Novva Data Centers operates its flagship 100 acre Utah campus at 6524 West Old Bingham Highway in West Jordan, Salt Lake County, where Phase 1 opened in 2023 and Phases 2 and 3 are under construction across three disclosed buildings following a $355 million CIM Group investment in June 2022 and $2 billion in construction financing in March 2025. [10] Filings on the record specify closed loop liquid cooling. [5] Novva Data Centers lists Novva Salt Lake City data center at Salt Lake City, Utah on its own page of data center locations, read September 14, 2026. [2]
U.S. EIA residential equivalence (~830 homes per MW) will compute automatically once a permit or filing states facility megawatts.
Utility interconnection queue filings monitored.
Cooling system: Closed loop liquid. Closed loop chillers recirculate fluid rather than evaporating continuous potable water.
No local property tax abatement amount disclosed in public filings.
3 planned or operational data hall buildings.
Location: 6524 West Old Bingham Highway, West Jordan, UT 84081.
State and local tax abatement agreements and permanent job commitments are recorded when filed.
No local property tax abatement amount disclosed in public filings.
Connected government officials, corporate entities, utilities and local rules on the public record.
Spanish Fork City Council member Kevin Oyler stated that the Novva data center campus five miles away in West Jordan is quiet.(October 21, 2026) sltrib.com (opens in a new tab)
Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.
Disclosed engineering ceilings, reported actuals and primary regulatory basis for Novva West Jordan Data Center Campus.
| Field / Parameter | Disclosed Ceiling | Reported Actual | Basis & Primary Source |
|---|---|---|---|
| Electrical Capacity (MW) | |||
| Site Footprint (Acres) | 100 acres | 100 acres | the developer's figure [5] novva.com |
| Data Hall Buildings | 3 buildings | 3 | ENR March 13, 2025 (Tier 2) [10] enr.com |
| Cooling & Water System | Closed loop liquid | Company / permit specification [5] novva.com | |
| Backup Diesel / Gas Generators | |||
| Tax Abatement & Annual Revenue |
Blank cell: not disclosed by any source on file.
The record adds each the day a source gives it. Why these documents.
West Jordan residents living adjacent to the 55 acre data center campus documented continuous low frequency cooling hum and backup diesel generator noise and petitioned city officials for stricter acoustic mitigation.
"For Teresa Sorensen, this hum has become part of her life at home. I hear it in every room in my house when the generators run. Sorensen's lived in this West Jordan neighborhood for more than three decades. Across the street is the Lumen Data Center's West Jordan campus on roughly 55 acres. It's literally three houses down. Sorensen says there's a low hum she hears regularly, but when generators turn on can't even hold a conversation out here, let alone sit out and enjoy your"
"our view. He says he's having sleepless nights because of the noise. It echoes off our houses. I woke up this morning hearing that, and I thought, "Oh, the generators are running." So, there are times that I have to make other noise so I can sleep. So have other neighbors like Steve R. 3:00 in the morning, they're running. It's kind of a wind tunnel or a tunnel straight through to my yard. Lumen Data Center says it's taken steps to cut down on the impact to neighbors."
"Now they run them random all the time. And as more data centers are proposed across Utah, Steve R. says he also wants neighbors to pay attention early on. We're not afraid of data centers, just not in the middle of our neighborhood. So, just make sure you're informed. Try to find out about these things before it happens. McKenzie Edmonds, ABC 4 News."
Using this data in a report? Support the record.
Chronological regulatory, corporate and permitting events on the record, newest first.
(source date; the content gives no date of its own)
Campus already leased to a leading global tech company in 2023
(source date; the content gives no date of its own)
Novva data centers use cooling system with ambient air, heat exchange coils and refrigerant, consuming about 84% less water than similar data centers in the area
(source date; the content gives no date of its own)
Phases 2 and 3 are expected to be completed next year (2026)
(source date; the content gives no date of its own)
Phase 3 construction started last year, covers 318,000 sq ft and adds 72 MW of capacity
(source date; the content gives no date of its own)
Phase 2 construction started in late 2023, covers 318,000 sq ft and adds 72 MW of capacity
· Status: running (source date; the content gives no date of its own)
Phase 1 facility began operating in 2023, built by Layton Construction Co.
Financing (content date)
CIM Group committed an additional $355 million investment in Novva Data Centers to fund campus expansion at its 100 acre West Jordan flagship site.
Read on September 14, 2026 (the day the page was read; it gives no date of its own)
Novva Data Centers lists Novva Salt Lake City data center at Salt Lake City, Utah on its own page of data center locations, read September 14, 2026.
Folded duplicate expansion lead for Novva West Jordan into the canonical campus record at 6800 W. 9800 South, West Jordan.
Folded duplicate news lead for Novva West Jordan into the canonical campus record at 6800 W. 9800 South, West Jordan.
Held unplaced under the record's rules (October 13, 2026): the entry's words are about Nevada, and this record is in Utah. Kept off the record, never deleted; it can be restored.
Dated from its source: the row's own text states it: "... read September 14, 2026."
Every correction on the record is on the corrections page.
Verified data center records in Utah within 60 miles by straight line distance.
| Facility & Location | Distance | Stage | Operator / Tenant | Disclosed Scale |
|---|---|---|---|---|
| eBay Topaz Data Center (SLC2) South Jordan, Salt Lake County | Less than 1 mi | Running | eBay Inc. | 1 building |
| Aligned Data Centers West Jordan (SLC-01, SLC-02, SLC-03) West Jordan, Salt Lake County | 4 mi | Running | Aligned Data Centers | 55 acres |
| Flexential Salt Lake City South Valley (SLC09) West Jordan, Salt Lake County | 5 mi | Running | Flexential | 1 building |
| Aligned SLC-04 West Valley City, Salt Lake County | 8 mi | Running | Aligned Data Centers | 1 building |
| DataBank Granite Point Campus (SLC2, SLC3, SLC4, SLC5, SLC6) Bluffdale, Salt Lake County | 10 mi | Running | DataBank | 66 MW |
| FIBERSTATE Salt Lake City (SLC1) Draper, Salt Lake County | 10 mi | Running | FIBERSTATE | 1 building |
Blank cell: not disclosed by any source on file.
Answered directly from the verified filings and local actions on this page.
Novva Data Centers is the developer, novva.com (opens in a new tab). No construction contractor is named on the record yet.
Not disclosed. No source on file names a tenant, says whether the site is single or multi tenant, or states what it is for. The record keeps the use as not disclosed until one does; see Who it serves.
Power: not disclosed by any source on file. Water: not disclosed by any source on file.
It is running, as reported March 13, 2025. The newest entry, reported March 13, 2025: Campus already leased to a leading global tech company in 2023 [10].
Not disclosed by any source on file: how much power it needs, how much water it would use, how loud it would be, jobs once it runs, tax it would pay each year, who is constructing it, where its power comes from, grid connection, cooling fluid. No missing primary document is listed for this record yet; What the record lacks is where one appears when a person names it.
Official operator or facility campus page verified in 50 state website discovery pass.
10 sources on file.
This site is in the Northwest Power Pool (NWPP) regional power market.
Every number on this page comes from a named source. Click any source to open the document in a new tab.
If a link has moved or a document has changed, let us know and we will update the record and log the change.
Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.
Data Center Record. Novva West Jordan Data Center Campus. Last verified October 23, 2026. https://datacenterrecord.org/projects/novva-salt-lake-city-data-center-ut. Accessed November 22, 2026.
Every row on this page is available to download with its source, its basis and the date it was last verified.
Download this page's records (CSV) JSON
Licensed CC BY-NC 4.0. Say where it came from and do not sell it or use it to train a commercial model without a license.
Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.
Data Center Record takes no money from data center developers, operators, utilities or trade groups. That rule does not change for licensing.
Data Center Record is an independent project and takes no money from data center developers, operators, utilities or trade groups. Reader support keeps the record free to read, with no ads and no paywall.
Last verified , first recorded . Every correction is logged on the corrections page and under What happened. Report a correction · Send a tip about Novva West Jordan Data Center Campus