Meta
New buildings will use closed loop liquid cooling system with dry cooling requiring no water during normal operations
Meta lists a data center at Eagle Mountain, Utah among the sites it operates. It is being built, as reported September 14, 2026.
How much power it needs, how much water it would use and who would use it have not been disclosed.
How to read this page. Every fact links to the source it rests on; a number in brackets is its place in the source list. A figure no source gives reads Not disclosed, and nothing is estimated. Where sources give different figures, each is shown with who gave it, and another source's figure never stands in for the record's own. Entries are added and never overwritten; corrections are listed under What happened. An offer to the community is shown as its source states it, with its condition, and never added to another.
Each figure as its source gave it. The number in brackets is its place in the source list.
| Field | Value | Who says so | Source | Last verified |
|---|---|---|---|---|
| How much power it needs | Not disclosed | |||
| How much water it would use | Not disclosed | |||
| How loud it would be | Not disclosed | |||
| Jobs once it runs | Not disclosed | |||
| Tax it would pay each year | Not disclosed |
| Field | Value | Who says so | Source | Last verified |
|---|---|---|---|---|
| Who is building it | Meta | as stated by the source | October 3, 2026 | |
| Who is constructing it | Not disclosed | |||
| How much land | 300 acres | third party estimate | [6] datacenterfrontier.com | October 3, 2026 |
| Where its power comes from | Not disclosed | |||
| Grid connection | Not disclosed | |||
| How it is cooled | Not disclosed |
How much power it needs, also reported: 400 MW, 2026 (Utah News Dispatch: Meta data center in New Albany, Ohio powered by 400MW of dedicated natural gas turbines, Utah News Dispatch: Meta data center in New Albany Ohio powered by 400 megawatts of dedicated natural gas turbines enough energy to power over 300,000 homes) .
The developer's figure is what the company said; what a permit allows is the ceiling a permit sets; measured means observed. Water is in gallons a day or a year, whichever the source stated; a tax claim given as a range shows both ends, each linked to the source that gave it.
The record adds each the day a source gives it. Why these documents.
Acts of Utah County and Eagle Mountain about data centers, on the record with their source. A rule about the area is not a decision about this record.
| Date | Who | Decision | Source |
|---|---|---|---|
| Spanish Fork | City Council approved zoning change allowing data center at mouth of Spanish Fork Canyon | sltrib.com | |
| Spanish Fork | Spanish Fork City Council members limited the city to only one data center unless city leaders vote to change that in the future. | ksl.com | |
| Spanish Fork | Spanish Fork City Council voted to approve changes to city code for a data center. | ksl.com | |
| Spanish Fork | Spanish Fork City Council decided not to amend Title 15 after months of study and a two week delay, deferring the final decision for another two weeks | fox13now.com | |
| Spanish Fork | A Spanish Fork public hearing on August 18 lasted more than six hours with dozens of residents expressing concerns about the Volition proposal | ksl.com | |
| Spanish Fork | Spanish Fork City Council delayed the Title 15 amendment vote a second time, for another two weeks. | fox13now.com |
| Date | Who | Decision | Source |
|---|---|---|---|
| Eagle Mountain | Eagle Mountain walked back its first tax hike but residents will still pay about double the old rate | sltrib.com | |
| Eagle Mountain | Meta and Google received tax incentives or breaks for data centers in Eagle Mountain | sltrib.com | |
| Eagle Mountain | Eagle Mountain raised property taxes 183% | sltrib.com | |
| Spanish Fork | The proposed regulations would limit no more than two data center sites with onsite power generation within city limits | sltrib.com | |
| Spanish Fork | Spanish Fork is considering changing city code to establish rules and requirements for data centers with onsite power generation facilities | sltrib.com | |
| Spanish Fork | Proposed amendments require closed loop, air cooled or dry cooling systems to limit water use | heraldextra.com | |
| Spanish Fork | Proposed amendments to Title 15 would cap a data center at 500 megawatts | heraldextra.com | |
| Spanish Fork | Spanish Fork City Council worked to establish requirements for data centers and other facilities that generate their own electricity by amending Title 15 of the municipal code | heraldextra.com | |
| Spanish Fork | City council tabled resolution to amend ordinance allowing data centers to generate their own power | fox13now.com | |
| Spanish Fork | Spanish Fork city council held five hour public hearing on data center proposal with dozens of commenters | fox13now.com | |
| Spanish Fork | The Spanish Fork City Council voted to table the ordinance after a six and a half hour meeting with extensive public comment | yahoo.com | |
| Spanish Fork | After a six hour public hearing, Spanish Fork City Council tabled a vote on Title 15 amendments that would set rules for self powered data centers until September 1. | heraldextra.com |
(source date; the content gives no date of its own)
Meta first broke ground in 2018 [17]
(source date; the content gives no date of its own)
Campus opened in 2021 at 1275 N. Community Circle [17]
· Status: being built (source date; the content gives no date of its own)
Meta expands Eagle Mountain data center with $2.5 million community investment [17]
· Status: running (the day the page was read; it gives no date of its own)
Meta lists Meta Eagle Mountain Data Center at Eagle Mountain, Utah on its own page of data center locations, read September 14, 2026. [2]
(content date)
Meta announced Phase 3 expansion of Eagle Mountain data center project [14]
Moratorium (content date)
Turner halted work at the Meta data center site [15]
(content date)
Mortenson Construction fired a worker who left a yellow noose at Meta Eagle Mountain data center construction site [5]
(source date; the content gives no date of its own)
Turner Construction shut down a Facebook data center site in Iowa due to noose being discovered on anniversary of end of slavery [9]
(source date; the content gives no date of its own)
Turner Construction shut down a Facebook data center project in Ohio due to racist graffiti [9]
(content date)
Construction suspended for one day following noose incident [9]
(content date)
Worker responsible for noose incident was fired [9], also [5]
(content date)
Mortenson Construction offered $100,000 reward for information identifying person responsible [9]
(content date)
Noose found at Meta Eagle Mountain data center construction site [9], also [12], also The Salt Lake Tribune query feed
(content date)
Mortenson offered $100,000 reward for information leading to identification of person(s) responsible [12]
(content date)
Noose like rope found at Meta data center construction site in Eagle Mountain [12]
(content date)
Racist graffiti was found at Eagle Mountain construction site in November, with Mortenson offering $50,000 reward [5]
(content date)
Work halted until Friday for additional safety protocols and training [13]
(content date)
Mortenson offered $50,000 reward for information identifying person responsible for vandalism [13]
(content date)
Construction halted after additional instances of racist or hateful graffiti found at Eagle Mountain site [13]
(content date)
Mortenson and Meta offered $50,000 reward for information on perpetrator [8], also [12]
(content date)
Site wide stand down ordered by Mortenson following racist graffiti incident [8]
(content date)
Racist graffiti found at Meta data center construction site in Eagle Mountain on November 8, 2021 [8]
(content date)
Mortenson offered $50,000 reward for information on November incident [12]
(content date)
Racist message found in portable bathroom in November 2021 [12]
(content date)
In November 2021, employees found racist graffiti including Kill a n word day 11/29 on construction toilets at the same site [9]
(content date)
First instance of racist slur and threat found in portable bathroom earlier in month [13]
(source date; the content gives no date of its own)
Facebook plans to expand Eagle Mountain campus by more than 900,000 square feet with two new data centers in February, boosting planned development to five data center buildings [6]
(source date; the content gives no date of its own)
Google opened a Google Cloud Platform region in Salt Lake City last year, leasing space from a data center provider [6]
(source date; the content gives no date of its own)
Second expansion of 900,000 square feet was announced in February 2021 [7]
(source date; the content gives no date of its own)
First expansion of 500,000 square feet was announced in 2019 [7]
· being built (source date; the content gives no date of its own)
Solar farm is scheduled to be in service at the end of 2023 [7]
The full Meta Eagle Mountain Data Center timeline, in order
· the kind of source of a history entry
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of 2026-09-23). The link did not change. The day's label corrections.
· the kind of source of a history entry
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of 2026-09-23). The link did not change. The day's label corrections.
· the kind of source of a history entry
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of 2026-09-23). The link did not change. The day's label corrections.
· the kind of source of a history entry
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of 2026-09-23). The link did not change. The day's label corrections.
· the kind of source of a history entry
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of 2026-09-23). The link did not change. The day's label corrections.
· the kind of source of a history entry
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of 2026-09-23). The link did not change. The day's label corrections.
· the kind of source of a history entry
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of 2026-09-23). The link did not change. The day's label corrections.
· the kind of source of a history entry
The source was labeled with the Google News search that found it; it now carries its outlet's tier: the tier the record already gives kutv.com. The link did not change. The day's label corrections.
· the kind of source of a history entry
The source was labeled with the Google News search that found it; it now carries its outlet's tier: the tier the record already gives kutv.com. The link did not change. The day's label corrections.
· the kind of source of a history entry
The source was labeled with the Google News search that found it; it now carries its outlet's tier: the tier the record already gives kutv.com. The link did not change. The day's label corrections.
· the kind of source of a history entry
Tier after resolution (2026-09-21). The source on file is kutv.com, the publisher's own page. The item reached the record through Google News: "data center" Utah, which the record carries at tier 1, and the approve copied the feed's tier onto this row. The tier now comes from the outlet, which the record already carries at tier 4 on 1 row of sources. DECISIONS section 7. The speaker, the claim, the date and the url are unchanged. The day's label corrections.
· the kind of source of a history entry
Tier after resolution (2026-09-21). The source on file is kutv.com, the publisher's own page. The item reached the record through Google News: "data center" Utah, which the record carries at tier 1, and the approve copied the feed's tier onto this row. The tier now comes from the outlet, which the record already carries at tier 4 on 1 row of sources. DECISIONS section 7. The speaker, the claim, the date and the url are unchanged. The day's label corrections.
· the effective at of a status history row
Dated from its source: the row's own text states it: "... read September 14, 2026." The old and new text.
Every correction on the record is on the corrections page.
Campus annual water use will be less than typical golf course in region
The project would not include a long term significant employment base according to West Jordan city manager
Every statement about data centers in Utah, by speaker
Meta
New buildings will use closed loop liquid cooling system with dry cooling requiring no water during normal operations
Where in Eagle Mountain is not in the public record. The pin marks the center of Eagle Mountain, not a building, and the outline is Utah County.
Tap a pin for the data center, the parcel for its record
The other pins are the published projects in the same state, each in its stage color. The imagery beneath is the USGS national orthoimagery, public domain, shown so the land around the site can be read.
Community fund paid
Meta donated $200,000 to Hobble Creek Flow Restoration project [14]
Kind community_fund, recipients nonprofits, condition none_stated, status paid, date basis: content date; the amount in the source's words: “$200,000”.
The record has one measure of its size: 300 acres (third party estimate, source). Its power capacity is not disclosed.
Meta is the developer. No construction contractor is named on the record yet.
Not disclosed. No source on file names a tenant, says whether the site is single or multi tenant, or states what it is for. The record keeps the use as not disclosed until one does; see Who it serves.
Community fund from Meta: $200,000 in all, to “Central Utah Water Conservancy District” (paid), source. Each is shown with its condition under What the developer has offered.
Power: not disclosed by any source on file. Water: not disclosed by any source on file.
It is being built, as reported September 14, 2026. The newest entry, reported September 14, 2026: Meta first broke ground in 2018 [17].
Spanish Fork (rated restrictive): City Council approved zoning change allowing data center at mouth of Spanish Fork Canyon (reported September 24, 2026, source); and Spanish Fork: Spanish Fork City Council members limited the city to only one data center unless city leaders vote to change that in the future. (reported September 24, 2026, source). 18 events are on the county's rows; a rule about the area is not a decision about this record.
Not disclosed by any source on file: how much power it needs, how much water it would use, how loud it would be, jobs once it runs, tax it would pay each year, who is constructing it, where its power comes from, grid connection, how it is cooled. No missing primary document is listed for this record yet; What the record lacks is where one appears when a person names it.
22 sources on file.
Data Center Record, "Meta Eagle Mountain Data Center", https://datacenterrecord.org/projects/meta-eagle-mountain-data-center-ut, last verified October 3, 2026.
Data Center Record, "Meta Eagle Mountain Data Center", https://datacenterrecord.org/projects/meta-eagle-mountain-data-center-ut. Data: Data Center Record, datacenterrecord.org, CC BY 4.0.
The structured rows are CC BY 4.0. Link to this page; that is what turns a reuse into a citation. Prose stays under copyright.