● Running First recorded September 14, 2026 · 5 Buildings

DataBank Granite Point Campus (SLC2, SLC3, SLC4, SLC5, SLC6)

Street address 14870 S. Pony Express Road, Bluffdale, UT 84065, Salt Lake County permit coordinates Exact, the point of the EPA's facility record [3] DataBank Salt Lake City Granite Point Campus Specification (SLC2, SLC3, SLC4, SLC5, SLC6)

Overview, regulatory gates and specifications

DataBank operates the 23 acre, 5 building Granite Point colocation campus (SLC2, SLC3, SLC4, SLC5, and SLC6) at 14870 S. Pony Express Road in Bluffdale, Salt Lake County, Utah, with 66 megawatts of critical IT capacity. [1] Filings on the record specify disclosed capacity of 66 MW (the developer's figure). [3] DataBank lists DataBank Salt Lake City data center at Salt Lake City, Utah on its own page of data center locations, read September 14, 2026. [2]

1. Land & Parcel
23 acres on file
2. Local Zoning
Zoning approved
3. Tax & EDA Deal
Not yet on file
4. Utility Grid Queue
Energized
5. Air & Water Permits
EPA air permit on file
What happens next: Facility is operational; air permit compliance, water reporting and utility filings are monitored.
Electricity Demand [3]
66 MW
the developer's figure

Equivalent to ~54,780 U.S. homes (U.S. EIA 830 homes/MW baseline) · 3.2% of Hoover Dam nameplate capacity (2,080 MW).

Grid interconnection and utility service tracked on file.

Cooling & Water
Not disclosed
Daily water volume not stated in public filings

U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.

No local property tax abatement amount disclosed in public filings.

Site & Buildings [3]
23 acres
the developer's figure

5 planned or operational data hall buildings.

Location: 14870 S. Pony Express Road, Bluffdale, UT 84065.

Taxes & Permanent Jobs
Not disclosed
Tax and job figures not yet on file

State and local tax abatement agreements and permanent job commitments are recorded when filed.

No local property tax abatement amount disclosed in public filings.

Key specifications on the record

Power capacity
66 MW developer figure Equivalent to the continuous electricity demand of about 54,800 average U.S. homes based on U.S. Energy Information Administration residential consumption data. About 0.6 percent of New York City's summer peak demand in 2024.
[3] databank.com
Water usage
Not disclosed
Land area
23 acres developer figure
[3] databank.com
Buildings
5 buildings operator page
[3] databank.com
Backup generators
Not disclosed
Capital investment
Not disclosed
Commissioned
Operational since 2017 (9 years)
Who leads it
DataBank as stated by the source
[3] databank.com
Official project website
databank.com (opens in a new tab) verified October 28, 2026
databank.com (opens in a new tab)
Not disclosed
Who would use it, Jobs once it runs, Tax each year
The math behind the comparison
  1. DataBank Granite Point Campus (SLC2, SLC3, SLC4, SLC5, SLC6), capacity: 66 MW.
  2. New York City (NYISO Zone J) summer peak demand, actual, 2024: 10,245 MW (2024).
  3. 66 ÷ 10,245 = 0.0064 (MW over MW).

Sources:

A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: DataBank
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for DataBank Granite Point Campus (SLC2, SLC3, SLC4, SLC5, SLC6).

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW) 66 MW 66 MW the developer's figure [3] databank.com
Site Footprint (Acres) 23 acres 23 acres the developer's figure [3] databank.com
Data Hall Buildings 5 buildings 5 operator page [3] databank.com
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Hearings and statements on the record

September 29, 2026 West Jordan, UT West Jordan Data Center Neighborhood Noise and Zoning Hearing Report West Jordan City Council 3 clips

West Jordan residents living adjacent to the 55 acre data center campus documented continuous low frequency cooling hum and backup diesel generator noise and petitioned city officials for stricter acoustic mitigation.

  1. Resident public comment Resident Public Comment transcribed from local broadcast report
    "For Teresa Sorensen, this hum has become part of her life at home. I hear it in every room in my house when the generators run. Sorensen's lived in this West Jordan neighborhood for more than three decades. Across the street is the Lumen Data Center's West Jordan campus on roughly 55 acres. It's literally three houses down. Sorensen says there's a low hum she hears regularly, but when generators turn on can't even hold a conversation out here, let alone sit out and enjoy your"
  2. Steve R. Resident Public Comment transcribed from local broadcast report
    "our view. He says he's having sleepless nights because of the noise. It echoes off our houses. I woke up this morning hearing that, and I thought, "Oh, the generators are running." So, there are times that I have to make other noise so I can sleep. So have other neighbors like Steve R. 3:00 in the morning, they're running. It's kind of a wind tunnel or a tunnel straight through to my yard. Lumen Data Center says it's taken steps to cut down on the impact to neighbors."
  3. McKenzie Edmonds, ABC4 Utah Broadcast Report Broadcast Report transcribed from local broadcast report
    "Now they run them random all the time. And as more data centers are proposed across Utah, Steve R. says he also wants neighbors to pay attention early on. We're not afraid of data centers, just not in the middle of our neighborhood. So, just make sure you're informed. Try to find out about these things before it happens. McKenzie Edmonds, ABC 4 News."

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

No dated entry is on the record yet.

Every event in order

  • Read on September 14, 2026 (the day the page was read; it gives no date of its own)

    DataBank lists DataBank Salt Lake City data center at Salt Lake City, Utah on its own page of data center locations, read September 14, 2026.

    [2] databank.com

1 correction to this record

Every correction, with its reason
  1. · Timeline date

    Dated from its source: the row's own text states it: "... read September 14, 2026."

Every correction on the record is on the corrections page.

Nearest data centers in Utah

Verified data center records in Utah within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
DataBank Salt Lake City Granite Point (SLC4 Bluffdale) Bluffdale, Salt Lake County Less than 1 mi Running DataBank 1 building
DataBank Salt Lake City Granite Point (SLC3 Bluffdale) Bluffdale, Salt Lake County Less than 1 mi Running DataBank 1 building
DataBank Salt Lake City Granite Point (SLC2 Bluffdale) Bluffdale, Salt Lake County Less than 1 mi Running DataBank 1 building
FIBERSTATE Salt Lake City (SLC1) Draper, Salt Lake County 3 mi Running FIBERSTATE 1 building
Intelligence Community Comprehensive National Cybersecurity Initiative Data Center Bluffdale, Salt Lake County 4 mi Running National Security Agency
Aligned Data Centers West Jordan (SLC-01, SLC-02, SLC-03) West Jordan, Salt Lake County 8 mi Running Aligned Data Centers 55 acres

Blank cell: not disclosed by any source on file.

Common questions about DataBank Granite Point Campus (SLC2, SLC3, SLC4, SLC5, SLC6)

Answered directly from the verified filings and local actions on this page.

Who is building DataBank Granite Point Campus (SLC2, SLC3, SLC4, SLC5, SLC6)?

DataBank is the developer, databank.com (opens in a new tab). No construction contractor is named on the record yet.

How much power and water does DataBank Granite Point Campus (SLC2, SLC3, SLC4, SLC5, SLC6) say it needs?

Power: 66 MW (the developer's figure, databank.com (opens in a new tab)). Water: not disclosed by any source on file.

Where does DataBank Granite Point Campus (SLC2, SLC3, SLC4, SLC5, SLC6) stand today?

It is running; the date it reached that stage is not sourced, only the day a page was read. No dated entry is on the record yet.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Tracked project domains

Promotional domains, campaign sites, and municipal portals preserved through the Internet Archive.

Primary documents

  1. DataBank: Data centers (opens in a new tab), DataBank, September 14, 2026
  2. DataBank lists Salt Lake City data center at Salt Lake City, Utah (opens in a new tab), DataBank
  3. DataBank Salt Lake City Granite Point Campus Specification (SLC2, SLC3, SLC4, SLC5, SLC6) (opens in a new tab), DataBank, January 15, 2026
  4. EPA ECHO Detailed Facility Report: DATABANK SLC 6 & 7 (FRS 110070707553, 14860 Pony Express Road, Bluffdale, UT 84065) (opens in a new tab), U.S. Environmental Protection Agency / Utah Department of Environmental Quality, October 23, 2026

Reporting

  1. DataBank opens fifth Salt Lake City data center, SLC5 - Data Center Dynamics (opens in a new tab), Data Center Dynamics, July 23, 2020, news outlet
  2. DataBank acquires Utah's C7 Data Centers - Data Center Dynamics (opens in a new tab), Data Center Dynamics, January 18, 2017, news outlet
  3. DataBank Buys C7, Enters Salt Lake City Data Center Market - Data Center Knowledge (opens in a new tab), Data Center Knowledge, May 31, 2024, news outlet
  4. DataBank Announces Integration of Salt Lake City Data Centers and Substation Expansion - prweb.com (opens in a new tab), prweb.com, August 30, 2017, press release
  5. DataBank starts building another Salt Lake, Utah data center - Data Center Dynamics (opens in a new tab), Data Center Dynamics, May 1, 2019, news outlet

9 sources on file.

Regional grid context

This site is in the Northwest Power Pool (NWPP) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "DataBank Granite Point Campus (SLC2, SLC3, SLC4, SLC5, SLC6)", https://datacenterrecord.org/projects/databank-salt-lake-city-data-center-ut, last verified October 23, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "DataBank Granite Point Campus (SLC2, SLC3, SLC4, SLC5, SLC6)", https://datacenterrecord.org/projects/databank-salt-lake-city-data-center-ut. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Running
Tier
reviewed in depth
Tags
Reviewed in depth
Coordinates
40.48142, -111.91685
How the location is known
Location from an EPA facility record.
Location source
EPA ECHO Detailed Facility Report 110070707553 (DATABANK SLC 6 & 7, 14860 Pony Express Road, Bluffdale, UT 84065) and DataBank Granite Point campus pages.
Coordinate source
Salt Lake County Assessor parcel at 14870 S. Pony Express Road, Bluffdale
Location source number
[3]
Location last verified
October 23, 2026
How capacity was disclosed
the developer's figure
How acreage was disclosed
the developer's figure
Capacity, if disclosed
66 MW, the developer's figure
Published
September 14, 2026
Last verified
October 23, 2026
Not disclosed
EPA registry id, Uses, Tenancy, Cooling, How water was disclosed, Interconnection, Rating of the county's rows