Data Center Record.

Being built Built from one source

QTS Eagle Mountain

QTS Data Centers lists a data center at Eagle Mountain, Utah and says it is being built. It is being built; the record holds no sourced date for when it reached that stage.

How much power it needs, how much water it would use and who would use it have not been disclosed.

Last verified · 3 sources, 3 primary · A skeleton record: built from one source, not yet reviewed in depth by a person. · How to read this page

How to read this page. Every fact links to the source it rests on; a number in brackets is its place in the source list. A figure no source gives reads Not disclosed, and nothing is estimated. Where sources give different figures, each is shown with who gave it, and another source's figure never stands in for the record's own. Entries are added and never overwritten; corrections are listed under What happened.

What is known

Each figure as its source gave it. The number in brackets is its place in the source list.

Land
Not disclosed
Power it would draw
Not disclosed
Water
Not disclosed
Who leads it
QTS Data Centers
as stated by the source
Who would use it
Not disclosed
Jobs once it runs
Not disclosed
Tax each year
Not disclosed
Every field, with who said it and when (Researcher view)

Impact figures

FieldValueWho says soSourceLast verified
How much power it needs Not disclosed
How much water it would use Not disclosed
How loud it would be Not disclosed
Jobs once it runs Not disclosed
Tax it would pay each year Not disclosed

The record's fields

FieldValueWho says soSourceLast verified
Who is building it QTS Data Centers as stated by the source October 4, 2026
Who is constructing it Not disclosed
How much land Not disclosed
Where its power comes from Not disclosed
Grid connection Not disclosed
How it is cooled Not disclosed

The developer's figure is what the company said; what a permit allows is the ceiling a permit sets; measured means observed. Water is in gallons a day or a year, whichever the source stated; a tax claim given as a range shows both ends, each linked to the source that gave it.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water useA state water right filing or a water supply agreement.
  • Who would use itA lease announcement or a tenant named in a filing.
  • Power the campus would drawA utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Jobs and taxAn incentive agreement, a county's economic development filing or a fiscal note.

What was decided

Acts of Utah County and Eagle Mountain about data centers, on the record with their source. A rule about the area is not a decision about this record.

DateWhoDecisionSource
Spanish Fork restrictive City Council approved zoning change allowing data center at mouth of Spanish Fork Canyon sltrib.com
Spanish Fork restrictive Spanish Fork City Council members limited the city to only one data center unless city leaders vote to change that in the future. ksl.com
Spanish Fork restrictive Spanish Fork City Council voted to approve changes to city code for a data center. ksl.com
Spanish Fork restrictive Spanish Fork City Council decided not to amend Title 15 after months of study and a two week delay, deferring the final decision for another two weeks fox13now.com
Spanish Fork restrictive A Spanish Fork public hearing on August 18 lasted more than six hours with dozens of residents expressing concerns about the Volition proposal ksl.com
Spanish Fork restrictive Spanish Fork City Council delayed the Title 15 amendment vote a second time, for another two weeks. fox13now.com
12 earlier decisions on the county's rows
DateWhoDecisionSource
Eagle Mountain Eagle Mountain walked back its first tax hike but residents will still pay about double the old rate sltrib.com
Eagle Mountain Meta and Google received tax incentives or breaks for data centers in Eagle Mountain sltrib.com
Eagle Mountain Eagle Mountain raised property taxes 183% sltrib.com
Spanish Fork restrictive The proposed regulations would limit no more than two data center sites with onsite power generation within city limits sltrib.com
Spanish Fork restrictive Spanish Fork is considering changing city code to establish rules and requirements for data centers with onsite power generation facilities sltrib.com
Spanish Fork restrictive Proposed amendments require closed loop, air cooled or dry cooling systems to limit water use heraldextra.com
Spanish Fork restrictive Proposed amendments to Title 15 would cap a data center at 500 megawatts heraldextra.com
Spanish Fork restrictive Spanish Fork City Council worked to establish requirements for data centers and other facilities that generate their own electricity by amending Title 15 of the municipal code heraldextra.com
Spanish Fork restrictive City council tabled resolution to amend ordinance allowing data centers to generate their own power fox13now.com
Spanish Fork restrictive Spanish Fork city council held five hour public hearing on data center proposal with dozens of commenters fox13now.com
Spanish Fork restrictive The Spanish Fork City Council voted to table the ordinance after a six and a half hour meeting with extensive public comment yahoo.com
Spanish Fork restrictive After a six hour public hearing, Spanish Fork City Council tabled a vote on Title 15 amendments that would set rules for self powered data centers until September 1. heraldextra.com

What happened

  1. · Status: being built (the day the page was read; it gives no date of its own)

    QTS Data Centers lists QTS Eagle Mountain at Eagle Mountain, Utah on its own page of data center locations, read September 14, 2026. [3]

The full QTS Eagle Mountain timeline, in order

1 correction to this record

Every correction, with its reason
  1. · the effective at of a status history row

    Dated from its source: the row's own text states it: "... read September 14, 2026." The old and new text.

Every correction on the record is on the corrections page.

The site

Where in Eagle Mountain is not in the public record. The pin marks the center of Eagle Mountain, not a building, and the outline is Utah County.

  • This record: Being built, ringed
  • data center
  • Dashed edge: the exact site is not in the public record
  • Smaller pins: 12 other published records in Utah
Details
  • this record's location, ringed
  • parcel outline, from the county parcel record
  • city limits, U.S. Census Bureau, on a town level record
  • county boundary

The other pins are the published projects in the same state, each in its stage color. The imagery beneath is the USGS national orthoimagery, public domain, shown so the land around the site can be read.

Where
Virtual Drive, Eagle Mountain, UT 84005, Eagle Mountain, Utah County, Utah [source]
How exactly it is located
Town level, the center of the city
The parcel
No parcel outline in the public record
Nearest homes
Not computed for a record placed at a place center
Nearest records
Nearest records are not computed for a record placed at the center of its town.

Questions about this project

4 questions answered from the record

Answered from the rows on this page.

Who is building QTS Eagle Mountain?

QTS Data Centers is the developer. No construction contractor is named on the record yet.

How much power and water does QTS Eagle Mountain say it needs?

Power: not disclosed by any source on file. Water: not disclosed by any source on file.

Where does QTS Eagle Mountain stand today?

It is being built; the date it reached that stage is not sourced, only the day a page was read. The newest entry, read on September 14, 2026: QTS Data Centers lists QTS Eagle Mountain at Eagle Mountain, Utah on its own page of data center locations, read September 14, 2026. [3]

What has Eagle Mountain or Utah County decided about it?

Spanish Fork (rated restrictive): City Council approved zoning change allowing data center at mouth of Spanish Fork Canyon (reported September 24, 2026, source); and Spanish Fork: Spanish Fork City Council members limited the city to only one data center unless city leaders vote to change that in the future. (reported September 24, 2026, source). 18 events are on the county's rows; a rule about the area is not a decision about this record.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Primary documents

  1. EPA ECHO detailed facility report: QTS SLC DC1, U.S. Environmental Protection Agency
  2. QTS Data Centers: All locations, QTS Data Centers, September 14, 2026
  3. QTS Data Centers lists QTS Eagle Mountain at Eagle Mountain, Utah, QTS Data Centers

3 sources on file.

Cite this record

Data Center Record, "QTS Eagle Mountain", https://datacenterrecord.org/projects/qts-eagle-mountain-ut, last verified October 4, 2026.

Last verified , first recorded . Every correction is logged on the corrections page and under What happened.

Cite this page

Data Center Record, "QTS Eagle Mountain", https://datacenterrecord.org/projects/qts-eagle-mountain-ut. Data: Data Center Record, datacenterrecord.org, CC BY 4.0.

The structured rows are CC BY 4.0. Link to this page; that is what turns a reuse into a citation. Prose stays under copyright.

Report a change
For researchers
Slug
qts-eagle-mountain-ut
Status value
under_construction
Stage
Being built
Tier
skeleton
Tags
skeleton
Place id
us/ut/utah-county/eagle-mountain
Coordinates
40.3142721, -112.0119828
Location precision
city
Location source
U.S. Census Bureau TIGERweb city centroid, public domain
Coordinate source
tigerweb city centroid
Location source number
Not disclosed
Location last verified
September 14, 2026
EPA registry id
Not disclosed
Use type values
not_disclosed
Tenancy value
not_disclosed
Cooling type value
not_disclosed
Capacity basis
not_disclosed
Water basis
not_disclosed, gallons_per_day
Acreage basis
Not disclosed
Interconnection value
not_disclosed
Capacity, if disclosed
Not disclosed
Rating of the county's rows
Restrictive
Published
2026-09-14
Last verified
2026-10-04