QTS Eagle Mountain
QTS Data Centers lists a data center at Eagle Mountain, Utah and says it is being built. It is being built; the record holds no sourced date for when it reached that stage.
How much power it needs, how much water it would use and who would use it have not been disclosed.
How to read this page. Every fact links to the source it rests on; a number in brackets is its place in the source list. A figure no source gives reads Not disclosed, and nothing is estimated. Where sources give different figures, each is shown with who gave it, and another source's figure never stands in for the record's own. Entries are added and never overwritten; corrections are listed under What happened.
What is known
Each figure as its source gave it. The number in brackets is its place in the source list.
- Land
- Not disclosed
- Power it would draw
- Not disclosed
- Water
- Not disclosed
- Who leads it
- QTS Data Centers
- as stated by the source
- Who would use it
- Not disclosed
- Jobs once it runs
- Not disclosed
- Tax each year
- Not disclosed
Every field, with who said it and when (Researcher view)
Impact figures
| Field | Value | Who says so | Source | Last verified |
|---|---|---|---|---|
| How much power it needs | Not disclosed | |||
| How much water it would use | Not disclosed | |||
| How loud it would be | Not disclosed | |||
| Jobs once it runs | Not disclosed | |||
| Tax it would pay each year | Not disclosed |
The record's fields
| Field | Value | Who says so | Source | Last verified |
|---|---|---|---|---|
| Who is building it | QTS Data Centers | as stated by the source | October 4, 2026 | |
| Who is constructing it | Not disclosed | |||
| How much land | Not disclosed | |||
| Where its power comes from | Not disclosed | |||
| Grid connection | Not disclosed | |||
| How it is cooled | Not disclosed |
The developer's figure is what the company said; what a permit allows is the ceiling a permit sets; measured means observed. Water is in gallons a day or a year, whichever the source stated; a tax claim given as a range shows both ends, each linked to the source that gave it.
Still not public, and where it would show up
The record adds each the day a source gives it. Why these documents.
- Water useA state water right filing or a water supply agreement.
- Who would use itA lease announcement or a tenant named in a filing.
- Power the campus would drawA utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
- Jobs and taxAn incentive agreement, a county's economic development filing or a fiscal note.
What was decided
Acts of Utah County and Eagle Mountain about data centers, on the record with their source. A rule about the area is not a decision about this record.
| Date | Who | Decision | Source |
|---|---|---|---|
| Spanish Fork | City Council approved zoning change allowing data center at mouth of Spanish Fork Canyon | sltrib.com | |
| Spanish Fork | Spanish Fork City Council members limited the city to only one data center unless city leaders vote to change that in the future. | ksl.com | |
| Spanish Fork | Spanish Fork City Council voted to approve changes to city code for a data center. | ksl.com | |
| Spanish Fork | Spanish Fork City Council decided not to amend Title 15 after months of study and a two week delay, deferring the final decision for another two weeks | fox13now.com | |
| Spanish Fork | A Spanish Fork public hearing on August 18 lasted more than six hours with dozens of residents expressing concerns about the Volition proposal | ksl.com | |
| Spanish Fork | Spanish Fork City Council delayed the Title 15 amendment vote a second time, for another two weeks. | fox13now.com |
12 earlier decisions on the county's rows
| Date | Who | Decision | Source |
|---|---|---|---|
| Eagle Mountain | Eagle Mountain walked back its first tax hike but residents will still pay about double the old rate | sltrib.com | |
| Eagle Mountain | Meta and Google received tax incentives or breaks for data centers in Eagle Mountain | sltrib.com | |
| Eagle Mountain | Eagle Mountain raised property taxes 183% | sltrib.com | |
| Spanish Fork | The proposed regulations would limit no more than two data center sites with onsite power generation within city limits | sltrib.com | |
| Spanish Fork | Spanish Fork is considering changing city code to establish rules and requirements for data centers with onsite power generation facilities | sltrib.com | |
| Spanish Fork | Proposed amendments require closed loop, air cooled or dry cooling systems to limit water use | heraldextra.com | |
| Spanish Fork | Proposed amendments to Title 15 would cap a data center at 500 megawatts | heraldextra.com | |
| Spanish Fork | Spanish Fork City Council worked to establish requirements for data centers and other facilities that generate their own electricity by amending Title 15 of the municipal code | heraldextra.com | |
| Spanish Fork | City council tabled resolution to amend ordinance allowing data centers to generate their own power | fox13now.com | |
| Spanish Fork | Spanish Fork city council held five hour public hearing on data center proposal with dozens of commenters | fox13now.com | |
| Spanish Fork | The Spanish Fork City Council voted to table the ordinance after a six and a half hour meeting with extensive public comment | yahoo.com | |
| Spanish Fork | After a six hour public hearing, Spanish Fork City Council tabled a vote on Title 15 amendments that would set rules for self powered data centers until September 1. | heraldextra.com |
What happened
-
· Status: being built (the day the page was read; it gives no date of its own)
QTS Data Centers lists QTS Eagle Mountain at Eagle Mountain, Utah on its own page of data center locations, read September 14, 2026. [3]
The full QTS Eagle Mountain timeline, in order
1 correction to this record
Every correction, with its reason
-
· the effective at of a status history row
Dated from its source: the row's own text states it: "... read September 14, 2026." The old and new text.
Every correction on the record is on the corrections page.
The site
Where in Eagle Mountain is not in the public record. The pin marks the center of Eagle Mountain, not a building, and the outline is Utah County.
Tap a pin for the data center, the parcel for its record
- This record: Being built, ringed
- data center
- Dashed edge: the exact site is not in the public record
- Smaller pins: 12 other published records in Utah
Details
- this record's location, ringed
- parcel outline, from the county parcel record
- city limits, U.S. Census Bureau, on a town level record
- county boundary
The other pins are the published projects in the same state, each in its stage color. The imagery beneath is the USGS national orthoimagery, public domain, shown so the land around the site can be read.
- Where
- Virtual Drive, Eagle Mountain, UT 84005, Eagle Mountain, Utah County, Utah [source]
- How exactly it is located
- Town level, the center of the city
- The parcel
- No parcel outline in the public record
- Nearest homes
- Not computed for a record placed at a place center
- Nearest records
- Nearest records are not computed for a record placed at the center of its town.
Questions about this project
4 questions answered from the record
Who is building QTS Eagle Mountain?
-
QTS Data Centers is the developer. No construction contractor is named on the record yet.
How much power and water does QTS Eagle Mountain say it needs?
-
Power: not disclosed by any source on file. Water: not disclosed by any source on file.
Where does QTS Eagle Mountain stand today?
-
It is being built; the date it reached that stage is not sourced, only the day a page was read. The newest entry, read on September 14, 2026: QTS Data Centers lists QTS Eagle Mountain at Eagle Mountain, Utah on its own page of data center locations, read September 14, 2026. [3]
What has Eagle Mountain or Utah County decided about it?
-
Spanish Fork (rated restrictive): City Council approved zoning change allowing data center at mouth of Spanish Fork Canyon (reported September 24, 2026, source); and Spanish Fork: Spanish Fork City Council members limited the city to only one data center unless city leaders vote to change that in the future. (reported September 24, 2026, source). 18 events are on the county's rows; a rule about the area is not a decision about this record.
Sources
Primary documents
- EPA ECHO detailed facility report: QTS SLC DC1, U.S. Environmental Protection Agency
- QTS Data Centers: All locations, QTS Data Centers, September 14, 2026
- QTS Data Centers lists QTS Eagle Mountain at Eagle Mountain, Utah, QTS Data Centers
3 sources on file.
Cite this record
Data Center Record, "QTS Eagle Mountain", https://datacenterrecord.org/projects/qts-eagle-mountain-ut, last verified October 4, 2026.
Cite this page
Data Center Record, "QTS Eagle Mountain", https://datacenterrecord.org/projects/qts-eagle-mountain-ut. Data: Data Center Record, datacenterrecord.org, CC BY 4.0.
The structured rows are CC BY 4.0. Link to this page; that is what turns a reuse into a citation. Prose stays under copyright.
For researchers
- Slug
- qts-eagle-mountain-ut
- Status value
- under_construction
- Stage
- Being built
- Tier
- skeleton
- Tags
- skeleton
- Place id
- us/ut/utah-county/eagle-mountain
- Coordinates
- 40.3142721, -112.0119828
- Location precision
- city
- Location source
- U.S. Census Bureau TIGERweb city centroid, public domain
- Coordinate source
- tigerweb city centroid
- Location source number
- Not disclosed
- Location last verified
- September 14, 2026
- EPA registry id
- Not disclosed
- Use type values
- not_disclosed
- Tenancy value
- not_disclosed
- Cooling type value
- not_disclosed
- Capacity basis
- not_disclosed
- Water basis
- not_disclosed, gallons_per_day
- Acreage basis
- Not disclosed
- Interconnection value
- not_disclosed
- Capacity, if disclosed
- Not disclosed
- Rating of the county's rows
- Restrictive
- Published
- 2026-09-14
- Last verified
- 2026-10-04