Tonaquint St. George Data Center

St. George, Washington County, UTDeveloper: Tonaquint Data CentersCensus GEOID 49053

Stage
Running
Buildings
1 building
operator page, verified October 23, 2026
Undisclosed in public filings
Power, Land, Water

Tonaquint Data Centers operates a single building regional colocation facility at 1108 W. 1600 South in St. George, Washington County, Utah. It is running, since January 15, 2026.

How much power it needs, how much water it would use and who would use it have not been disclosed.

Last verified · 1 source, 1 primary · Reviewed by a person, every entry sourced. · How to read this page

  • This record: Running, ringed
  • data center
  • Smaller pins: 22 other published records in Utah
Details
  • this record's location, ringed
  • parcel outline, from the county parcel record
  • city limits, U.S. Census Bureau, on a town level record
  • county boundary

The other pins are the published projects in the same state, each in its stage color. The imagery beneath is the USGS national orthoimagery, public domain, shown so the land around the site can be read.

How to read this page. Every fact links to the source it rests on; a number in brackets is its place in the source list. A figure no source gives reads Not disclosed, and nothing is estimated. Where sources give different figures, each is shown with who gave it, and another source's figure never stands in for the record's own. Entries are added and never overwritten; corrections are listed under What happened.

What is known

Each figure as its source gave it. The number in brackets is its place in the source list.

Buildings
1 building operator page, verified October 23, 2026
[1] tonaquint.com
Who leads it
Tonaquint Data Centers as stated by the source
[1] tonaquint.com
Undisclosed in public filings
Land, Power it would draw, Water, Who would use it, Jobs once it runs, Tax each year
Every field, with who said it and when (Researcher view)

Impact figures

FieldValueWho says soSourceLast verified
How much power it needs
How much water it would use
How loud it would be
Jobs once it runs
Tax it would pay each year

The record's fields

FieldValueWho says soSourceLast verified
Who is building it Tonaquint Data Centers as stated by the source [1] tonaquint.com (opens in a new tab) October 23, 2026
Who is constructing it
How much land
Buildings 1 building operator page, verified October 23, 2026 [1] tonaquint.com (opens in a new tab) October 23, 2026
Where its power comes from
Grid connection
How it is cooled

A blank value cell means not disclosed by any source on file; a blank basis cell means the source gave the figure without saying on what basis.

The developer's figure is what the company said; what a permit allows is the ceiling a permit sets; measured means observed. Water is in gallons a day or a year, whichever the source stated; a tax claim given as a range shows both ends, each linked to the source that gave it.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Power the campus would draw A utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

What happened

  1. · Status: running (content date)

    Tonaquint operates its single building St. George colocation data center in Washington County.

    [1] tonaquint.com

The full Tonaquint St. George Data Center timeline, in order

The site

The pin is the site's address.

The site map is at the top of the page.

Where
1108 W. 1600 South, St. George, UT 84770, St. George, Washington County, Utah [1] tonaquint.com (opens in a new tab)
How exactly it is located
Exact, at the address
The parcel
No parcel outline in the public record
Nearest homes
Not computed for a record placed at a place center
Nearest records
By the straight line between two exact points.

USGS NAIP aerial view of Tonaquint St. George Data Center
LAT 37.08147 / LON -113.60724 Imagery: U.S. Geological Survey / USDA NAIP (Public Domain)

Questions about this project

5 questions answered from the record

Answered from the rows on this page.

How big is Tonaquint St. George Data Center?

The record has one measure of its size: 1 building (operator page, verified October 23, 2026, tonaquint.com (opens in a new tab)). Its power capacity is not disclosed.

Who is building Tonaquint St. George Data Center?

Tonaquint Data Centers is the developer, tonaquint.com (opens in a new tab). No construction contractor is named on the record yet.

How much power and water does Tonaquint St. George Data Center say it needs?

Power: not disclosed by any source on file. Water: not disclosed by any source on file.

Where does Tonaquint St. George Data Center stand today?

It is running, since January 15, 2026. The newest entry, January 15, 2026: Tonaquint operates its single building St. George colocation data center in Washington County. [1]

What has St. George or Washington County decided about it?

No decision by St. George or Washington County about data centers is on the record. The Washington County page and the Utah scorecard list every rated row the day a person publishes one.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Primary documents

  1. Tonaquint St. George Data Center Facility Specification (opens in a new tab), Tonaquint Data Centers, January 15, 2026

1 source on file.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Commercial, enterprise, financial or AI training use needs a commercial license. Prose stays under copyright.
Cite this page Data Center Record, "Tonaquint St. George Data Center", https://datacenterrecord.org/projects/tonaquint-data-center-inc-tonaquint-data-center-saint-george-saint-george-ut, last verified October 23, 2026. CSV · JSON
Cite this page

Data Center Record, "Tonaquint St. George Data Center", https://datacenterrecord.org/projects/tonaquint-data-center-inc-tonaquint-data-center-saint-george-saint-george-ut. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Prose stays under copyright.

Report a change
For researchers
Stage
Running
Tier
reviewed in depth
Tags
Reviewed in depth
Coordinates
37.081472, -113.607242
How the location is known
Location from the site's street address.
Location source
Tonaquint St. George facility specification and Washington County Assessor parcel at 1108 W. 1600 South, St. George.
Coordinate source
Washington County Assessor parcel at 1108 W. 1600 South, St. George
Location source number
[1]
Location last verified
October 23, 2026
Published
October 21, 2026
Last verified
October 23, 2026
Undisclosed in public filings
EPA registry id, Uses, Tenancy, Cooling, How capacity was disclosed, How water was disclosed, How acreage was disclosed, Interconnection, Capacity, if disclosed, Rating of the county's rows

Researcher view · Tonaquint St. George Data Center · 1 source, 1 entry, 0 decisions nearby · basis and source tier on every row · verified October 23, 2026

Download CSV JSON