Novva West Jordan Data Center Campus

Street address 6524 West Old Bingham Highway, West Jordan, UT 84081, Salt Lake County verified address Exact, at the address [4] echo.epa.gov

Overview, regulatory gates and specifications

Novva Data Centers operates its flagship 100 acre Utah campus at 6524 West Old Bingham Highway in West Jordan, Salt Lake County, where Phase 1 opened in 2023 and Phases 2 and 3 are under construction across three disclosed buildings following a $355 million CIM Group investment in June 2022 and $2 billion in construction financing in March 2025. [10] Filings on the record specify closed loop liquid cooling. [5] Novva Data Centers lists Novva Salt Lake City data center at Salt Lake City, Utah on its own page of data center locations, read September 14, 2026. [2]

1. Land & Parcel
100 acres on file
2. Local Zoning
Zoning approved
3. Tax & EDA Deal
Not yet on file
4. Utility Grid Queue
Energized
5. Air & Water Permits
Approval Order DAQE-AN162210
What happens next: Facility is operational; air permit compliance, water reporting and utility filings are monitored.
Electricity Demand
Not disclosed
No MW figure in public filings yet

U.S. EIA residential equivalence (~830 homes per MW) will compute automatically once a permit or filing states facility megawatts.

Utility interconnection queue filings monitored.

Cooling & Water [5]
Closed loop liquid
Daily water volume not stated in public filings

Cooling system: Closed loop liquid. Closed loop chillers recirculate fluid rather than evaporating continuous potable water.

No local property tax abatement amount disclosed in public filings.

Site & Buildings [5]
100 acres
the developer's figure

3 planned or operational data hall buildings.

Location: 6524 West Old Bingham Highway, West Jordan, UT 84081.

Taxes & Permanent Jobs
Not disclosed
Tax and job figures not yet on file

State and local tax abatement agreements and permanent job commitments are recorded when filed.

No local property tax abatement amount disclosed in public filings.

Key specifications on the record

Power capacity
Not disclosed Reported by others: 1 GW (Data Center Frontier (opens in a new tab)). Their figure, not the record's.
Water usage
Not disclosed
Land area
100 acres developer figure
[5] novva.com
Buildings
3 buildings operator page
[10] enr.com
Backup generators
Not disclosed
Capital investment
$355 million developer figure
[8] datacenterfrontier.com
Commissioned
Operational since 2022 (4 years)
Who leads it
Novva Data Centers as stated by the source
[5] novva.com
How it is cooled
Closed loop liquid as stated by the source
[5] novva.com
State permit status
Approval Order DAQE-AN162210002-25 (AI Site 16221) the state's permit register, as of March 18, 2025, last verified October 23, 2026
Official project website
novva.com (opens in a new tab) verified October 28, 2026
novva.com (opens in a new tab)
Archived promotional websites
novva.com (opens in a new tab) [Wayback snapshot] (opens in a new tab) preserved in Internet Archive
tracked domains
Not disclosed
Who would use it, Jobs once it runs, Tax each year

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Kevin Oyler

City Council Member · Spanish Fork City Council

DID On the public record regarding Novva West Jordan Data Center Campus (October 21, 2026)
SAID Spanish Fork City Council member Kevin Oyler stated that the Novva data center campus five miles away in West Jordan is quiet. (October 21, 2026) sltrib.com (opens in a new tab)

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: Novva Data Centers
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for Novva West Jordan Data Center Campus.

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW)
Site Footprint (Acres) 100 acres 100 acres the developer's figure [5] novva.com
Data Hall Buildings 3 buildings 3 ENR March 13, 2025 (Tier 2) [10] enr.com
Cooling & Water System Closed loop liquid Company / permit specification [5] novva.com
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Power the campus would draw A utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Hearings and statements on the record

September 29, 2026 West Jordan, UT West Jordan Data Center Neighborhood Noise and Zoning Hearing Report West Jordan City Council 3 clips

West Jordan residents living adjacent to the 55 acre data center campus documented continuous low frequency cooling hum and backup diesel generator noise and petitioned city officials for stricter acoustic mitigation.

  1. Resident public comment Resident Public Comment transcribed from local broadcast report
    "For Teresa Sorensen, this hum has become part of her life at home. I hear it in every room in my house when the generators run. Sorensen's lived in this West Jordan neighborhood for more than three decades. Across the street is the Lumen Data Center's West Jordan campus on roughly 55 acres. It's literally three houses down. Sorensen says there's a low hum she hears regularly, but when generators turn on can't even hold a conversation out here, let alone sit out and enjoy your"
  2. Steve R. Resident Public Comment transcribed from local broadcast report
    "our view. He says he's having sleepless nights because of the noise. It echoes off our houses. I woke up this morning hearing that, and I thought, "Oh, the generators are running." So, there are times that I have to make other noise so I can sleep. So have other neighbors like Steve R. 3:00 in the morning, they're running. It's kind of a wind tunnel or a tunnel straight through to my yard. Lumen Data Center says it's taken steps to cut down on the impact to neighbors."
  3. McKenzie Edmonds, ABC4 Utah Broadcast Report Broadcast Report transcribed from local broadcast report
    "Now they run them random all the time. And as more data centers are proposed across Utah, Steve R. says he also wants neighbors to pay attention early on. We're not afraid of data centers, just not in the middle of our neighborhood. So, just make sure you're informed. Try to find out about these things before it happens. McKenzie Edmonds, ABC 4 News."

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

  1. (source date; the content gives no date of its own)

    Campus already leased to a leading global tech company in 2023

    [10] enr.com

  2. (source date; the content gives no date of its own)

    Novva data centers use cooling system with ambient air, heat exchange coils and refrigerant, consuming about 84% less water than similar data centers in the area

    [10] enr.com

  3. (source date; the content gives no date of its own)

    Phases 2 and 3 are expected to be completed next year (2026)

    [10] enr.com

  4. (source date; the content gives no date of its own)

    Phase 3 construction started last year, covers 318,000 sq ft and adds 72 MW of capacity

    [10] enr.com

  5. (source date; the content gives no date of its own)

    Phase 2 construction started in late 2023, covers 318,000 sq ft and adds 72 MW of capacity

    [10] enr.com

  6. · Status: running (source date; the content gives no date of its own)

    Phase 1 facility began operating in 2023, built by Layton Construction Co.

    [10] enr.com

  7. Financing (content date)

    CIM Group committed an additional $355 million investment in Novva Data Centers to fund campus expansion at its 100 acre West Jordan flagship site.

    [6] utahbusiness.com

Every event in order

  • Read on September 14, 2026 (the day the page was read; it gives no date of its own)

    Novva Data Centers lists Novva Salt Lake City data center at Salt Lake City, Utah on its own page of data center locations, read September 14, 2026.

    [2] novva.com

4 corrections to this record

Every correction, with its reason
  1. · Record address

    Folded duplicate expansion lead for Novva West Jordan into the canonical campus record at 6800 W. 9800 South, West Jordan.

  2. · Record address

    Folded duplicate news lead for Novva West Jordan into the canonical campus record at 6800 W. 9800 South, West Jordan.

  3. · Publication status

    Held unplaced under the record's rules (October 13, 2026): the entry's words are about Nevada, and this record is in Utah. Kept off the record, never deleted; it can be restored.

  4. · Timeline date

    Dated from its source: the row's own text states it: "... read September 14, 2026."

Every correction on the record is on the corrections page.

Nearest data centers in Utah

Verified data center records in Utah within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
eBay Topaz Data Center (SLC2) South Jordan, Salt Lake County Less than 1 mi Running eBay Inc. 1 building
Aligned Data Centers West Jordan (SLC-01, SLC-02, SLC-03) West Jordan, Salt Lake County 4 mi Running Aligned Data Centers 55 acres
Flexential Salt Lake City South Valley (SLC09) West Jordan, Salt Lake County 5 mi Running Flexential 1 building
Aligned SLC-04 West Valley City, Salt Lake County 8 mi Running Aligned Data Centers 1 building
DataBank Granite Point Campus (SLC2, SLC3, SLC4, SLC5, SLC6) Bluffdale, Salt Lake County 10 mi Running DataBank 66 MW
FIBERSTATE Salt Lake City (SLC1) Draper, Salt Lake County 10 mi Running FIBERSTATE 1 building

Blank cell: not disclosed by any source on file.

Comparisons

1 metric with more than one figure

Every figure on the record for the same thing, each with who gave it, its date and its basis.

Capacity at full buildout

1 figure, 1 source
Show each source's words
  • 1 GW, Data Center Frontier: Novva long term goal to deploy up to 1 gigawatt capacity by 2027

Common questions about Novva West Jordan Data Center Campus

Answered directly from the verified filings and local actions on this page.

Who is building Novva West Jordan Data Center Campus?

Novva Data Centers is the developer, novva.com (opens in a new tab). No construction contractor is named on the record yet.

Who will use Novva West Jordan Data Center Campus?

Not disclosed. No source on file names a tenant, says whether the site is single or multi tenant, or states what it is for. The record keeps the use as not disclosed until one does; see Who it serves.

How much power and water does Novva West Jordan Data Center Campus say it needs?

Power: not disclosed by any source on file. Water: not disclosed by any source on file.

Where does Novva West Jordan Data Center Campus stand today?

It is running, as reported March 13, 2025. The newest entry, reported March 13, 2025: Campus already leased to a leading global tech company in 2023 [10].

What is still unknown about Novva West Jordan Data Center Campus?

Not disclosed by any source on file: how much power it needs, how much water it would use, how loud it would be, jobs once it runs, tax it would pay each year, who is constructing it, where its power comes from, grid connection, cooling fluid. No missing primary document is listed for this record yet; What the record lacks is where one appears when a person names it.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Tracked project domains

Promotional domains, campaign sites, and municipal portals preserved through the Internet Archive.

Primary documents

  1. Novva Data Centers: Locations (opens in a new tab), Novva Data Centers, September 14, 2026
  2. Novva Data Centers lists Novva Salt Lake City data center at Salt Lake City, Utah (opens in a new tab), Novva Data Centers
  3. US EPA ECHO Detailed Facility Report: Novva West Jordan Data Center (FRS 110071204891, Utah DAQ Approval Order) (opens in a new tab), U.S. Environmental Protection Agency
  4. EPA ECHO Detailed Facility Report: NOVVA SLC COMMON, LLC - WEST JORDAN DATA CENTER (FRS 110072081372, CAA UT0000004903500605) (opens in a new tab), U.S. Environmental Protection Agency / Utah Division of Air Quality, October 23, 2026
  5. Novva Data Centers: Flagship Utah Data Center Campus (West Jordan, UT) (opens in a new tab), Novva Data Centers, October 23, 2026
  6. Novva Data Centers Expansion Planned With New Investment From CIM Group (opens in a new tab), Utah Business, June 1, 2022
  7. Novva Data Centers Secures $2 Billion in Financing for the Ongoing Construction of its Flagship Utah Data Center Campus (opens in a new tab), PR Newswire, March 4, 2025

Reporting

  1. As It Expands, Novva Data Centers Sees Design, Tech As Differentiators - Data Center Frontier (opens in a new tab), Data Center Frontier, October 24, 2022, trade press
  2. Novva raises $2bn for Salt Lake City data center phases in Utah (opens in a new tab), Data Center Dynamics, March 4, 2025, trade press
  3. Novva Secures $2B to Complete Utah Data Center Campus Construction - enr.com (opens in a new tab), enr.com, March 13, 2025, news outlet

10 sources on file.

Regional grid context

This site is in the Northwest Power Pool (NWPP) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Novva West Jordan Data Center Campus", https://datacenterrecord.org/projects/novva-salt-lake-city-data-center-ut, last verified October 23, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Novva West Jordan Data Center Campus", https://datacenterrecord.org/projects/novva-salt-lake-city-data-center-ut. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Running
Tier
reviewed in depth
Tags
Reviewed in depth
Coordinates
40.57315, -112.05284
How the location is known
Location from the site's street address.
Location source
EPA ECHO Detailed Facility Report 110072081372 (NOVVA SLC COMMON, LLC - WEST JORDAN DATA CENTER, 6524 West Old Bingham Highway, West Jordan, UT 84081, CAA ID UT0000004903500605) and Novva Data Centers Utah facility page.
Coordinate source
EPA ECHO FRS 110072081372 street address at 6524 West Old Bingham Highway, West Jordan
Location source number
[4]
Location last verified
October 23, 2026
EPA registry id
110072081372
Cooling
Closed loop liquid
How acreage was disclosed
the developer's figure
Published
September 14, 2026
Last verified
October 23, 2026
Not disclosed
Uses, Tenancy, How capacity was disclosed, How water was disclosed, Interconnection, Capacity, if disclosed, Rating of the county's rows

Researcher view · Novva West Jordan Data Center Campus · 10 sources, 8 entries · basis and source tier on every row · verified October 23, 2026