● Being Built First recorded September 14, 2026

QTS Eagle Mountain

Street address Virtual Drive and Sweetwater Road, Eagle Mountain, UT 84005, Utah County permit coordinates Exact, the point of the EPA's facility record [1] EPA ECHO detailed facility report: QTS SLC DC1

Overview, regulatory gates and specifications

QTS Data Centers is constructing its QTS SLC DC1 hyperscale data center campus in Eagle Mountain, Utah County, Utah under stormwater permits UTRC08700 and UTRC11607. [1] QTS Data Centers lists QTS Eagle Mountain at Eagle Mountain, Utah on its own page of data center locations, read September 14, 2026. [3]

1. Land & Parcel
Parcel located
2. Local Zoning
Zoning approved
3. Tax & EDA Deal
Not yet on file
4. Utility Grid Queue
Not yet on file
5. Air & Water Permits
EPA air permit on file
What happens next: Campus is under construction; building inspections, utility energization and air permits are monitored.
Electricity Demand
Not disclosed
No MW figure in public filings yet

U.S. EIA residential equivalence (~830 homes per MW) will compute automatically once a permit or filing states facility megawatts.

Utility interconnection queue filings monitored.

Cooling & Water
Not disclosed
Daily water volume not stated in public filings

U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.

No local property tax abatement amount disclosed in public filings.

Site & Buildings
Not disclosed
Acreage not stated in public filings yet

Assessor parcel acreage and building square footage are added when municipal or county filings are published.

Location: Virtual Drive and Sweetwater Road, Eagle Mountain, UT 84005.

Taxes & Permanent Jobs
Not disclosed
Tax and job figures not yet on file

State and local tax abatement agreements and permanent job commitments are recorded when filed.

No local property tax abatement amount disclosed in public filings.

Key specifications on the record

Power capacity
Not disclosed
Water usage
Not disclosed
Land area
Not disclosed
Buildings
Not disclosed
Backup generators
Not disclosed
Capital investment
Not disclosed
Who leads it
QTS Data Centers as stated by the source
[1] echo.epa.gov
Official project website
q.com (opens in a new tab) verified October 28, 2026
q.com (opens in a new tab)
Archived promotional websites
q.com (opens in a new tab) [Wayback snapshot] (opens in a new tab) preserved in Internet Archive
tracked domains
Not disclosed
Who would use it, Jobs once it runs, Tax each year

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: QTS Data Centers
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for QTS Eagle Mountain.

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW)
Site Footprint (Acres)
Data Hall Buildings
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Power the campus would draw A utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Hearings and statements on the record

October 20, 2026 Utah County, UT Utah County Planning Commission Regular Meeting Utah County Planning Commission 3 clips

The Utah County Planning Commission debated Application 2026 09 creating a Data Center Overlay Zone on remand from the County Commission, reviewing 21 written public comments opposing unincorporated data centers and adding third party licensed engineer review requirements for nearby water wells.

  1. Bryce Armstrong, Associate Director of Community Development, Utah County Board & Planning Staff transcribed from the official recording
    "So, as the commission is aware, this item is returning to you. it was continued from our last meeting. the county commission asked that the staff look at specific items in the ordinance regard regarding data centers. Those items included feedback from interested parties and"
  2. Bryce Armstrong, Associate Director of Community Development, Utah County Board & Planning Staff transcribed from the official recording
    "did receive many comments. most were in opposition to having a data center ordinance or allowing data centers. just to be clear of to the date that staff or Planning Commission directed staff to receive comments. The majority of the comments were"
  3. Seth Cox, Commissioner, Utah County Planning Commission Board & Planning Staff transcribed from the official recording
    "engineer. And then we can have again third party review that, a licensed engineer at the county's choosing to review that, and then the data center has to the applicant or data center will have to pay for that review. So, it's not done by or that the county doesn't have to pay for it. So, we do have that re- reporting requirement, and then if they are"
October 6, 2026 Eagle Mountain, UT Eagle Mountain City Council Regular Meeting Eagle Mountain City Council 4 clips

Eagle Mountain City Council held a public hearing and deliberated on Items 14A and 14B governing the Corrigan Farms data center rezoning, natural gas turbine power generation for Meta's campus, and developer obligations for municipal sewer lift stations.

  1. Resident public comment Resident Public Comment transcribed from the official recording
    "My name is Amy L. and I'm actually a resident of Towilla County and I'm here with Towilla Cares and we're part of a coalition that is just asking for a moratorum on any new data center across the state. So, I'm here for 14B right now asking that you say no for any new zoning that allows for a data center out here in Eagle Mountain. Thank you. That's all I have."
  2. Resident public comment Resident Public Comment transcribed from the official recording
    "[clears throat] Okay. My name is Hosinto M. and I'm here concerning the Oh jeez. The Corgan Farms data center. I'm just concerned with our current data"
  3. Eagle Mountain City Council Member Elected Official transcribed from the official recording
    "Williams energy, the gentleman that that brought that up, that's I've been out there. I've been to the site. I've walked through where the 17 turbines are going to be going. It's a 289 megawatt project that is intended to power three data centers. Meta has kind of hit capacity with their green energy initiative with Rocky Mountain Power. Rocky Mountain Power basically said we"
  4. Eagle Mountain City Council Member Elected Official transcribed from the official recording
    "user fees typically, I guess, is what I would say. the maintenance and operation of our lift stations. Then then then I may be a no on a lift station connection for a for a for a data center. That's what I'm saying. I don't want to maintain another lift center, another lift station that the citizens are maintaining even though there's user fees associated with it because the citizens are going to bear a portion of that cost and it's going to"
September 21, 2026 Spanish Fork, UT Spanish Fork City Council Vote on Data Center Code Amendment Spanish Fork City Council 2 clips

Spanish Fork City Council voted on September 21, 2026 to approve municipal code amendments establishing energy grid isolation, resource caps, and technology restrictions for the proposed Volition data center.

  1. Resident public comment Resident Public Comment transcribed from local broadcast report
    "going to get some kind of to come to their city at to have something to prot Wood is among the many lo out on this issue since s month. Even if you say we we don't need them in our she hopes the city counci protections by requiring technology restrictions,"
  2. Resident public comment Resident Public Comment transcribed from local broadcast report
    "with the council needing plan and development agre Volition. Once that's don could bring around 1000 t 300 jobs at full build ou to hire locally first as estimates the project on foot warehouse will cost taking up to 3 years to c"
August 18, 2026 Spanish Fork, UT Spanish Fork City Council Public Hearing on Data Center Ordinance Spanish Fork City Council 3 clips

Spanish Fork City Council held a late night public hearing on August 18, 2026 on proposed zoning code rules for data centers as Volition pitched redeveloping the former Fingerhut warehouse at the mouth of Spanish Fork Canyon.

  1. KSL News Utah Broadcast Report Broadcast Report transcribed from local broadcast report
    "been told that there are still a few more people online. Now, tonight's hearing was never to decide if this particular data center were to come to Spanish Fork, rather it was to decide on the rules and regulations if a data center were ever to come to this city. Now, we're talking about this property off of Highway 6. It's the This data center would replace the old Fingerhut warehouse at the mouth of Spanish Fork"
  2. Jeff Chavez, Chief Executive Officer, Volition Developer Representative transcribed from local broadcast report
    "large development of new homes there. Provo based company Volition wants to put a center right there, and CEO Jeff Chavez insists their facilities are different in design, structure, and approval process. The whole reason why we engaged as a company was to address the hotly contested"
  3. KSL News Utah Broadcast Report Broadcast Report transcribed from local broadcast report
    "Tonight, Volition went through major concerns around data centers and talked about how theirs operates. Chavez says Volition centers bring their own power. He said they would never connect to or impact the power grid. They use natural gas to power the fuel cell. And when it comes to noise, he said their cooling system is the loudest piece of equipment they have, and it's indoors. He also said they have a closed loop water"
March 10, 2026 Provo, UT Provo Municipal Council Regular Meeting Provo City Council 2 clips

Provo City Council held a public hearing on a Zone Map Amendment applying the newly enacted Planned Industrial Commercial Data Center Overlay Zone to a project site at 1507 South 180 East.

  1. Dustin Wright, City Planner, City of Provo Board & Planning Staff transcribed from the official recording
    "zone map classification of real property generally located at 1507 South 180 east from the planned industrial commercial zone to the planned industrial commercial data center overlay zone. This will be presented by Dustin Wright. Are they not on? They don't sound like"
  2. Dustin Wright, City Planner, City of Provo Board & Planning Staff transcribed from the official recording
    "property. So, the property is currently in our planned industrial commercial zone. And they're applying for the zone map amendment to apply an overlay zone, which is that newly created data center overlay zone. So, this would be the first project that's come in to request this overlay zone. our general plan in this area is commercial,"
Said and filed

Said and filed

Statements and filings, side by side

Column A · Dated Statement
Rachel Peterson and Eagle Mountain Officials Vice President of Data Center Strategy, Meta (Facebook)
Venue: Eagle Mountain Data Center Groundbreaking and Opening Remarks
"Our Eagle Mountain data center will be supported by 100 percent renewable energy, will use 80 percent less water than average data centers, and will fund hundreds of millions of dollars in new electrical, water, and sewer infrastructure for the community."
Column B · Subsequent Recorded Position
Eagle Mountain City Council Item 14B Hearing on 289 MW Williams Natural Gas Plant and Sewer Lift Station Cost Burden
Eagle Mountain City Council Item 14B · Utah DAQ Approval Order (Williams 289 MW Gas Plant)
Agency or Venue: Eagle Mountain City Council and Utah Division of Air Quality
"During the October 6, 2026 Eagle Mountain City Council hearing on Item 14B, officials and residents confronted the approval of a dedicated 289 megawatt Williams natural gas turbine plant burning fossil fuel exclusively for the Meta campus while municipal ratepayers faced a multimillion dollar sewer lift station upgrade triggered by industrial discharge."

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

No dated entry is on the record yet.

Every event in order

  • Read on September 14, 2026 (the day the page was read; it gives no date of its own)

    QTS Data Centers lists QTS Eagle Mountain at Eagle Mountain, Utah on its own page of data center locations, read September 14, 2026.

    [3] q.com

1 correction to this record

Every correction, with its reason
  1. · Timeline date

    Dated from its source: the row's own text states it: "... read September 14, 2026."

Every correction on the record is on the corrections page.

Nearest data centers in Utah

Verified data center records in Utah within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
Meta Eagle Mountain Data Center Eagle Mountain, Utah County 1 mi Running Meta 900 acres
Intelligence Community Comprehensive National Cybersecurity Initiative Data Center Bluffdale, Salt Lake County 10 mi Running National Security Agency
DataBank Granite Point Campus (SLC2, SLC3, SLC4, SLC5, SLC6) Bluffdale, Salt Lake County 14 mi Running DataBank 66 MW
DataBank Salt Lake City Granite Point (SLC2 Bluffdale) Bluffdale, Salt Lake County 14 mi Running DataBank 1 building
DataBank Salt Lake City Granite Point (SLC3 Bluffdale) Bluffdale, Salt Lake County 14 mi Running DataBank 1 building
DataBank Salt Lake City Granite Point (SLC4 Bluffdale) Bluffdale, Salt Lake County 14 mi Running DataBank 1 building

Blank cell: not disclosed by any source on file.

Common questions about QTS Eagle Mountain

Answered directly from the verified filings and local actions on this page.

Who is building QTS Eagle Mountain?

QTS Data Centers is the developer, echo.epa.gov (opens in a new tab). No construction contractor is named on the record yet.

How much power and water does QTS Eagle Mountain say it needs?

Power: not disclosed by any source on file. Water: not disclosed by any source on file.

Where does QTS Eagle Mountain stand today?

It is being built; the date it reached that stage is not sourced, only the day a page was read. No dated entry is on the record yet.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Tracked project domains

Promotional domains, campaign sites, and municipal portals preserved through the Internet Archive.

Primary documents

  1. EPA ECHO detailed facility report: QTS SLC DC1 (opens in a new tab), U.S. Environmental Protection Agency
  2. QTS Data Centers: All locations (opens in a new tab), QTS Data Centers, September 14, 2026
  3. QTS Data Centers lists QTS Eagle Mountain at Eagle Mountain, Utah (opens in a new tab), QTS Data Centers

3 sources on file.

Regional grid context

This site is in the Northwest Power Pool (NWPP) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "QTS Eagle Mountain", https://datacenterrecord.org/projects/qts-eagle-mountain-ut, last verified October 23, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "QTS Eagle Mountain", https://datacenterrecord.org/projects/qts-eagle-mountain-ut. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Being built
Tier
reviewed in depth
Tags
Reviewed in depth
Coordinates
40.30421, -112.02581
How the location is known
Location from an EPA facility record.
Location source
EPA ECHO facility report 110071707118 (NPDES permits UTRC08700 and UTRC11607) for QTS SLC DC1 in Eagle Mountain, UT 84005.
Coordinate source
EPA ECHO permit point 110071707118 for QTS SLC DC1 in Eagle Mountain
Location source number
[1]
Location last verified
October 23, 2026
EPA registry id
110071707118
Published
September 14, 2026
Last verified
October 23, 2026
Not disclosed
Uses, Tenancy, Cooling, How capacity was disclosed, How water was disclosed, How acreage was disclosed, Interconnection, Capacity, if disclosed, Rating of the county's rows

Researcher view · QTS Eagle Mountain · 3 sources, 1 entry · basis and source tier on every row · verified October 23, 2026

Download CSV JSON