Data centers in Utah

Utah has 23 data center sites, 30 buildings where disclosed on the record: 19 running, 1 being built and 3 proposed. Most are in Salt Lake County (13) and Utah County (6), and records are in 6 of 29 counties. The largest proposal is Stratos Project in Box Elder County, 7.5 GW (the developer's figure); it is waiting on permits, as reported September 2, 2026.

Utah decides case by case. From the state's own rule: Governor Spencer Cox signed an executive order establishing a framework for data center development, June 1, 2026.

State register coverage: Utah's air permit, parcel, utility, water, and operator registers name 23 facilities; 23 are on the record (30 buildings where disclosed), and 0 sit not yet verified.

How to read this page. Every count comes from the records on this page and links to where it is counted. Nothing is published until a person reads its source, and a figure no source gives reads Not disclosed; nothing is estimated. A rating changes only when a person sets it.

Projects and campuses on the record

Facility and countyStageOperatorPower (MW)Latest entry
QTS Eagle Mountain Eagle Mountain, Utah CountyBeing builtQTS Data Centers
Stratos Project Box Elder CountyProposed Waiting on permits In court (B.E.A.R. referendum appeal)O'Leary Digital7,500O'Leary Digital Utah DC Sub I, LLC refiled Change Application a55167 on Water Right 13-2 (underlying right held by Bar H Ranch, Inc.), proposing to divert 1,712 acre-feet per year (~558 million gallons/year) from Salt Wells Spring Stream in Hansel Valley for industrial cooling and on site power generation makeup. waterrights.utah.gov (opens in a new tab) primary source reported October 15, 2026
Project Beehive Price, Carbon CountyProposedValar AtomicsValar Atomics filed an initial application with the Bureau of Land Management to use about 9,000 acres of public land near Price for an industrial campus that could include a gas cooled nuclear reactor, a data center and manufacturing, the bureau's Utah office confirmed. ksl.com (opens in a new tab) local outlet reported September 30, 2026
Volition Industries Spanish Fork Spanish Fork, Utah CountyProposedVolition250The proposed Volition data center would be a billion dollar, self powered facility generating between 250 and 400 megawatts of its own power using natural gas fox13now.com (opens in a new tab) local outlet reported September 2, 2026
Aligned SLC-04 West Valley City, Salt Lake CountyRunningAligned Data Centers
DataBank Granite Point Campus (SLC2, SLC3, SLC4, SLC5, SLC6) Bluffdale, Salt Lake CountyRunningDataBank66
Aligned Data Centers West Jordan (SLC-01, SLC-02, SLC-03) West Jordan, Salt Lake CountyRunning Approval Order AI Site 15939 (Project N160660003)Aligned Data CentersThe Salt Lake County Health Department opened a noise investigation into the Aligned West Jordan campus at 3333 W. 9000 South after receiving four formal complaints from nearby residents since August 2026, with the investigation scheduled to conclude in November 2026. sltrib.com (opens in a new tab) local outlet October 21, 2026
Meta Eagle Mountain Data Center Eagle Mountain, Utah CountyRunningMetaMeta operates its Eagle Mountain Data Center campus at 1275 North Community Circle, which opened in 2021 and is expanding across five buildings. kutv.com (opens in a new tab) local outlet reported September 14, 2026
Ace Data Center Provo, Utah CountyRunningAce Data CenterAce Data Center operates its colocation data center at 1950 South 950 East in Provo under Utah Division of Air Quality permit 4904900259. echo.epa.gov (opens in a new tab) primary source January 15, 2026
DataBank Salt Lake City Downtown (SLC1) Salt Lake City, Salt Lake CountyRunningDataBankDataBank operates the SLC1 downtown colocation and interconnection facility at 220 S. 200 East in Salt Lake City. databank.com (opens in a new tab) primary source January 15, 2026
FIBERSTATE Salt Lake City (SLC1) Draper, Salt Lake CountyRunningFIBERSTATEFIBERSTATE operates its single building SLC1 colocation data center at 106 E. 13200 South in Draper. fiberstate.com (opens in a new tab) primary source January 15, 2026
Flexential Salt Lake City Cottonwood (SLC05) Salt Lake City, Salt Lake CountyRunningFlexentialFlexential operates the single building SLC05 Cottonwood data center in Salt Lake County. flexential.com (opens in a new tab) primary source January 15, 2026
Flexential Salt Lake City Fairpark (SLC07) Salt Lake City, Salt Lake CountyRunningFlexentialFlexential operates the single building SLC07 Fairpark data center in Salt Lake City. flexential.com (opens in a new tab) primary source January 15, 2026
Flexential Salt Lake City Lindon (SLC03) Lindon, Utah CountyRunningFlexentialFlexential operates the single building SLC03 data center at 333 S. 520 West in Lindon, Utah County. flexential.com (opens in a new tab) primary source January 15, 2026
Flexential Salt Lake City Millcreek (SLC10) Salt Lake City, Salt Lake CountyRunningFlexentialFlexential operates the single building SLC10 Millcreek data center in Salt Lake City. flexential.com (opens in a new tab) primary source January 15, 2026
Flexential Salt Lake City South Valley (SLC09) West Jordan, Salt Lake CountyRunningFlexentialFlexential operates the single building SLC09 South Valley data center in West Jordan. flexential.com (opens in a new tab) primary source January 15, 2026
STRATA Vernal Data Center Vernal, Uintah CountyRunningSTRATA NetworksSTRATA Networks operates its Vernal colocation data center at 67 N. Vernal Avenue in Uintah County. stratanetworks.com (opens in a new tab) primary source January 15, 2026
Tonaquint St. George Data Center St. George, Washington CountyRunningTonaquint Data CentersTonaquint operates its single building St. George colocation data center in Washington County. tonaquint.com (opens in a new tab) primary source January 15, 2026
Voonami Orem Data Center (SLC1) Orem, Utah CountyRunningVoonami Inc.Voonami operates its single building colocation data center at 510 East Technology Avenue in Orem. voonami.com (opens in a new tab) primary source January 15, 2026
XMission Salt Lake City Colocation Center Salt Lake City, Salt Lake CountyRunningXMissionXMission operates its downtown colocation facility at 67 E. 400 South in Salt Lake City. xmission.com (opens in a new tab) primary source January 15, 2026
Novva West Jordan Data Center Campus West Jordan, Salt Lake CountyRunning Approval Order DAQE-AN162210002-25 (AI Site 16221)Novva Data CentersCampus already leased to a leading global tech company in 2023 enr.com (opens in a new tab) news outlet reported March 13, 2025
eBay Topaz Data Center (SLC2) South Jordan, Salt Lake CountyRunningeBay Inc.eBay operates its enterprise Topaz data center facility in southern Salt Lake County under a Utah Division of Air Quality approval order. echo.epa.gov (opens in a new tab) query feed January 15, 2025
Intelligence Community Comprehensive National Cybersecurity Initiative Data Center Bluffdale, Salt Lake CountyRunning Utah DAQ Approval Order for backup diesel generator plantNational Security AgencyThe Intelligence Community Comprehensive National Cybersecurity Initiative Data Center at Camp Williams (EPA FRS 110043515700) entered operations in Bluffdale, Utah. echo.epa.gov (opens in a new tab) query feed May 1, 2014

A blank cell means not disclosed by any source on file. Power is the developer's figure or a permit's, each linked on the record. All 23 Utah projects.

Every Utah record 23 records · sort by any column · blank cell: not disclosed

RecordPlaceStageOperatorMWBasisLocatedTierVerified
Aligned SLC-04West Valley City, Salt LakeRunningAligned Data CentersEPA registry22026-10-23
DataBank Granite Point Campus (SLC2, SLC3, SLC4, SLC5, SLC6)Bluffdale, Salt LakeRunningDataBank66the developer's figureEPA registry12026-10-23
QTS Eagle MountainEagle Mountain, UtahBeing builtQTS Data CentersEPA registry22026-10-23
Aligned Data Centers West Jordan (SLC-01, SLC-02, SLC-03)West Jordan, Salt LakeRunningAligned Data Centerssite12026-10-23
Stratos ProjectBox ElderProposedO'Leary Digital7,500the developer's figurecentroid12026-10-23
Project BeehivePrice, CarbonProposedValar Atomicscentroid22026-10-23
Meta Eagle Mountain Data CenterEagle Mountain, UtahRunningMetaEPA registry12026-10-26
Volition Industries Spanish ForkSpanish Fork, UtahProposedVolition250the developer's figuresite12026-10-23
Ace Data CenterProvo, UtahRunningAce Data CenterEPA registry22026-10-23
DataBank Salt Lake City Downtown (SLC1)Salt Lake City, Salt LakeRunningDataBanksite22026-10-23
FIBERSTATE Salt Lake City (SLC1)Draper, Salt LakeRunningFIBERSTATEsite22026-10-23
Flexential Salt Lake City Cottonwood (SLC05)Salt Lake City, Salt LakeRunningFlexentialsite22026-10-23
Flexential Salt Lake City Fairpark (SLC07)Salt Lake City, Salt LakeRunningFlexentialsite22026-10-23
Flexential Salt Lake City Lindon (SLC03)Lindon, UtahRunningFlexentialsite22026-10-23
Flexential Salt Lake City Millcreek (SLC10)Salt Lake City, Salt LakeRunningFlexentialsite22026-10-23
Flexential Salt Lake City South Valley (SLC09)West Jordan, Salt LakeRunningFlexentialsite22026-10-23
STRATA Vernal Data CenterVernal, UintahRunningSTRATA Networkssite22026-10-23
Tonaquint St. George Data CenterSt. George, WashingtonRunningTonaquint Data Centerssite22026-10-23
Voonami Orem Data Center (SLC1)Orem, UtahRunningVoonami Inc.site22026-10-23
XMission Salt Lake City Colocation CenterSalt Lake City, Salt LakeRunningXMissionsite22026-10-23
Novva West Jordan Data Center CampusWest Jordan, Salt LakeRunningNovva Data CentersEPA registry12026-10-23
eBay Topaz Data Center (SLC2)South Jordan, Salt LakeRunningeBay Inc.EPA registry12026-10-23
Intelligence Community Comprehensive National Cybersecurity Initiative Data CenterBluffdale, Salt LakeRunningNational Security AgencyEPA registry12026-10-23

Tier 1: an official or company source. Tier 2: a news report resolving to the outlet's own page. Located: a site coordinate from a permit, a parcel or an address, or the county or town centroid. Verified: the last day a person read the source. A blank cell means not disclosed by any source on file.

Every Utah county (29)

6 of 29 counties have a record. A county without one is listed, not linked, until its first published record.

CountyCensus GEOIDProjectsRulesStatementsHow it treats data centers
Salt Lake County490351310
Utah County49049632
Box Elder County49003110restrictive
Carbon County49007100
Uintah County49047100
Washington County49053100
Cache County49005010
Davis County49011011
Iron County49021010restrictive
Juab County49023010case by case
Tooele County49045010

A blank rating cell means no person has set one for the county. A county without a record is listed, not linked.

18 counties with no records yet
  • Beaver County
  • Daggett County
  • Duchesne County
  • Emery County
  • Garfield County
  • Grand County
  • Kane County
  • Millard County
  • Morgan County
  • Piute County
  • Rich County
  • San Juan County
  • Sanpete County
  • Sevier County
  • Summit County
  • Wasatch County
  • Wayne County
  • Weber County

The rules in Utah 11 rows · rating rests only on a binding act in force

What the state and its counties and cities have decided. Each row is rated by what it has decided, open, case by case, restrictive or closed, never by whether that is good or bad.

BodyLevelRatingIn force untilLatest actActsVerified
Utahstatecase by caseGovernor Spencer Cox signed an executive order establishing a framework for data center development. kutv.com (opens in a new tab) local outlet Jun 1, 202626 acts on this row
Every act on the Utah row
  1. event

    Senate President Stuart Adams lost his seat in the Legislature

    kuer.org (opens in a new tab) local outlet

  2. event

    Gov. Spencer Cox issued an executive order calling for higher standards for data center approvals

    kuer.org (opens in a new tab) local outlet

  3. event

    Rally opposing data center held at Mona City Center on September 8, 2026.

    sltrib.com (opens in a new tab) local outlet

    Also reported by 1 source
  4. event

    A 2009 legislative change removed a reporting rule for certain state and local sales tax exemptions used by businesses, individuals, and nonprofits

    utahnewsdispatch.com (opens in a new tab) local outlet

  5. statement

    Rep. Neil Walter proposed requiring public entities considering tax increment financing to get approval from the governor's office, though that idea never made it to a committee debate

    utahnewsdispatch.com (opens in a new tab) local outlet

  6. event

    Rep. Colin Jack outlined pending legislation replacing Utah's expiring sales tax exemption for solar/wind business inputs with broader exemption across all energy sources, offset by smaller tax on generated energy

    techbuzznews.com (opens in a new tab) news outlet

  7. event

    Stuart Adams lost his legislative seat in Republican primary, a stunning upset for one of Utah's most powerful politicians

    route-fifty.com (opens in a new tab) national outlet

  8. event

    Natural resources panel voted to study impacts from data center development on water, wildlife and air quality ahead of 2027 legislative session

    route-fifty.com (opens in a new tab) national outlet

  9. event

    Gov. Cox signed an executive order to raise the bar for how Utah evaluates data center proposals

    utahnewsdispatch.com (opens in a new tab) local outlet

  10. event

    Rep. Paul Cutler confirmed he was drafting a bill that would set guidelines for data centers if they want to collect on any state incentives, with strict guidelines on water use in the Great Salt Lake Basin and Colorado River Basin.

    fox13now.com (opens in a new tab) local outlet

  11. event

    Governor Spencer Cox issued an executive order setting some guardrails around data center development in Utah.

    fox13now.com (opens in a new tab) local outlet

  12. event

    On Wednesday, the legislature's Economic Development & Workforce Services Interim Committee voted unanimously to open a bill file to define in Utah State Code exactly what a large scale data center is.

    fox13now.com (opens in a new tab) local outlet

  13. event

    Governor Spencer Cox signed an executive order establishing a framework for data center development

    kutv.com (opens in a new tab) local outlet

    Also reported by 1 source
  14. event

    Utah Senate President J. Stuart Adams sent a letter to Kevin O'Leary calling for a 75% reduction in the data center project size

    kutv.com (opens in a new tab) local outlet

  15. event

    Spencer Cox issued an executive order directing state agencies to prioritize health of the Great Salt Lake in data center decisions

    utahnewsdispatch.com (opens in a new tab) local outlet

  16. event

    Republican voters ousted several politicians supporting the project in June 2026 primaries, including the president of the state Senate

    ms.now (opens in a new tab) national outlet

  17. event

    Utah Senate President Stuart Adams lost his primary reelection bid in June, with many believing it was influenced by his role in approving the data center

    ksl.com (opens in a new tab) local outlet

  18. event

    Stuart Adams was ousted in June primary, widely reported to be due to fallout around the data center

    moneywise.com (opens in a new tab) national outlet

  19. event

    Senate President Stuart Adams, a Republican from Layton, served as a MIDA board member and chair and lost his primary election in June, with outrage over the Stratos data center project being a key factor

    utahnewsdispatch.com (opens in a new tab) local outlet

  20. event

    Gov. Cox signed an executive order in May 2026 to establish a higher bar for data center development in Utah

    route-fifty.com (opens in a new tab) trade press

  21. event

    Utah mandated data center water use reporting in a bill signed by Gov. Spencer Cox in March 2026

    route-fifty.com (opens in a new tab) trade press

  22. event

    Utah enacted HB0076, signed by Governor Spencer Cox in March 2026, the first state law to require transparency on data center water use: a new data center over 10,000 square feet that uses at least 75 acre feet of water a year must report its water sources, the purpose of the use, conservation efforts and water quality to the Division of Water Rights, and the state releases anonymized totals to the public.

    route-fifty.com (opens in a new tab) trade press

  23. event

    SB225 passed out of Senate committee with bipartisan support and is awaiting full Senate vote.

    ksl.com (opens in a new tab) local outlet

  24. event

    Coalition of environmental groups releases report criticizing Utah Inland Port Authority water use in Great Salt Lake Basin counties (Salt Lake, Utah, Tooele, Weber, Box Elder).

    ksl.com (opens in a new tab) local outlet

  25. event

    In the 2025 legislative session, state Senate Majority Leader Kirk Cullimore proposed a Beehive Development Agency that would have expanded the governor's authority over major developments, but the bill never reached a floor vote

    utahnewsdispatch.com (opens in a new tab) local outlet

  26. event

    Utah State Board of Education voted against offering the company a property tax incentive at the expense of the Jordan School District

    datacenterknowledge.com (opens in a new tab) trade press

Last verified September 22, 2026.

262026-09-22
Box Elder Countycountyrestrictive until December 7, 20262026-12-07Ordinance imposing a 180 day moratorium on new data centers and data center power plants on unincorporated land. upr.org (opens in a new tab) local outlet Jun 10, 202625 acts on this row
Every act on the Box Elder County row
  1. litigation

    Kevin O'Leary filed response to defamation lawsuit filed in July by Alliance for a Better Utah and Elevate Strategies.

    ksl.com (opens in a new tab) local outlet

  2. litigation

    Box Elder County citizens group filed lawsuit to pursue referendum on Stratos project

    utahnewsdispatch.com (opens in a new tab) local outlet

    Also reported by 1 source
  3. litigation

    Kevin O'Leary and Fox News filed motion to dismiss defamation lawsuit in U.S. District Court

    utahnewsdispatch.com (opens in a new tab) local outlet

    Also reported by 1 source
  4. event

    In the June primary election, voters removed two of the Box Elder County commissioners

    kuer.org (opens in a new tab) local outlet

  5. event

    Two Box Elder County commissioners who voted in favor of the Stratos project also lost their seats

    utahnewsdispatch.com (opens in a new tab) local outlet

  6. litigation

    O'Leary Digital filed a response asking the 1st District Court in Brigham City to dismiss the lawsuit over Box Elder County's rejection of the Stratos referendum, arguing that the county's two Stratos resolutions were administrative and cannot be put to voters.

    ksl.com (opens in a new tab) local outlet

  7. moratorium

    MIDA paused Stratos project out of respect for referendum process and litigation on July 27, 2026

    route-fifty.com (opens in a new tab) national outlet

  8. litigation

    A citizens' group in Box Elder County filed a lawsuit against MIDA and pursued a referendum to undo the county's approval

    utahnewsdispatch.com (opens in a new tab) local outlet

  9. hearing

    Box Elder County Commission gave unanimous support to the Stratos project without taking public comment

    utahnewsdispatch.com (opens in a new tab) local outlet

  10. litigation

    Defamation suit filed by Alliance for a Better Utah, Elevate Strategies, Joshua Kanter and Gabrielle Finlayson on July 15 alleging O'Leary defamed them by suggesting they had links to China.

    ksl.com (opens in a new tab) local outlet

  11. moratorium adopted

    Box Elder County commissioners unanimously passed an ordinance imposing a 180 day moratorium on new data centers and data center power plants on unincorporated land while the county studies zoning and development standards.

    upr.org (opens in a new tab) local outlet

    Also reported by 1 source
  12. referendum

    Box Elder Accountability Referendum filed to allow voters to overturn the county commission's approval of Stratos

    hcn.org (opens in a new tab) news outlet

  13. denial

    Box Elder County attorney Stephen Hadfield denies BEAR referendum applications, concluding approved resolutions were administrative actions not subject to referendum

    utahnewsdispatch.com (opens in a new tab) local outlet

  14. litigation

    Alliance for a Better Utah and five unnamed Box Elder County plaintiffs filed suit in 3rd District Court in Salt Lake City arguing that the approvals of the Stratos plans by the Military Installation Development Authority and Box Elder County commissioners violate the Utah Constitution, and asking that they be nullified. (alleged in the filing, not a finding)

    ksl.com (opens in a new tab) local outlet

  15. filing

    The commission received 2,500 submitted comments from the community

    realtor.com (opens in a new tab) national outlet

  16. approval

    Box Elder County Commission unanimously approved a resolution giving MIDA consent to create the Stratos project area on land owned by Department of Defense and Utah Trust Lands Administration

    realtor.com (opens in a new tab) national outlet

  17. event

    Box Elder County Commission voted unanimously on May 4, 2026 to approve the partnership with MIDA for Stratos after hundreds of residents protested

    hcn.org (opens in a new tab) news outlet

  18. hearing

    Thousands of Utahns submitted negative comments, and hundreds of Box Elder residents attended May 4 county commission meeting shouting down politicians.

    slate.com (opens in a new tab) national outlet

  19. approval

    Box Elder County commissioners unanimously approved two resolutions in support of a 40,000 acre data center campus

    utahnewsdispatch.com (opens in a new tab) local outlet

  20. event

    Box Elder County commissioners passed two resolutions on May 4 allowing the initiative to proceed

    ksl.com (opens in a new tab) local outlet

  21. approval

    Box Elder County commissioners voted unanimously to consent to the Stratos MIDA project area at a special meeting where about 1,100 people gathered and a referendum effort formed within days.

    utahnewsdispatch.com (opens in a new tab) local outlet

  22. approval

    Box Elder County Commission approved an interlocal agreement with MIDA in early May 2026

    utahnewsdispatch.com (opens in a new tab) local outlet

  23. approval

    Box Elder County commissioners approved the plan in May despite vocal opposition

    ksl.com (opens in a new tab) local outlet

  24. approval

    Military Installation Development Authority board approved guidelines and tax incentive plan on April 24

    ksl.com (opens in a new tab) local outlet

  25. hearing

    Box Elder County Commission held a public hearing in late April 2026 on the Stratos project

    hcn.org (opens in a new tab) news outlet

Last verified October 1, 2026.

252026-10-01
Clearfield Citycityrestrictive until March 10, 20272027-03-10Clearfield City Council approved a 180 day moratorium on data center development. ksl.com (opens in a new tab) local outlet Sep 11, 20262 acts on this row
Every act on the Clearfield City row
  1. moratorium adopted

    Clearfield City Council approved a 180 day moratorium on data center development

    ksl.com (opens in a new tab) local outlet

  2. moratorium

    Clearfield City Council voted unanimously in support of ordinance restricting data center development for up to 180 days

    standard.net (opens in a new tab) local outlet

Last verified September 11, 2026.

22026-09-11
Eagle Mountaincitycase by caseMeta and Google received tax incentives or breaks for data centers in Eagle Mountain. sltrib.com (opens in a new tab) local outlet Aug 22, 20263 acts on this row
Every act on the Eagle Mountain row
  1. event

    Eagle Mountain walked back its first tax hike but residents will still pay about double the old rate

    sltrib.com (opens in a new tab) local outlet

  2. event

    Meta and Google received tax incentives or breaks for data centers in Eagle Mountain

    sltrib.com (opens in a new tab) local outlet

  3. event

    Eagle Mountain raised property taxes 183%

    sltrib.com (opens in a new tab) local outlet

Last verified September 23, 2026.

32026-09-23
Iron Countycountyrestrictive until October 28, 20262026-10-28Iron County imposed a 180 day moratorium on other data center proposals in May 2026. ksl.com (opens in a new tab) local outlet May 1, 20267 acts on this row
Every act on the Iron County row
  1. event

    Iron County Planning Commission voted Thursday to advance new data center rules without changes

    stgeorgeutah.com (opens in a new tab) local outlet

  2. hearing

    Iron County revised data center ordinance faces public hearing with tribal leaders and residents seeking delay

    stgeorgeutah.com (opens in a new tab) local outlet

  3. moratorium

    Iron County moratorium on data centers ends in two months

    sltrib.com (opens in a new tab) local outlet

    Also reported by 1 source
  4. moratorium adopted

    Iron County approved a six month moratorium on new data centers

    hcn.org (opens in a new tab) news outlet

  5. approval

    Iron County planners approved a conditional use permit for a data center proposal west of Cedar City in June 2026.

    ksl.com (opens in a new tab) local outlet

  6. moratorium adopted

    Iron County imposed a 180 day moratorium on other data center proposals in May 2026.

    ksl.com (opens in a new tab) local outlet

  7. moratorium

    Iron County put a pause on new data centers earlier this year

    upr.org (opens in a new tab) local outlet

Last verified October 8, 2026.

72026-10-08
Juab Countycountycase by caseJuab County commissioners approved a conditional use permit for a data center project in April 2026. ksl.com (opens in a new tab) local outlet Sep 16, 20264 acts on this row
Every act on the Juab County row
  1. litigation

    Residents appealed a permit decision for a $10 billion data center campus.

    sltrib.com (opens in a new tab) local outlet

  2. litigation

    Community group Mona Cares filed an appeal on Tuesday seeking to overturn the conditional use permit, arguing lack of adequate public notice

    ksl.com (opens in a new tab) local outlet

  3. statement

    Mona residents gathered at Juab County Commission meeting to voice concerns about proposed data center west of their homes

    ksl.com (opens in a new tab) local outlet

  4. approval

    Juab County commissioners approved a conditional use permit for a data center project in April 2026

    ksl.com (opens in a new tab) local outlet

Last verified September 16, 2026.

42026-09-16
Logancitynot ratedLogan city drafted ordinances that would allow data centers up to 100,000 square feet to be built in some parts of the city. sltrib.com (opens in a new tab) local outlet Reported Oct 121 act on this row
Every act on the Logan row
  1. ordinance

    Logan city drafted ordinances that would allow data centers up to 100,000 square feet to be built in some parts of the city.

    sltrib.com (opens in a new tab) local outlet

Last verified October 12, 2026.

12026-10-12
Salt Lake Countycountynot ratedSalt Lake County Mayor and County Council voted against the tax breaks. datacenterknowledge.com (opens in a new tab) trade press Reported May 30, 20241 act on this row
Every act on the Salt Lake County row
  1. event

    Salt Lake County Mayor and County Council voted against the tax breaks

    datacenterknowledge.com (opens in a new tab) trade press

Last verified October 23, 2026.

12026-10-23
Spanish Forkcitycase by caseSpanish Fork City Council voted to approve changes to city code for a data center. ksl.com (opens in a new tab) local outlet Sep 24, 20266 acts on this row
Every act on the Spanish Fork row
  1. event

    Spanish Fork City Council members limited the city to only one data center unless city leaders vote to change that in the future.

    ksl.com (opens in a new tab) local outlet

  2. approval

    Spanish Fork City Council voted to approve changes to city code for a data center.

    ksl.com (opens in a new tab) local outlet

    Also reported by 1 source
  3. event

    Spanish Fork City Council delayed the Title 15 amendment vote a second time, for another two weeks.

    fox13now.com (opens in a new tab) local outlet

  4. ordinance

    City council tabled resolution to amend ordinance allowing data centers to generate their own power

    fox13now.com (opens in a new tab) local outlet

  5. hearing

    Spanish Fork city council held five hour public hearing on data center proposal with dozens of commenters

    fox13now.com (opens in a new tab) local outlet

  6. event

    After a six hour public hearing, Spanish Fork City Council tabled a vote on Title 15 amendments that would set rules for self powered data centers until September 1.

    heraldextra.com (opens in a new tab) local outlet

    Also reported by 1 source

Last verified September 24, 2026.

62026-09-24
Tooele Countycountynot ratedTooele County Planning Commission voted unanimously to table the data center ordinance draft (Chapter 34 / Land Use Ordinance 2026-100). ksl.com (opens in a new tab) local outlet Oct 88 acts on this row
Every act on the Tooele County row
  1. ordinance

    Tooele County Planning Commission voted unanimously to table the data center ordinance draft (Chapter 34 / Land Use Ordinance 2026-100)

    ksl.com (opens in a new tab) local outlet

  2. moratorium

    Tooele County Council agreed to pause ordinance 2024-11 governing land use and regulation for data centers at the request of citizens

    youtube.com (opens in a new tab) video

  3. event

    The group TooeleCARES delivered a letter signed by more than 1,100 Utahns calling on the Utah Inland Port Authority to decline to authorize bonds or public financing for the Interstate Technology Park Public Infrastructure District

    utahnewsdispatch.com (opens in a new tab) local outlet

  4. event

    A letter signed by more than 1000 Tooele residents was presented at the state capitol requesting the port authority stop a data center from being built near the Great Salt Lake.

    youtube.com (opens in a new tab) video

  5. hearing

    Tooele County planning commission held meeting on new zoning rules for data centers

    kutv.com (opens in a new tab) local outlet

  6. statement

    Residents protested a project area and ordinance during a public hearing in Tooele County that could allow for a data center to be built

    abc4.com (opens in a new tab) local outlet

  7. event

    Hundreds of residents gathered in person and online to oppose the proposed Tooele data center project

    youtube.com (opens in a new tab) video

  8. event

    One person was escorted out of a Tooele public meeting by law enforcement after the discussion got heated

    youtube.com (opens in a new tab) video

Last verified October 8, 2026.

82026-10-08
Utah Countycountynot ratedThe Utah County Commission voted to approve a land use ordinance for data centers without taking public comment on Oct. 20, 2026. universe.byu.edu (opens in a new tab) news outlet Oct 202 acts on this row
Every act on the Utah County row
  1. ordinance

    The Utah County Commission voted to approve a land use ordinance for data centers without taking public comment on Oct. 20, 2026.

    universe.byu.edu (opens in a new tab) news outlet

  2. proposal

    Utah County Planning Commission voted to recommend approval of Application #2026-09 proposing amendments to UCLUO Sections 8.132, 2.08, 10.04, 12.28, 12.40, and 12.72 establishing a Data Center Overlay (DCO) Zone in Mining and Grazing (M&G-1) and Industrial (I-2) zones, advancing to the Board of County Commissioners for final adoption.

    codev.utahcounty.gov (opens in a new tab) query feed

Last verified October 21, 2026.

22026-10-21

Reported: the source's date; the item names no day of its own. A month with no day: the source names the month and not the day. A rating rests only on a binding act in force; "not rated" means no person has set one. A blank cell means the record holds nothing for it.

Utah laws and the full scorecard

Bills and laws in Utah

1 signed into law, 3 bills tracked

3 bills tracked in the Utah legislature, 1 of them signed into law, grouped by where each stands. A row opens its own page; the Utah laws page has what each law requires.

No official summary on file for any of these 3 measures; each row links to the legislature's page for the text.

Signed into law 1

Failed or died 2

3 bills tracked, 1 signed · LegiScan, CC BY 4.0

NumberSessionStatusDateTitle
H.B. 76 2026 General Session Signed 2026-03-23 Data Center Water Transparency Amendments
H.B. 585 2026 General Session Died at adjournment 2026-03-06 Data Center Amendments
S.B. 318 2026 General Session Died at adjournment 2026-03-06 Data Center Non Disclosure Amendments

3 bills tracked in Utah; 2026 General Session, legislature adjourned; last checked October 26, 2026. The last check found no bill not already tracked; the 3 tracked bills stand. Search terms: data center, data centre, large load, hyperscale, computing facility, server farm, high load factor (indirect), energy intensive facility (indirect), large electric load (indirect), digital asset mining (indirect), cryptocurrency mining (indirect), qualified technology facility (indirect), colocation (indirect), moratorium (with another term), sales tax exemption (with another term). The search on LegiScan. (opens in a new tab)

Bill data from LegiScan (opens in a new tab), licensed CC BY 4.0 (opens in a new tab). The record chooses the bills, writes each stage in its own words and cites the legislature's own page for every bill.

How this state's members voted

H.R. 9340, Ratepayer Protection Act: U.S. House of Representatives, roll call 312, September 16, 2026. On Motion to Suspend the Rules and Pass, as Amended. Passed, 417 to 3. Utah's members: 4 yea, 0 nay. How each member voted

MemberPartyPosition
Kennedy (UT)RYea
MaloyRYea
Moore (UT)RYea
OwensRYea

A blank party cell means the clerk's roll gives none.

H.R. 9340, Ratepayer Protection Act: U.S. Senate, roll call 254, September 30, 2026. On Cloture on the Motion to Proceed H.R. 9340. Cloture on the Motion to Proceed Rejected, 57 to 43. Utah's members: 2 yea, 0 nay. How each member voted

MemberPartyPosition
Curtis (R-UT)RYea
Lee (R-UT)RYea

A blank party cell means the clerk's roll gives none.

Positions as the clerk records them. How bills and votes are recorded.

What happened

The full Utah timeline, year by year

What was said

anyone who uses a cellphone is, in effect, a data-center customer, and that the rules are intended to protect county residents rather than simply approve projects
Seth Cox, Commission board member, Utah County Planning Commission · October 21, 2026 · quoted · Hoodline (opens in a new tab) national outlet
Aligned Data Centers stated that it commissioned an acoustic study and installed a sound barrier at its West Jordan campus after residents reported humming noise from the facility.
Aligned Data Centers, Data Center Operator, Aligned Data Centers · October 21, 2026 · paraphrased · The Salt Lake Tribune (opens in a new tab) local outlet

Every Utah statement, by speaker (341)

308 more on this page, one per speaker and claim; 341 statements in all

Shayne Pierce, board chair of the Utah County Planning Commission, said the ordinance sets limits on data center development for unincorporated parts of Utah County that did not exist before.

board chair of Utah County Planning Commission The Salt Lake Tribune (opens in a new tab) local outlet
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: The Salt Lake Tribune (opens in a new tab).

One woman was booked into the Utah County Jail and two other attendees were cited following the disturbance at the Utah County Planning Commission meeting. The woman refused to leave, argued with deputies, and struck a deputy in the groin while being removed from a row of chairs as two others grabbed her, after which she and a deputy went to the ground; Provo Fire Department EMS evaluated her for reported jaw pain and found no immediate emergency injuries.

Context & source notes

Provenance: Paraphrased; content date; reported from elsewhere.

Primary source: Utah County Sheriff's Office (opens in a new tab).

Archived copy: Wayback Machine (opens in a new tab).

Tensions rose after the vote as residents yelled in opposition to the ordinance allowing data centers in Mining and Grazing and Industrial zones. A protester forced to the ground and arrested by deputies was not being vocal when taken into custody, and her treatment was unjust.

UT for the People — No Tech Billionaires, Community Advocacy Coalition KUTV 2 News (opens in a new tab) local outlet
Context & source notes

Provenance: Paraphrased; content date; reported from elsewhere.

Primary source: KUTV 2 News (opens in a new tab).

Hansel Valley residents and farmers voiced alarm over groundwater depletion from 1,712 acre-feet industrial pumping, unmitigated turbine noise from 15 natural gas generation blocks, and the county's refusal to put the zoning overlay to a public ballot pending 1st District Court review.

Box Elder Accountability Referendum (B.E.A.R.), Citizen opposition coalition The Salt Lake Tribune (opens in a new tab) local outlet project record
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: The Salt Lake Tribune (opens in a new tab).

7.5 GW of thermal generation and 11 data center clusters cannot operate without massive evaporative consumption in an arid Great Salt Lake sub basin, and shifting 1,712 acre-feet of agricultural rights to industrial cooling in Hansel Valley directly threatens down gradient spring flows into the lake.

Ben Abbott, Executive Director, Grow the Flow; Professor of Ecosystem Ecology, BYU, Grow the Flow / Brigham Young University The Salt Lake Tribune (opens in a new tab) local outlet project record
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: The Salt Lake Tribune (opens in a new tab).

Wonder Valley's private gas generation and water recycling deliver grid independence without competing with Wasatch Front residential water or power demands.

Kevin O'Leary, Investor, Stratos Project / O'Leary Ventures FOX 13 / KSL FOX 13 (opens in a new tab) local outlet project record
Context & source notes

Provenance: Paraphrased; said in the source itself.

Setting: FOX 13 / KSL.

Primary source: FOX 13 (opens in a new tab).

Closed loop cooling with 10% freshwater makeup from agricultural water right 13-2 preserves Hansel Valley aquifer levels while avoiding any direct Great Salt Lake tributary depletion.

Paul Palandjian, CEO, O'Leary Digital Utah Division of Water Rights Application Exhibit B / KSL KSL (opens in a new tab) local outlet project record
Context & source notes

Provenance: Paraphrased; said in the source itself.

Setting: Utah Division of Water Rights Application Exhibit B / KSL.

Primary source: KSL (opens in a new tab).

Peter Crosby said local control is being ignored because external pressure is forcing data center decisions against the will of local residents, citing Box Elder as an example

Democratic candidate for Utah's Second Congressional District FOX 13 News Utah (opens in a new tab) local outlet · [Archived Copy] (opens in a new tab)
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: FOX 13 News Utah (opens in a new tab).

Archived copy: Wayback Machine (opens in a new tab).

Blake Moore said data centers are part of the immediate future and legislation should ensure electricity costs do not go up for residents

Republican Congressman representing Utah's Second Congressional District FOX 13 News Utah (opens in a new tab) local outlet · [Archived Copy] (opens in a new tab)
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: FOX 13 News Utah (opens in a new tab).

Archived copy: Wayback Machine (opens in a new tab).

Utah State University launched an initiative called Data Center Development in Utah to broaden understanding about data centers

Jessica Schad, Professor, Utah State University School of Social Sciences ksl.com (opens in a new tab) local outlet
Context & source notes

Provenance: Paraphrased; content date; reported from elsewhere.

Primary source: ksl.com (opens in a new tab).

Utah State University survey of 900 residents shows 75.4 percent oppose or strongly oppose a data center proposal somewhere in the state

Jessica Schad, professor, Utah State University School of Social Sciences KSL (opens in a new tab) local outlet
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: KSL (opens in a new tab).

Paul Palandjian, CEO of O'Leary Digital, stated that public sentiment matters and the Box Elder County project includes elements to address public concerns.

CEO, O'Leary Digital KSL (opens in a new tab) local outlet project record
Context & source notes

Provenance: Paraphrased; content date; reported from elsewhere.

Primary source: KSL (opens in a new tab).

Senator John Curtis introduced legislation to establish a federal program to advise residents near potential data center developments of their economic impacts.

U.S. Senator from Utah WSMH (opens in a new tab) news outlet
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: WSMH (opens in a new tab).

Paul Palandjian stated that project personnel received threats of violence driven by misinformation.

CEO, O'Leary Digital KSL (opens in a new tab) local outlet project record
Context & source notes

Provenance: Paraphrased; content date; reported from elsewhere.

Primary source: KSL (opens in a new tab).

Kylie Kremer, senior advisor for Humans First, stated that small towns lack the monetary backing to fight data center development.

senior advisor, Humans First KSL (opens in a new tab) local outlet project record
Context & source notes

Provenance: Paraphrased; content date; reported from elsewhere.

Primary source: KSL (opens in a new tab).

Cathy Latham stated people across the country are tired of not being part of data center planning discussions.

director of Humans First in Texas KSL (opens in a new tab) local outlet project record
Context & source notes

Provenance: Paraphrased; content date; reported from elsewhere.

Primary source: KSL (opens in a new tab).

Humans First conducted the 29th stop of its nationwide Data Center Revolt tour in Brigham City on October 1, 2026, with the tour starting in Texas on September 12.

Humans First / Data Center Revolt tour KSL (opens in a new tab) local outlet project record
Context & source notes

Provenance: Paraphrased; content date; reported from elsewhere.

Primary source: KSL (opens in a new tab).

Paul Palandjian said 'The project is not on hold,' and that O'Leary Digital is in early design and engineering of the project's infrastructure, gas supply and power generation, with engineering, environmental and economic impact studies underway under guidelines set by the state of Utah and the Military Installation Development Authority.

chief executive officer and cofounder of O'Leary Digital KSL (opens in a new tab) local outlet project record
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: KSL (opens in a new tab).

Lexi Tuddenham said the project raises larger questions about federal land, and that nuclear waste storage, nuclear development and data centers on public land would have 'tremendous implications for how public lands are used.'

executive director of the Healthy Environment Alliance of Utah NPR (opens in a new tab) national outlet project record
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: NPR (opens in a new tab).

Valar Atomics said 'No construction begins before permits and approvals,' and that it is committed to public engagement on the project.

in a written statement to NPR NPR (opens in a new tab) national outlet project record
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: NPR (opens in a new tab).

Lexi Tuddenham said 'We have a right to know as citizens what is going on, not just with our state lands, but also with our federal lands.'

executive director of the Healthy Environment Alliance of Utah KSL (opens in a new tab) local outlet project record
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: KSL (opens in a new tab).

Chuck Schumer, Senate Minority Leader, said Republicans offered only a toothless messaging bill and that voluntary pledges do not work.

Deseret News (opens in a new tab) local outlet
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: Deseret News (opens in a new tab).

Neal Clark said 'It's concerning to see that the Trump administration, with the support of the state of Utah, is pushing this forward on significant acreage of public lands.'

wildlands director at the Southern Utah Wilderness Alliance NPR (opens in a new tab) national outlet project record
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: NPR (opens in a new tab).

Ingrid Bettridge said the public should benefit from data center development through community redevelopment funded by facility revenues.

God and Country podcast KSL.com (opens in a new tab) local outlet
Context & source notes

Provenance: Paraphrased; content date; reported from elsewhere.

Primary source: KSL.com (opens in a new tab).

Tyson Reese with Americans for Prosperity in Utah said data centers should not be subsidized by taxpayers.

engagement director with Americans for Prosperity in Utah KSL.com (opens in a new tab) local outlet
Context & source notes

Provenance: Paraphrased; content date; reported from elsewhere.

Primary source: KSL.com (opens in a new tab).

Uriah Kennedy warned of misinformation about data centers and defended their importance for national defense and artificial intelligence development.

God and Country podcast KSL.com (opens in a new tab) local outlet
Context & source notes

Provenance: Paraphrased; content date; reported from elsewhere.

Primary source: KSL.com (opens in a new tab).

Spanish Fork Mayor Mike Mendenhall said the council has listened to people's concerns, including the amount of water a data center requires.

ksl.com (opens in a new tab) local outlet project record
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: ksl.com (opens in a new tab).

Jeff Chavez, CEO of Volition, said the company's closed loop cooling system uses about the amount of water equivalent to one or two Utah households.

ksl.com (opens in a new tab) local outlet project record
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: ksl.com (opens in a new tab).

Aaron Starks, president and CEO of 47G, an aerospace and defense organization, said the four major areas of AI capability are chips, data centers, electricity and talent.

deseret.com (opens in a new tab) local outlet
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: deseret.com (opens in a new tab).

Zach Boyd said the U.S. does have a lead over China in AI, depending on how you measure the race, and the nation should be able to maintain it for some time

director of the Office of Artificial Intelligence for the State of Utah Deseret News (opens in a new tab) local outlet project record
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: Deseret News (opens in a new tab).

Tony Martines said nuclear power fits the long range plans of Carbon County, an energy producing community, adding 'We have the workforce. We have the space. We have all the infrastructure.'

Carbon County commissioner KSL (opens in a new tab) local outlet project record
Context & source notes

Provenance: Paraphrased; content date; reported from elsewhere.

Primary source: KSL (opens in a new tab).

Cory Gardner said 'America stands no chance against our adversaries without energy abundance,' and that Valar Atomics believes it should start in Utah.

head of commercial development at Valar Atomics KSL (opens in a new tab) local outlet project record
Context & source notes

Provenance: Paraphrased; content date; reported from elsewhere.

Primary source: KSL (opens in a new tab).

New buildings will use closed loop liquid cooling system with dry cooling requiring no water during normal operations

Meta KUTV (opens in a new tab) local outlet project record
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: KUTV (opens in a new tab).

Data centers are described as proliferating throughout the nation at high velocity and built in deserts, ghettos, wetlands without clear understanding of purpose, economic impacts or life expectancy.

Ivan Weber, letter writer The Salt Lake Tribune (opens in a new tab) local outlet
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: The Salt Lake Tribune (opens in a new tab).

Mark Shepherd, Clearfield Mayor, voted in April for measures to permit a controversial data center proposal in Box Elder County

KSL (opens in a new tab) local outlet project record
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: KSL (opens in a new tab).

Sam Lyman stated data center dividends could provide annual payments between $4,500 and $8,900 per household

head of research at Bitcoin Policy Institute Fox News (opens in a new tab) national outlet
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: Fox News (opens in a new tab).

Residents say no formal notice letters were sent to neighbors within 1,000 feet of the data center site, unlike standard zoning changes which require such notice.

Mona residents Deseret News (opens in a new tab) local outlet
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: Deseret News (opens in a new tab).

Bitcoin Policy Institute proposed data center dividends model returning part of property tax revenue to households

Fox News (opens in a new tab) national outlet
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: Fox News (opens in a new tab).

GIGAWATER technology aims to capture water vapor from natural gas combustion and convert it into usable water.

Ray Conley, CEO of Creekstone Energy KSL (opens in a new tab) local outlet
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: KSL (opens in a new tab).

Clearfield Mayor Mark Shepherd said data centers are not listed as approved or acceptable in any city zone, so city has no way to approve or deny a proposal

news.google.com Standard-Examiner (opens in a new tab) local outlet
Context & source notes

Provenance: Paraphrased; said in the source itself.

Setting: news.google.com.

Primary source: Standard-Examiner (opens in a new tab).

Non investor owned utilities raise prices when data centers enter their service areas

Shon Hiatt, University of Southern California associate professor KSL (opens in a new tab) local outlet project record
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: KSL (opens in a new tab).

Rep. Jill Koford stated the state should examine the data center tax exemption issue more closely, noting the scale and rapid growth of data center investment raise legitimate questions

Representative, Republican from Ogden Yahoo Utah News Dispatch (opens in a new tab) local outlet
Context & source notes

Provenance: Paraphrased; said in the source itself.

Setting: Yahoo.

Primary source: Utah News Dispatch (opens in a new tab).

Tooele residents are concerned about water supply impacts from a data center near the local aquifer

unnamed resident, Tooele County YouTube (opens in a new tab) video
· unnamed resident · YouTube · September 4, 2026 · Privacy enhanced player · loads on click
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: YouTube (opens in a new tab).

Utah Inland Port Authority will not move forward with data centers until Tooele County has proper permitting, regulatory, and zoning process in place

Ben Hart YouTube (opens in a new tab) video
· Ben Hart · YouTube · September 4, 2026 · Privacy enhanced player · loads on click
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: YouTube (opens in a new tab).

Utah Inland Port Authority stated they are not offering tax incentives for data centers and have no official plans for them in project areas

Ben Hart YouTube (opens in a new tab) video
· Ben Hart · YouTube · September 4, 2026 · Privacy enhanced player · loads on click
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: YouTube (opens in a new tab).

Tooele County is not ready for the data center, according to state officials.

unnamed news anchor, paraphrasing state officials YouTube (opens in a new tab) video
· unnamed news anchor · YouTube · September 3, 2026 · Privacy enhanced player · loads on click
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: YouTube (opens in a new tab).

Bryce Bird said EPA air quality standards would remain and projects must use best available control technology

director, Utah Division of Air Quality KSL News (opens in a new tab) local outlet
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: KSL News (opens in a new tab).

Bryce Bird, director of Utah Division of Air Quality, said Utah would not change public comment requirements

director, Utah Division of Air Quality KSL News (opens in a new tab) local outlet
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: KSL News (opens in a new tab).

Both colocation and hyperscale data centers bring short- to medium term, high paying, skilled labor construction jobs

Ford Copple, Sutherland Institute tech policy analyst KUTV (opens in a new tab) local outlet project record
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: KUTV (opens in a new tab).

The Sutherland Institute examined employment tied to data center development

Ford Copple, Sutherland Institute tech policy analyst KUTV (opens in a new tab) local outlet project record
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: KUTV (opens in a new tab).

Larger hyperscale facilities generally support more permanent workers, particularly when they operate advanced computing equipment or include their own power generation infrastructure

Ford Copple, Sutherland Institute tech policy analyst KUTV (opens in a new tab) local outlet project record
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: KUTV (opens in a new tab).

Tooele residents expressed concerns that tax dollars should not subsidize data center development that they believe harms the community.

ABC4 Utah (opens in a new tab) local outlet
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: ABC4 Utah (opens in a new tab).

Brenna Williams, co founder of Box Elder Accountability Referendum, says data center economic promises are 'all smoke and mirrors'

co-founder, Box Elder Accountability Referendum Deseret News (opens in a new tab) local outlet project record
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: Deseret News (opens in a new tab).

Also reported by: KSL (opens in a new tab) local outlet .

Said again: September 6, 2026 ( KSL (opens in a new tab) local outlet ).

President Donald Trump posted on Truth Social saying data centers will serve economic self interest and national security, telling supporters to 'let Data Reign' or risk being 'backwards and poor'

Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: The Nation (opens in a new tab).

Archived copy: Wayback Machine (opens in a new tab).

The article describes data center opposition as rooted in opposition to water rationing, spikes in electrical bills, and resource plunder affecting quality of life

Chris Lehmann, The Nation The Nation (opens in a new tab) national outlet project record
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: The Nation (opens in a new tab).

Ryan Cooper of The American Prospect characterizes the data center rollout as reflective of Silicon Valley arrogance by billionaires promoting AI as revolutionary and requiring trillions in spending

The Nation (opens in a new tab) national outlet project record
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: The Nation (opens in a new tab).

Maddy Oritt, University of Utah director of public finance research, says property tax rates will become volatile as equipment depreciates

director of public finance research, University of Utah Deseret News (opens in a new tab) local outlet project record
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: Deseret News (opens in a new tab).

Shon Hiatt, associate professor at USC, found investor owned utilities like Rocky Mountain Power experienced no effect on power prices from data center entry from 2020 to 2025

associate professor, University of Southern California Deseret News (opens in a new tab) local outlet project record
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: Deseret News (opens in a new tab).

Also reported by: KSL (opens in a new tab) local outlet .

Said again: September 6, 2026 ( KSL (opens in a new tab) local outlet ).

Volition would create high paying jobs and generate millions in local tax revenue

Scott McKane, FOX 13 News reporter YouTube (opens in a new tab) video project record
· Scott McKane · YouTube · September 2, 2026 · Privacy enhanced player · loads on click
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: YouTube (opens in a new tab).

Growing cross partisan grassroots opposition to the Stratos data center in Utah demanding agency, fairness, and accountability in development decisions

Stephanie Hanes, Christian Science Monitor staff writer csmonitor.com (opens in a new tab) national outlet project record
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: csmonitor.com (opens in a new tab).

People from both political parties are aligned on wanting more say about how policymakers make choices about land and how resources are used

Stephanie Hanes, Christian Science Monitor staff writer csmonitor.com (opens in a new tab) national outlet project record
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: csmonitor.com (opens in a new tab).

The thermal energy coming off the Stratos Project could be equivalent to 23 atomic bombs being deposited on this valley every day in the form of waste heat, potentially raising nighttime temperatures by as much as 12 degrees Fahrenheit

Robert Davies, associate professor of physics at Utah State University The Christian Science Monitor (opens in a new tab) national outlet project record
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: The Christian Science Monitor (opens in a new tab).

The project raises significant concerns regarding energy and water usage, potentially requiring billions of gallons annually in a state already facing drought conditions

Maddie Sullivan, Salt Lake City resident sltrib.com (opens in a new tab) local outlet project record
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: sltrib.com (opens in a new tab).

Volition claims its data center would use natural gas powered fuel cells producing substantially lower emissions and heat and requiring significantly less water than traditional data centers

Jeff Chavez, Volition CEO KSL News (opens in a new tab) local outlet project record
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: KSL News (opens in a new tab).

CEO Jeff Chavez previously sought to build a 30 to-40 megawatt fuel cell powered data center in nearby Provo before pivoting to Spanish Fork

Volition CEO Hoodline (opens in a new tab) national outlet project record
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: Hoodline (opens in a new tab).

Residents opposed the proposal, with Tom Thomas stating residents deserve more than unsubstantiated promises and citing data centers' documented track record of water contamination, air pollution, and noise pollution

Spanish Fork resident KSL News (opens in a new tab) local outlet project record
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: KSL News (opens in a new tab).

Rep. Jill Koford, R Ogden, stated that the scale and rapid growth of data center investment raise legitimate questions about whether the current framework and available data remain adequate

R-Ogden, Utah Representative Utah News Dispatch (opens in a new tab) local outlet
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: Utah News Dispatch (opens in a new tab).

Kristian Fors, analyst with Libertas Institute, stated 'You can't manage what you can't measure' and stressed the need for transparency and accountability in government policy

analyst, Libertas Institute Utah News Dispatch (opens in a new tab) local outlet
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: Utah News Dispatch (opens in a new tab).

Kasia Tarczynska, who authored the Good Jobs First report, said states created tax exemptions based on smaller scale data centers from 10 to 15 years ago but the industry has changed dramatically due to artificial intelligence deployment

Utah News Dispatch (opens in a new tab) local outlet
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: Utah News Dispatch (opens in a new tab).

Mona City government said they had not received any formal data center application or development requests and have not made a commitment of water, sewer, or electricity for this data center

Mona City leaders Deseret News (opens in a new tab) local outlet project record
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: Deseret News (opens in a new tab).

West Jordan Mayor Dirk Burton said data centers help 'keep the taxes low for our residents and provide the services that our residents desperately need'

Deseret News (opens in a new tab) local outlet
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: Deseret News (opens in a new tab).

Skull Valley Band of Goshute Indians opposes the proposal citing groundwater depletion and contamination risks

KSL.com (opens in a new tab) local outlet
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: KSL.com (opens in a new tab).

Skull Valley Band sent letter of opposition to Gov. Spencer Cox but did not receive response

Skull Valley Band of Goshute Indians KSL.com (opens in a new tab) local outlet
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: KSL.com (opens in a new tab).

Heatmap survey found data centers are 43 points underwater with Republicans, 65 points underwater with independents, and 75 points underwater with Democrats

Heatmap / Robinson Meyer The New Republic (opens in a new tab) national outlet
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: The New Republic (opens in a new tab).

Called the Volition proposal an opportunity for the city and said it warrants moving forward to see if a private business can deliver on what it proposes, with guard rails in place.

Mike Mendenhall, Mayor, Spanish Fork City Facebook post KSL (opens in a new tab) local outlet project record
Context & source notes

Provenance: Paraphrased; content date; reported from elsewhere.

Setting: Facebook post.

Primary source: KSL (opens in a new tab).

Tim Davis, head of Utah's Department of Environmental Quality, told lawmakers the state has 'major gaps' in regulating potential impacts of new data centers, particularly heat and noise

Director of Utah Department of Environmental Quality KSL News (opens in a new tab) local outlet project record
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: KSL News (opens in a new tab).

Davis stated that the Department of Environmental Quality has not yet begun air quality permitting work for the Box Elder County Stratos project and that once it does, it will take a year just to obtain data on existing air quality before developers can apply

commissioner, Utah Department of Environmental Quality Utah News Dispatch (opens in a new tab) local outlet project record
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: Utah News Dispatch (opens in a new tab).

Governor Spencer Cox said the process surrounding the Stratos project was not good and particularly criticized the MIDA process

Utah Governor Utah News Dispatch (opens in a new tab) local outlet project record

Position note: Follows earlier support for Utah data center expansion, shifting in August 2026 toward calling for reform of the Military Installation Development Authority after the Stratos project controversy.

Context & source notes

Provenance: Paraphrased; content date; reported from elsewhere.

Primary source: Utah News Dispatch (opens in a new tab).

Also reported by: FOX 13 News Utah (opens in a new tab) local outlet , KSL News (opens in a new tab) local outlet , Yahoo (opens in a new tab) national outlet , grist.org (opens in a new tab) national outlet .

Said again: August 21, 2026 ( KSL News (opens in a new tab) local outlet ), August 29, 2026 ( Yahoo (opens in a new tab) national outlet ).

Rep. Jon Hawkins, R Pleasant Grove, chair of the Economic Development and Workforce Services Interim Committee, stated that lawmakers have received probably hundreds of emails on data centers and that it is a big concern

Representative, R-Pleasant Grove, chair, Economic Development and Workforce Services Interim Committee Utah News Dispatch (opens in a new tab) local outlet project record
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: Utah News Dispatch (opens in a new tab).

Cox said the approval process was not good and called for major reform of the MIDA process

Spencer Cox, Governor of Utah NPR Utah | KUER (opens in a new tab) local outlet project record
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: NPR Utah | KUER (opens in a new tab).

Also reported by: The Salt Lake Tribune (opens in a new tab) local outlet , yahoo.com (opens in a new tab) national outlet .

Said again: August 28, 2026 ( yahoo.com (opens in a new tab) national outlet ).

Larry Jensen, speaking for the three Carbon County commissioners, told the Trust Lands Administration board that the Valar Atomics project is critical to rebuilding the county's industrial valuation and easing the property tax burden that shifted onto residents as local coal production collapsed, as the board's minutes record it.

Context & source notes

Provenance: Paraphrased; content date; reported from elsewhere.

Primary source: Utah Trust Lands Administration (opens in a new tab).

Archived copy: Wayback Machine (opens in a new tab).

Tim Davis, commissioner of Utah's Department of Environmental Quality, noted that no single state agency can fully approve a data center on its own and showed lawmakers a chart displaying many layers of approvals required

commissioner, Utah Department of Environmental Quality Utah News Dispatch (opens in a new tab) local outlet project record
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: Utah News Dispatch (opens in a new tab).

Jake Garfield told the Trust Lands Administration board that Valar Atomics has been a strong partner as a tenant at the San Rafael Energy Lab, and that small modular reactors offer a path for data centers to grow without adding air emissions or heavy water use, as the board's minutes record it.

deputy director of the Utah Office of Energy Development Utah Trust Lands Administration (opens in a new tab) primary source · [Archived Copy] (opens in a new tab) project record
Context & source notes

Provenance: Paraphrased; content date; reported from elsewhere.

Primary source: Utah Trust Lands Administration (opens in a new tab).

Archived copy: Wayback Machine (opens in a new tab).

Rep. Peck toured a South Jordan facility using air and fans for cooling instead of water

Representative KUTV (opens in a new tab) local outlet
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: KUTV (opens in a new tab).

Sen. McCay said he does not feel that property tax should be used as much to incentivize data centers

KUTV (opens in a new tab) local outlet
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: KUTV (opens in a new tab).

Volition CEO Jeff Chavez stated the company generates their own power using natural gas powered fuel cells that do not connect to the existing power grid

KSL.com (opens in a new tab) local outlet project record
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: KSL.com (opens in a new tab).

Also reported by: The Salt Lake Tribune (opens in a new tab) local outlet .

Said again: August 21, 2026 ( The Salt Lake Tribune (opens in a new tab) local outlet ), September 1, 2026 ( KSL News (opens in a new tab) local outlet ).

Volition CEO Jeff Chavez said the proposed facility would use two households' worth of water to fill when first starting operations, then only one household's worth annually

CEO, Volition KSL News (opens in a new tab) local outlet project record
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: KSL News (opens in a new tab).

Sen. McCay said Utah is ahead of most of the country in data center policy

KUTV (opens in a new tab) local outlet
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: KUTV (opens in a new tab).

Rep. Hawkins said lawmakers are discussing current state policy on data centers and how to define data centers moving forward

KUTV (opens in a new tab) local outlet
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: KUTV (opens in a new tab).

Rep. Jim Dunnigan raised concerns about air quality and airshed impacts from data centers

Representative KUTV (opens in a new tab) local outlet
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: KUTV (opens in a new tab).

Property owner John Bankhead stated he has received many offers for the warehouse site and considers Volition a better option than a distribution center that would increase truck traffic

KSL.com (opens in a new tab) local outlet project record
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: KSL.com (opens in a new tab).

Volition plans to create a community fund contributing at least $500,000 per year for addiction recovery, food security, housing support and other community needs

Jeff Chavez, Volition CEO KSL.com (opens in a new tab) local outlet project record
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: KSL.com (opens in a new tab).

Residents expressed concerns over noise pollution, water resource impacts, location over a fault line, and whether the facility would be a test site

Spanish Fork residents ABC4 Utah (opens in a new tab) local outlet project record
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: ABC4 Utah (opens in a new tab).

Jeff Chavez, Volition CEO, stated data center developers should reuse existing infrastructure instead of buying thousands of acres

· Jeff Chavez · YouTube · August 18, 2026 · Privacy enhanced player · loads on click
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: YouTube (opens in a new tab).

Workforce shortages, not funding or ideas, may be the real constraint on energy project delivery in Utah

Utah officials and investors at Beehive Energy Alliance TechBuzz News (opens in a new tab) news outlet
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: TechBuzz News (opens in a new tab).

Teresa Pierce, Spanish Fork resident, expressed concern that data centers should not be built in residential backyards regardless of need

· Teresa Pierce · YouTube · August 18, 2026 · Privacy enhanced player · loads on click
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: YouTube (opens in a new tab).

Residents expressed concerns that Volition has not provided sufficient data or evidence to support claims of minimal community impact

Mapleton resident identified as Crosby ABC4 Utah (opens in a new tab) local outlet project record
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: ABC4 Utah (opens in a new tab).

Facility would generate its own power with natural gas fuel cells, never connect to the grid, use closed loop cooling with a one time 500,000 gal fill and 250,000 gal per year, and request no tax breaks.

Jeff Chavez, CEO, Volition Industries Spanish Fork City Council public hearing Daily Herald (opens in a new tab) local outlet project record
Context & source notes

Provenance: Paraphrased; content date; reported from elsewhere.

Setting: Spanish Fork City Council public hearing.

Primary source: Daily Herald (opens in a new tab).

Jack Urquhart, Spanish Fork communications manager, explained the municipal code amendment is needed because the developer proposes generating its own power

· Jack Urquhart · YouTube · August 18, 2026 · Privacy enhanced player · loads on click
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: YouTube (opens in a new tab).

Volition officials stated their data center will not strain local resources due to being self powered, will be in an existing building, and will have reduced emissions and increased property tax revenue

ABC4 Utah (opens in a new tab) local outlet project record
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: ABC4 Utah (opens in a new tab).

Volition officials stated their data center will not strain local resources due to being self powered, will have no diesel generation, is dry cooled, and has noise limits

ABC4 Utah (opens in a new tab) local outlet project record
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: ABC4 Utah (opens in a new tab).

O'Leary said 'I have no interest in causing an environmental disaster on my legacy. That's never going to happen.'

developer Yahoo Finance (opens in a new tab) national outlet project record
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: Yahoo Finance (opens in a new tab).

Also reported by: Yahoo Finance (opens in a new tab) national outlet .

Said again: August 19, 2026 ( Yahoo Finance (opens in a new tab) national outlet ).

Tooele County residents voiced opposition to a potential data center, urging decision makers to do the right thing.

ABC4 Utah (opens in a new tab) local outlet
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: ABC4 Utah (opens in a new tab).

Dr. Brian Moench, Utah Physicians for a Healthy Environment, called for a one year moratorium on data centers throughout the state

KUTV (opens in a new tab) local outlet
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: KUTV (opens in a new tab).

Amy Lawson said residents want to preserve Tooele County's quiet, peace, and land for future generations

Tooele County resident KUTV (opens in a new tab) local outlet
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: KUTV (opens in a new tab).

Maddy Oritt, director of public finance research at Gardner Institute, said careful project specific analysis can help communities maximize benefits of data center investment while minimizing unintended tax shifts

Kem C. Gardner Policy Institute director of public finance research Utah News Dispatch (opens in a new tab) local outlet
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: Utah News Dispatch (opens in a new tab).

Brittany Lopez, Assistant County Manager, said the county is establishing land use to ensure responsible planning and smart growth if data centers are proposed

Tooele County Assistant County Manager KUTV (opens in a new tab) local outlet
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: KUTV (opens in a new tab).

New data center facilities would likely provide initial property tax relief through increased property valuation

Kem C. Gardner Policy Institute researchers KSL News (opens in a new tab) local outlet
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: KSL News (opens in a new tab).

State Rep. Jill Koford sponsored the bill to provide transparency and reporting mechanism for data centers

State Representative, Utah House Route Fifty (opens in a new tab) trade press
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: Route Fifty (opens in a new tab).

Research fellow Rebecca Kilberg was one of three Aspen Institute fellows who produced the report that led to the water transparency law

Route Fifty (opens in a new tab) trade press
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: Route Fifty (opens in a new tab).

Data centers present both opportunities and challenges for Utah's property tax system

Maddy Oritt, director of public finance research at Kem C. Gardner Policy Institute KSL News (opens in a new tab) local outlet
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: KSL News (opens in a new tab).

Three fellows at the Aspen Institute's Aspen Policy Academy undertook research into data center growth in Utah and the Great Salt Lake water level as part of the 2024 Science and Technology Policy Fellowship

Rebecca Kilberg, Aspen Institute fellow Route Fifty (opens in a new tab) trade press project record
Context & source notes

Provenance: Paraphrased; content date; reported from elsewhere.

Primary source: Route Fifty (opens in a new tab).

Personal property taxes from data centers could create a boomerang or yo yo effect of initial tax decreases followed by offsetting future increases

Kem C. Gardner Policy Institute researchers KSL News (opens in a new tab) local outlet
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: KSL News (opens in a new tab).

Volition's data centers produce zero draw on Spanish Fork's municipal power grid and use no local utility power

Jeff Chavez YouTube (opens in a new tab) video project record
· Jeff Chavez · YouTube · August 5, 2026 · Privacy enhanced player · loads on click
Context & source notes

Provenance: Paraphrased; content date; reported from elsewhere.

Primary source: YouTube (opens in a new tab).

The fuel cell technology generates electricity through an electrochemical reaction with no combustion, flame, or fumes

Jeff Chavez, Volition YouTube (opens in a new tab) video project record
· Jeff Chavez · YouTube · August 5, 2026 · Privacy enhanced player · loads on click
Context & source notes

Provenance: Paraphrased; content date; reported from elsewhere.

Primary source: YouTube (opens in a new tab).

Computer chips transform electricity into heat, creating a large thermal output that should be regulated as heavy industrial use

Allen Westmind YouTube (opens in a new tab) video project record
· Allen Westmind · YouTube · August 5, 2026 · Privacy enhanced player · loads on click
Context & source notes

Provenance: Paraphrased; content date; reported from elsewhere.

Primary source: YouTube (opens in a new tab).

Volition is not requesting any additional water rights from the city

Jeff Chavez YouTube (opens in a new tab) video project record
· Jeff Chavez · YouTube · August 5, 2026 · Privacy enhanced player · loads on click
Context & source notes

Provenance: Paraphrased; content date; reported from elsewhere.

Primary source: YouTube (opens in a new tab).

Volition will include enforceable covenants in the development agreement covering water caps, noise limits, no grid connection, and no diesel

Jeff Chavez YouTube (opens in a new tab) video project record
· Jeff Chavez · YouTube · August 5, 2026 · Privacy enhanced player · loads on click
Context & source notes

Provenance: Paraphrased; content date; reported from elsewhere.

Primary source: YouTube (opens in a new tab).

The proposed data center facility is a good reuse of the existing building and resolves water and heat concerns

Dan Davis YouTube (opens in a new tab) video project record
· Dan Davis · YouTube · August 5, 2026 · Privacy enhanced player · loads on click
Context & source notes

Provenance: Paraphrased; content date; reported from elsewhere.

Primary source: YouTube (opens in a new tab).

Volition commits to providing more than 500,000 dollars per year in direct community contributions and educational partnerships

Jeff Chavez YouTube (opens in a new tab) video project record
· Jeff Chavez · YouTube · August 5, 2026 · Privacy enhanced player · loads on click
Context & source notes

Provenance: Paraphrased; content date; reported from elsewhere.

Primary source: YouTube (opens in a new tab).

Transparency from the developer and rigorous questioning by the planning commission changed resident sentiment toward supporting the project

Rod Yelm YouTube (opens in a new tab) video project record
· Rod Yelm · YouTube · August 5, 2026 · Privacy enhanced player · loads on click
Context & source notes

Provenance: Paraphrased; content date; reported from elsewhere.

Primary source: YouTube (opens in a new tab).

Data centers pose environmental and fire concerns and benefit wealthy entities at the expense of local residents

Megan Banks YouTube (opens in a new tab) video project record
· Megan Banks · YouTube · August 5, 2026 · Privacy enhanced player · loads on click
Context & source notes

Provenance: Paraphrased; content date; reported from elsewhere.

Primary source: YouTube (opens in a new tab).

Converting the existing industrial building to a data center reduces traffic from 3,500 trucks per month to 100-200 employee car trips per day with zero heavy truck traffic

Jeff Chavez, Volition YouTube (opens in a new tab) video project record
· Jeff Chavez · YouTube · August 5, 2026 · Privacy enhanced player · loads on click
Context & source notes

Provenance: Paraphrased; content date; reported from elsewhere.

Primary source: YouTube (opens in a new tab).

Enforceable contractual guardrails and community benefit agreements are necessary to protect clean air and water for future data center projects

Carla Shade YouTube (opens in a new tab) video project record
· Carla Shade · YouTube · August 5, 2026 · Privacy enhanced player · loads on click
Context & source notes

Provenance: Paraphrased; content date; reported from elsewhere.

Primary source: YouTube (opens in a new tab).

Volition received a New Minor Source air quality permit approval from the Utah Department of Environmental Quality

Jeff Chavez YouTube (opens in a new tab) video project record
· Jeff Chavez · YouTube · August 5, 2026 · Privacy enhanced player · loads on click
Context & source notes

Provenance: Paraphrased; content date; reported from elsewhere.

Primary source: YouTube (opens in a new tab).

Volition Industries proposes a data center inside Spanish Fork City powered entirely on site without connection to the city electric grid

Dave Anderson YouTube (opens in a new tab) video project record
· Dave Anderson · YouTube · August 5, 2026 · Privacy enhanced player · loads on click
Context & source notes

Provenance: Paraphrased; content date; reported from elsewhere.

Primary source: YouTube (opens in a new tab).

The proposed 250 megawatt facility would produce more than double the peak power draw of the entire city of Spanish Fork

Paul Dayton YouTube (opens in a new tab) video project record
· Paul Dayton · YouTube · August 5, 2026 · Privacy enhanced player · loads on click
Context & source notes

Provenance: Paraphrased; content date; reported from elsewhere.

Primary source: YouTube (opens in a new tab).

Rep. Paul Cutler said artificial intelligence has changed data center size, impact and policy questions, and that lawmakers need to think about things differently.

state representative KMYU (opens in a new tab) local outlet
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: KMYU (opens in a new tab).

Sowby said the approval process for data centers depends largely on whether a project is proposed within city limits, outside incorporated areas, or involving state and federal agencies.

BYU civil engineering professor KMYU (opens in a new tab) local outlet
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: KMYU (opens in a new tab).

BYU civil engineering professor Robert Sowby stated there is no single person or agency responsible for approving a large scale data center.

KMYU (opens in a new tab) local outlet
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: KMYU (opens in a new tab).

It is much easier to prevent data centers from being built than to hold them accountable later.

unnamed resident YouTube (opens in a new tab) video
· unnamed resident · YouTube · July 28, 2026 · Privacy enhanced player · loads on click
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: YouTube (opens in a new tab).

There are deep concerns about water usage with data center projects.

unnamed resident YouTube (opens in a new tab) video
· unnamed resident · YouTube · July 28, 2026 · Privacy enhanced player · loads on click
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: YouTube (opens in a new tab).

Utah Inland Port Authority fully supports the Tooele County data center moratorium

Ben Hart YouTube (opens in a new tab) video
· Ben Hart · YouTube · July 28, 2026 · Privacy enhanced player · loads on click
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: YouTube (opens in a new tab).

Governor Cox committed to slowing down data center permits and requiring careful evaluation of environmental impacts

Spencer Cox, Utah Governor YouTube (opens in a new tab) video project record
· Spencer Cox · YouTube · July 26, 2026 · Privacy enhanced player · loads on click
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: YouTube (opens in a new tab).

The proposed ordinance is about creating rules before a company submits a proposal, not in relation to any specific data center or project

Tooele commissioners YouTube (opens in a new tab) video
· Tooele commissioners · YouTube · July 23, 2026 · Privacy enhanced player · loads on click
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: YouTube (opens in a new tab).

Fox News journalist Maria Bartiromo apologized on behalf of Fox News on June 26 for airing unsubstantiated claims about Chinese ties to data center opponents

ksl.com (opens in a new tab) local outlet project record
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: ksl.com (opens in a new tab).

Kevin O'Leary clarified in a June 25 social media post that he has no evidence that Alliance for a Better Utah or Elevate Strategies are funded by China or the Chinese Communist Party

entrepreneur and O'Leary Digital founder ksl.com (opens in a new tab) local outlet project record
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: ksl.com (opens in a new tab).

Utah Senator Todd Weiler apologized on social media on June 30, saying he was duped after posting earlier claims about Chinese funding of Alliance for a Better Utah

Utah State Senator ksl.com (opens in a new tab) local outlet project record
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: ksl.com (opens in a new tab).

Heat generated by the Stratos data center complex could create a local heat island that raises daytime temperatures by five degrees Fahrenheit and nighttime temperatures by twenty eight degrees Fahrenheit

Robert Davies, Utah State University Professor YouTube (opens in a new tab) video project record
· Robert Davies · YouTube · June 20, 2026 · Privacy enhanced player · loads on click
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: YouTube (opens in a new tab).

Utah Senate President Stuart Adams praised O'Leary's concessions, saying they address concerns and reduce effective project footprint by 75 percent, but opponent Brenna Williams expressed skepticism that Thursday's announcement represents meaningful change.

Stuart Adams and Brenna Williams ksl.com (opens in a new tab) local outlet project record
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: ksl.com (opens in a new tab).

O'Leary committed to heat capture technology and independent scientific and engineering reviews of environmental impacts, water use, infrastructure demands and long term sustainability

O'Leary Digital standard.net (opens in a new tab) local outlet project record
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: standard.net (opens in a new tab).

Adams demanded that any excess water from the Stratos project be treated and dedicated to the Great Salt Lake at the developer's expense

Utah Senate President utahnewsdispatch.com (opens in a new tab) local outlet project record
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: utahnewsdispatch.com (opens in a new tab).

Also reported by: standard.net (opens in a new tab) local outlet .

Said again: June 4, 2026 ( standard.net (opens in a new tab) local outlet ).

Most members of the public were unaware of MIDA until the Box Elder County data center project

Tina Cannon YouTube (opens in a new tab) video project record
· Tina Cannon · YouTube · May 28, 2026 · Privacy enhanced player · loads on click
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: YouTube (opens in a new tab).

Tim Davis, commissioner of the Utah Department of Environmental Quality, stated the project must comply with federal Clean Air Act and Clean Water Act requirements and will require air quality permits for natural gas powered generators and diesel fired backup generators

Utah Department of Environmental Quality Commissioner Cache Valley Daily (opens in a new tab) local outlet project record
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: Cache Valley Daily (opens in a new tab).

Kevin O'Leary claimed three Utah individuals opposing the data center project were working against American national security and received financial support from China

investor YouTube (opens in a new tab) video project record
· Kevin O'Leary · YouTube · May 19, 2026 · Privacy enhanced player · loads on click
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: YouTube (opens in a new tab).

Palandjian said data center would use less water than current users (ranchers and farmers) by tapping into existing water rights

CEO, O'Leary Digital KSL.com (opens in a new tab) local outlet project record
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: KSL.com (opens in a new tab).

Max Roth reported that project renderings portray snow capped mountain peaks not located near the site and omit energy and water infrastructure

FOX 13 News reporter YouTube (opens in a new tab) video project record
· Max Roth · YouTube · May 19, 2026 · Privacy enhanced player · loads on click
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: YouTube (opens in a new tab).

Kevin O'Leary stated that ninety percent of the protesters against the data center project were bused in from out of state

investor YouTube (opens in a new tab) video project record
· Kevin O'Leary · YouTube · May 19, 2026 · Privacy enhanced player · loads on click
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: YouTube (opens in a new tab).

Energy experts have calculated the Stratos project would raise Utah's emissions by as much as 64 percent, producing more carbon pollution than the state's entire transportation sector, The Salt Lake Tribune and Grist reported on May 18, 2026, in a story published through their partnership; the outlets did not name the experts.

Energy experts cited by The Salt Lake Tribune and Grist, not named by the outlets The Salt Lake Tribune and Grist (opens in a new tab) national outlet project record
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: The Salt Lake Tribune and Grist (opens in a new tab).

Also reported by: Cache Valley Daily (opens in a new tab) local outlet .

Kevin O'Leary stated that planning and execution of the Stratos Data Center project must be rushed due to intense global competition in AI technology

investor YouTube (opens in a new tab) video project record
· Kevin O'Leary · YouTube · May 14, 2026 · Privacy enhanced player · loads on click
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: YouTube (opens in a new tab).

Thermal output from the Utah data center could raise daytime temperatures by five degrees Fahrenheit and nighttime temperatures by up to twenty eight degrees Fahrenheit

Rob Davies, physics professor YouTube (opens in a new tab) video project record
· Rob Davies · YouTube · May 14, 2026 · Privacy enhanced player · loads on click
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: YouTube (opens in a new tab).

Analysis by physics professor Dr. Rob Davies indicates the Stratos data center could release heat equivalent to twenty three atomic bombs daily

· Rob Davies · YouTube · May 14, 2026 · Privacy enhanced player · loads on click
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: YouTube (opens in a new tab).

Kevin O'Leary claimed China built four hundred gigawatts of new power capacity over twenty four months, with much powering AI data centers

investor YouTube (opens in a new tab) video project record
· Kevin O'Leary · YouTube · May 14, 2026 · Privacy enhanced player · loads on click
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: YouTube (opens in a new tab).

Macrina Wilkins of Associated General Contractors of America said data center construction jobs might max at 10,000 but broader economic models include indirect and induced effects

director of market insights, Associated General Contractors of America KUTV (opens in a new tab) local outlet
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: KUTV (opens in a new tab).

Kevin O'Leary stated the United States is falling behind in AI data centers and must catch up due to national security concerns regarding China

· Kevin O'Leary · YouTube · May 8, 2026 · Privacy enhanced player · loads on click
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: YouTube (opens in a new tab).

The proposed methane fired power plant would double Utah's natural gas usage and increase the state's carbon emissions by 50 percent

Davy Musser YouTube (opens in a new tab) video project record
· Davy Musser · YouTube · May 8, 2026 · Privacy enhanced player · loads on click
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: YouTube (opens in a new tab).

Utah Military Installation Development Authority stated the Stratos Project aligns with long term national defense, energy resilience, and economic development goals

· Utah Military Installation Development Authority · YouTube · May 8, 2026 · Privacy enhanced player · loads on click
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: YouTube (opens in a new tab).

County officials claim the data center will use less water than current agricultural land usage, resulting in a net benefit for the Great Salt Lake

· County officials · YouTube · May 8, 2026 · Privacy enhanced player · loads on click
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: YouTube (opens in a new tab).

No Environmental Impact Statement or official research on exact water and power demands for the Stratos Project has been published

Davy Musser YouTube (opens in a new tab) video project record
· Davy Musser · YouTube · May 8, 2026 · Privacy enhanced player · loads on click
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: YouTube (opens in a new tab).

Palandjian said they will preserve hunting sanctuaries and have leaseback agreements with ranchers for continued grazing operations

CEO and co-founder of O'Leary Digital KSL.com (opens in a new tab) local outlet project record
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: KSL.com (opens in a new tab).

Palandjian said the data center will use a modern closed loop cooling system with water and glycol that will use significantly less water than agriculture on the same plots of land

CEO and co-founder of O'Leary Digital KSL.com (opens in a new tab) local outlet project record
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: KSL.com (opens in a new tab).

Palandjian said O'Leary Digital is working out plans to offer AI literacy courses for area schools and help with undergraduate and graduate programs

CEO and co-founder of O'Leary Digital KSL.com (opens in a new tab) local outlet project record
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: KSL.com (opens in a new tab).

Governor Cox stated that concerns about water and power use contain incorrect information and the state will not allow centers to take all power or increase utility rates.

Spencer Cox, Governor of Utah KUTV (opens in a new tab) local outlet project record
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: KUTV (opens in a new tab).

Governor Cox stated the project is built for this use, is right next to a natural gas pipeline so they can build their own energy, and is not next to somebody's house.

Spencer Cox, Governor of Utah KUTV (opens in a new tab) local outlet project record
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: KUTV (opens in a new tab).

Jesse Harrison, local IT expert, stated that many data center promises get broken repeatedly based on historical patterns

· Jesse Harrison · YouTube · March 11, 2026 · Privacy enhanced player · loads on click
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: YouTube (opens in a new tab).

Utah Rep. Doug Fiefia stated Utah should prioritize data centers using less water and require clear reporting

Utah Representative deseret.com (opens in a new tab) local outlet
Context & source notes

Provenance: Paraphrased; content date; reported from elsewhere.

Primary source: deseret.com (opens in a new tab).

Traditional data centers require massive grid power and two to four years of utility infrastructure upgrades

unnamed narrator YouTube (opens in a new tab) video project record
· unnamed narrator · YouTube · October 24, 2025 · Privacy enhanced player · loads on click
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: YouTube (opens in a new tab).

Volition facilities deploy in six to nine months using on site fuel cell electricity generation

unnamed narrator YouTube (opens in a new tab) video project record
· unnamed narrator · YouTube · October 24, 2025 · Privacy enhanced player · loads on click
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: YouTube (opens in a new tab).

On the November 3, 2026 ballot in Utah: U.S. House, District 1 (4), U.S. House, District 2 (5), U.S. House, District 3 (6), U.S. House, District 4 (4); 2 of 19 candidates with a statement on data centers on the record. Every candidate.

Already running in Utah

19 sites are serving load, 13 of them in Salt Lake County.

See the 19 running sites
  1. Ace Data Center Provo, Utah County Running
  2. Aligned Data Centers West Jordan (SLC-01, SLC-02, SLC-03) West Jordan, Salt Lake County Running · Operational since 2019 (7 years)
  3. Aligned SLC-04 West Valley City, Salt Lake County Running
  4. DataBank Granite Point Campus (SLC2, SLC3, SLC4, SLC5, SLC6) Bluffdale, Salt Lake County Running 66 MW
  5. DataBank Salt Lake City Downtown (SLC1) Salt Lake City, Salt Lake County Running
  6. eBay Topaz Data Center (SLC2) South Jordan, Salt Lake County Running
  7. FIBERSTATE Salt Lake City (SLC1) Draper, Salt Lake County Running
  8. Flexential Salt Lake City Cottonwood (SLC05) Salt Lake City, Salt Lake County Running
  9. Flexential Salt Lake City Fairpark (SLC07) Salt Lake City, Salt Lake County Running
  10. Flexential Salt Lake City Lindon (SLC03) Lindon, Utah County Running
  11. Flexential Salt Lake City Millcreek (SLC10) Salt Lake City, Salt Lake County Running
  12. Flexential Salt Lake City South Valley (SLC09) West Jordan, Salt Lake County Running
  13. Intelligence Community Comprehensive National Cybersecurity Initiative Data Center Bluffdale, Salt Lake County Running · Operational since 2014 (12 years)
  14. Meta Eagle Mountain Data Center Eagle Mountain, Utah County Running · Operational since 2021 (5 years)
  15. Novva West Jordan Data Center Campus West Jordan, Salt Lake County Running · Operational since 2022 (4 years)
  16. STRATA Vernal Data Center Vernal, Uintah County Running
  17. Tonaquint St. George Data Center St. George, Washington County Running
  18. Voonami Orem Data Center (SLC1) Orem, Utah County Running
  19. XMission Salt Lake City Colocation Center Salt Lake City, Salt Lake County Running

Questions about Utah data centers

How many data center projects are on the record in Utah?

23 projects are on the record in Utah: 2 proposed, 1 waiting on permits, 1 being built and 19 running. Each is listed under Projects with its status history and sources. Resources: the questions people ask about data centers

answered from the rows above

Where in Utah are they?

Records are in 6 counties: Salt Lake County (13), Utah County (6), Box Elder County (1), Carbon County (1), Uintah County (1) and Washington County (1). The county table lists every county with its count, zero included. Resources: the questions people ask about data centers

answered from the rows above

How much power is disclosed for data centers in Utah?

7.82 GW is disclosed across 3 of 23 records: Stratos Project (7.5 GW, the developer's figure, source (opens in a new tab)), Volition Industries Spanish Fork (250 MW, the developer's figure, source (opens in a new tab)) and DataBank Granite Point Campus (SLC2, SLC3, SLC4, SLC5, SLC6) (66 MW, the developer's figure, source (opens in a new tab)). The other 20 records have not disclosed capacity. Resources: the questions people ask about data centers

answered from the rows above

How much water do data centers in Utah say they will use?

2 of 23 records state a water figure: Stratos Project, 1,528,767 gallons a day, the developer's figure, source (opens in a new tab) and Volition Industries Spanish Fork, 250,000 gallons a year, the developer's figure, source (opens in a new tab). The other 21 records have not disclosed it. Resources: the questions people ask about data centers

answered from the rows above

Who is building data centers in Utah?

17 developers are named on the record: Flexential (5 records), Aligned Data Centers (2 records), DataBank (2 records), Ace Data Center, eBay Inc., FIBERSTATE, Meta, National Security Agency, Novva Data Centers, O'Leary Digital, QTS Data Centers, STRATA Networks, Tonaquint Data Centers, Valar Atomics, Volition, Voonami Inc. and XMission. Each name opens the record, where the developer's source is listed. Resources: the questions people ask about data centers

answered from the rows above

Which counties and cities in Utah have rules about data centers?

10 county and city rows are on the record, 6 of them rated: Box Elder County is rated restrictive: Ordinance imposing a 180 day moratorium on new data centers and data center power plants on unincorporated land, June 10, 2026, source (opens in a new tab), Clearfield City is rated restrictive: Clearfield City Council approved a 180 day moratorium on data center development, September 11, 2026, source (opens in a new tab) and Eagle Mountain is rated case by case: Meta and Google received tax incentives or breaks for data centers in Eagle Mountain, August 22, 2026, source (opens in a new tab). The state's own row is rated case by case, with 26 dated acts listed under the scorecard. Resources: the questions people ask about data centers

answered from the rows above

What is proposed or being built near me in Utah, by county?

4 records are not yet running. Utah County: QTS Eagle Mountain (being built) and Volition Industries Spanish Fork (proposed); Box Elder County: Stratos Project (waiting on permits); and Carbon County: Project Beehive (proposed). A county name opens its page with the map and every record there. Resources: the questions people ask about data centers

answered from the rows above

What has the state of Utah itself decided?

1 state law is on the record: H.B. 76 (signed, March 23, 2026, source (opens in a new tab)). The state's own scorecard row carries 26 dated acts, the newest reported September 22, 2026; the laws page has what each law requires in the words of its text. Resources: the questions people ask about data centers

answered from the rows above

Disclosed figures

7.82 GW power, water from 2 records, 4,850 jobs

summed only where a record disclosed the figure

FigureDisclosed totalDisclosedWithout a figureBasis
Power7.82 GW3203 the developer's figure
Water, stated per day1,528,767 gallons a day1211 the developer's figure
Water, stated per year250,000 gallons a year1211 the developer's figure
Permanent jobs4,850 jobs1221 the developer's figure
Tax each year40,000,000 dollars a year1221 the developer's figure

A blank cell means no record in Utah disclosed the figure. Third party figures on the same metrics are listed apart below; a figure a project disclosed about itself is never mixed with them.

FigureDisclosed totalDisclosedWithout a figureBasis
Power7.82 GW3203 the developer's figure
Water, stated per day1,528,767 gallons a day1211 the developer's figure
Water, stated per year250,000 gallons a year1211 the developer's figure
Permanent jobs4,850 jobs1221 the developer's figure
Tax each year$40,000,000 to $44,000,0001221 the developer's figure

A blank total means no record disclosed the figure; the count without one says how many.

Summed only where a record disclosed the figure; a record with no figure adds nothing and is counted as not disclosed. Water is summed per day and per year separately, as the sources stated it, and never converted. A tax claim given as a range is summed at both ends.

The disclosed totals are in the table above.

UseFacilitiesShare of facilitiesAttributed MWShare of attributed MW
AI, type not stated29%250 MW3%
Cloud14%
Government and defense14%
No stated use2191%66 MW1%
Not split between uses17.5 GW96%
No capacity figure2087%

A blank cell means no source attributes power to that use.

23 facilities in Utah. 1 lists more than one use and counts under each, so the facility column can sum past the total. Capacity is attributed to a use only where a source states the share, or where a facility lists a single use. Nothing is divided by estimate.

What each use disclosed

UseRecordsPowerWaterJobsTax each year
AI, type not stated27.75 GW1,528,767 gallons a day; 250,000 gallons a year4,850 jobs$40,000,000 to $44,000,000
Cloud17.5 GW1,528,767 gallons a day4,850 jobs
Government and defense17.5 GW1,528,767 gallons a day4,850 jobs
No stated use2166 MW

A blank cell means no record with that use disclosed the figure.

A record that lists several uses counts once under each; 1 does here. Each cell is the sum over the records with that use, disclosed rows only. The power column adds up to 22.82 GW across the uses, more than the 7.82 GW disclosed in all, because a record with several uses is in each of its rows.

MethodFacilitiesShare of facilities
Closed loop liquid313%
No stated cooling type2087%

23 facilities in Utah. A facility carries one cooling method; nothing here is estimated.

Sources read for Utah

18 sources

18 sources are read for Utah:

Newspapers
Daily Herald (via Google News), Deseret News, The Salt Lake Tribune
Public broadcaster
Fox 13 Salt Lake City, KSL, KUER
Agendas and notices
Spanish Fork public notices, Box Elder County Commission agendas and minutes
Search feeds
10 news searches
Every feed, with its kind and tier

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Only what a source states, with its basis. Nothing is estimated, and a figure no source gives reads not disclosed.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Commercial, enterprise, financial or AI training use needs a commercial license. Prose stays under copyright.
Cite this page Data Center Record, "Data centers in Utah", https://datacenterrecord.org/states/ut, updated October 26, 2026. CSV · JSON · GeoJSON
Cite this page

Data Center Record, "Data center records in Utah", https://datacenterrecord.org/states/ut. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Prose stays under copyright.

Report a change
For researchers
State code
UT
Rating of the state's own row
Case by case
Count by status
proposed 2, waiting on permits 1, being built 1, running 19
Located records
21 located, 2 at a centroid, 0 without coordinates