domain
Coordinate source
tigerweb city centroid
Location source number
Not disclosed
Location last verified
September 14, 2026
EPA registry id
Not disclosed
Use type values
not_disclosed
Tenancy value
not_disclosed
Cooling type value
not_disclosed
Capacity basis
not_disclosed
Water basis
not_disclosed, gallons_per_day
Acreage basis
third_party_estimate
Interconnection value
not_disclosed
Capacity, if disclosed
Not disclosed
Rating of the county's rows
Not disclosed
Published
2026-09-14
Last verified
2026-10-03