● Running Announced June 30, 2021 · 5 Buildings · Meta

Meta Eagle Mountain Data Center

Street address 2000 N. Pony Express Parkway, Eagle Mountain, UT 84005, Utah County verified address Exact, at the address [4] Meta Eagle Mountain Data Center Campus Fact Sheet (Stadler Pahvant LLC)

Overview, regulatory gates and specifications

Meta operates and expands a 5 building, 2.4 million square foot hyperscale data center campus through subsidiary Stadler Pahvant LLC at 2000 N. Pony Express Parkway in Eagle Mountain, Utah County, Utah. [8] Filings on the record specify a 900 acre site footprint. [4] Meta operates its Eagle Mountain Data Center campus at 1275 North Community Circle, which opened in 2021 and is expanding across five buildings. [20]

1. Land & Parcel
900 acres on file
2. Local Zoning
Zoning approved
3. Tax & EDA Deal
Incentive review
4. Utility Grid Queue
Energized
5. Air & Water Permits
EPA air permit on file
What happens next: Facility is operational; air permit compliance, water reporting and utility filings are monitored.
Electricity Demand
Not disclosed
No MW figure in public filings yet

U.S. EIA residential equivalence (~830 homes per MW) will compute automatically once a permit or filing states facility megawatts.

Utility interconnection queue filings monitored.

Cooling & Water
Not disclosed
Daily water volume not stated in public filings

U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.

No local property tax abatement amount disclosed in public filings.

Site & Buildings [4]
900 acres
the developer's figure

5 planned or operational data hall buildings.

Location: 2000 N. Pony Express Parkway, Eagle Mountain, UT 84005.

Taxes & Permanent Jobs
Not disclosed
Tax and job figures not yet on file

State and local tax abatement agreements and permanent job commitments are recorded when filed.

No local property tax abatement amount disclosed in public filings.

Key specifications on the record

Power capacity
Not disclosed
Water usage
Not disclosed
Land area
900 acres developer figure
[4] datacenters.atmeta.com
Buildings
5 buildings operator page
[4] datacenters.atmeta.com
Backup generators
Not disclosed
Capital investment
$120 million developer figure
[17] w.media
Commissioned
Operational since 2021 (5 years)
Who leads it
Meta as stated by the source
[4] datacenters.atmeta.com
Not disclosed
Who would use it, Jobs once it runs, Tax each year

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Meta

Public Record Speaker

DID Recorded statement at KUTV (September 14, 2026) [20]
SAID Campus annual water use will be less than typical golf course in region (September 14, 2026) [20]

West Jordan city manager

Public Record Speaker

DID Recorded statement at DataCenterKnowledge (May 30, 2024)
SAID The project would not include a long term significant employment base according to West Jordan city manager (May 30, 2024) datacenterknowledge.com (opens in a new tab)

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: Meta
UTILITIES
Electric utility: Not disclosed

View all 3 statements on the record in Utah →

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for Meta Eagle Mountain Data Center.

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW)
Site Footprint (Acres) 900 acres 900 acres the developer's figure [4] datacenters.atmeta.com
Data Hall Buildings 5 buildings 5 operator page [4] datacenters.atmeta.com
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Power the campus would draw A utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Hearings and statements on the record

2025 to 2026 hearings
October 20, 2026 Utah County, UT Utah County Planning Commission Regular Meeting Utah County Planning Commission 3 clips

The Utah County Planning Commission debated Application 2026 09 creating a Data Center Overlay Zone on remand from the County Commission, reviewing 21 written public comments opposing unincorporated data centers and adding third party licensed engineer review requirements for nearby water wells.

  1. Bryce Armstrong, Associate Director of Community Development, Utah County Board & Planning Staff transcribed from the official recording
    "So, as the commission is aware, this item is returning to you. it was continued from our last meeting. the county commission asked that the staff look at specific items in the ordinance regard regarding data centers. Those items included feedback from interested parties and"
  2. Bryce Armstrong, Associate Director of Community Development, Utah County Board & Planning Staff transcribed from the official recording
    "did receive many comments. most were in opposition to having a data center ordinance or allowing data centers. just to be clear of to the date that staff or Planning Commission directed staff to receive comments. The majority of the comments were"
  3. Seth Cox, Commissioner, Utah County Planning Commission Board & Planning Staff transcribed from the official recording
    "engineer. And then we can have again third party review that, a licensed engineer at the county's choosing to review that, and then the data center has to the applicant or data center will have to pay for that review. So, it's not done by or that the county doesn't have to pay for it. So, we do have that re- reporting requirement, and then if they are"
October 6, 2026 Eagle Mountain, UT Eagle Mountain City Council Regular Meeting Eagle Mountain City Council 4 clips

Eagle Mountain City Council held a public hearing and deliberated on Items 14A and 14B governing the Corrigan Farms data center rezoning, natural gas turbine power generation for Meta's campus, and developer obligations for municipal sewer lift stations.

  1. Resident public comment Resident Public Comment transcribed from the official recording
    "My name is Amy L. and I'm actually a resident of Towilla County and I'm here with Towilla Cares and we're part of a coalition that is just asking for a moratorum on any new data center across the state. So, I'm here for 14B right now asking that you say no for any new zoning that allows for a data center out here in Eagle Mountain. Thank you. That's all I have."
  2. Resident public comment Resident Public Comment transcribed from the official recording
    "[clears throat] Okay. My name is Hosinto M. and I'm here concerning the Oh jeez. The Corgan Farms data center. I'm just concerned with our current data"
  3. Eagle Mountain City Council Member Elected Official transcribed from the official recording
    "Williams energy, the gentleman that that brought that up, that's I've been out there. I've been to the site. I've walked through where the 17 turbines are going to be going. It's a 289 megawatt project that is intended to power three data centers. Meta has kind of hit capacity with their green energy initiative with Rocky Mountain Power. Rocky Mountain Power basically said we"
  4. Eagle Mountain City Council Member Elected Official transcribed from the official recording
    "user fees typically, I guess, is what I would say. the maintenance and operation of our lift stations. Then then then I may be a no on a lift station connection for a for a for a data center. That's what I'm saying. I don't want to maintain another lift center, another lift station that the citizens are maintaining even though there's user fees associated with it because the citizens are going to bear a portion of that cost and it's going to"
September 21, 2026 Spanish Fork, UT Spanish Fork City Council Vote on Data Center Code Amendment Spanish Fork City Council 2 clips

Spanish Fork City Council voted on September 21, 2026 to approve municipal code amendments establishing energy grid isolation, resource caps, and technology restrictions for the proposed Volition data center.

  1. Resident public comment Resident Public Comment transcribed from local broadcast report
    "going to get some kind of to come to their city at to have something to prot Wood is among the many lo out on this issue since s month. Even if you say we we don't need them in our she hopes the city counci protections by requiring technology restrictions,"
  2. Resident public comment Resident Public Comment transcribed from local broadcast report
    "with the council needing plan and development agre Volition. Once that's don could bring around 1000 t 300 jobs at full build ou to hire locally first as estimates the project on foot warehouse will cost taking up to 3 years to c"
August 18, 2026 Spanish Fork, UT Spanish Fork City Council Public Hearing on Data Center Ordinance Spanish Fork City Council 3 clips

Spanish Fork City Council held a late night public hearing on August 18, 2026 on proposed zoning code rules for data centers as Volition pitched redeveloping the former Fingerhut warehouse at the mouth of Spanish Fork Canyon.

  1. KSL News Utah Broadcast Report Broadcast Report transcribed from local broadcast report
    "been told that there are still a few more people online. Now, tonight's hearing was never to decide if this particular data center were to come to Spanish Fork, rather it was to decide on the rules and regulations if a data center were ever to come to this city. Now, we're talking about this property off of Highway 6. It's the This data center would replace the old Fingerhut warehouse at the mouth of Spanish Fork"
  2. Jeff Chavez, Chief Executive Officer, Volition Developer Representative transcribed from local broadcast report
    "large development of new homes there. Provo based company Volition wants to put a center right there, and CEO Jeff Chavez insists their facilities are different in design, structure, and approval process. The whole reason why we engaged as a company was to address the hotly contested"
  3. KSL News Utah Broadcast Report Broadcast Report transcribed from local broadcast report
    "Tonight, Volition went through major concerns around data centers and talked about how theirs operates. Chavez says Volition centers bring their own power. He said they would never connect to or impact the power grid. They use natural gas to power the fuel cell. And when it comes to noise, he said their cooling system is the loudest piece of equipment they have, and it's indoors. He also said they have a closed loop water"
March 10, 2026 Provo, UT Provo Municipal Council Regular Meeting Provo City Council 2 clips

Provo City Council held a public hearing on a Zone Map Amendment applying the newly enacted Planned Industrial Commercial Data Center Overlay Zone to a project site at 1507 South 180 East.

  1. Dustin Wright, City Planner, City of Provo Board & Planning Staff transcribed from the official recording
    "zone map classification of real property generally located at 1507 South 180 east from the planned industrial commercial zone to the planned industrial commercial data center overlay zone. This will be presented by Dustin Wright. Are they not on? They don't sound like"
  2. Dustin Wright, City Planner, City of Provo Board & Planning Staff transcribed from the official recording
    "property. So, the property is currently in our planned industrial commercial zone. And they're applying for the zone map amendment to apply an overlay zone, which is that newly created data center overlay zone. So, this would be the first project that's come in to request this overlay zone. our general plan in this area is commercial,"
2019 to 2024 hearings
July 14, 2021 Eagle Mountain, UT Facebook data center opens in Eagle Mountain Eagle Mountain City Council 2 clips

Eagle Mountain City Council approval record for the Facebook Sweetwater hyperscale data center tax increment financing and infrastructure agreement (July 14, 2021).

  1. Eagle Mountain Economic Development and Applicant Presentation Developer Representative transcribed from local broadcast report
    "morning dan and kerry so facebook's Eagle Mountain data center broke ground in 2018 and today it is officially open so it is one of only 17 facebook data centers in the world it's now live and serving traffic which means when you're sharing photos and videos or sending messages it can now be stored in the Eagle Mountain center facebook says utah is such a great place to do business because of the"
  2. FOX 13 News Utah Broadcast Report Broadcast Report transcribed from local broadcast report
    "the community facebook is really committed to the long term vitality of Eagle Mountain city in all of Utah County so this represents to us more than a billion dollars investment in utah it represents to us not just a place to work but a place to live also it represents to us a community to be a part of"
Said and filed

Said and filed

Statements and filings, side by side

Column A · Dated Statement
Rachel Peterson and Eagle Mountain Officials Vice President of Data Center Strategy, Meta (Facebook)
Venue: Eagle Mountain Data Center Groundbreaking and Opening Remarks
"Our Eagle Mountain data center will be supported by 100 percent renewable energy, will use 80 percent less water than average data centers, and will fund hundreds of millions of dollars in new electrical, water, and sewer infrastructure for the community."
Column B · Subsequent Recorded Position
Eagle Mountain City Council Item 14B Hearing on 289 MW Williams Natural Gas Plant and Sewer Lift Station Cost Burden
Eagle Mountain City Council Item 14B · Utah DAQ Approval Order (Williams 289 MW Gas Plant)
Agency or Venue: Eagle Mountain City Council and Utah Division of Air Quality
"During the October 6, 2026 Eagle Mountain City Council hearing on Item 14B, officials and residents confronted the approval of a dedicated 289 megawatt Williams natural gas turbine plant burning fossil fuel exclusively for the Meta campus while municipal ratepayers faced a multimillion dollar sewer lift station upgrade triggered by industrial discharge."

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

  1. · Status: running (source date; the content gives no date of its own)

    Meta operates its Eagle Mountain Data Center campus at 1275 North Community Circle, which opened in 2021 and is expanding across five buildings.

    [20] kutv.com

  2. · Status: being built (source date; the content gives no date of its own)

    Meta first broke ground in 2018

    [20] kutv.com

  3. · Status: running (source date; the content gives no date of its own)

    Campus opened in 2021 at 1275 N. Community Circle

    [20] kutv.com

  4. · Status: being built (source date; the content gives no date of its own)

    Meta expands Eagle Mountain data center with $2.5 million community investment

    [20] kutv.com

  5. (content date)

    Meta announced Phase 3 expansion of Eagle Mountain data center project

    [17] w.media

  6. Moratorium (content date)

    Turner halted work at the Meta data center site

    [18] constructiondive.com

  7. (content date)

    Mortenson Construction fired a worker who left a yellow noose at Meta Eagle Mountain data center construction site

    [8] datacenterdynamics.com

  8. (content date)

    Construction suspended for one day following noose incident

    [12] datacenterdynamics.com

21 earlier entries
  1. (content date)

    Worker responsible for noose incident was fired

    [12] datacenterdynamics.com, also [8] datacenterdynamics.com

  2. (content date)

    Mortenson Construction offered $100,000 reward for information identifying person responsible

    [12] datacenterdynamics.com

  3. (content date)

    Noose found at Meta Eagle Mountain data center construction site

    [12] datacenterdynamics.com, also [15] kutv.com, also The Salt Lake Tribune (opens in a new tab) public registry

  4. (content date)

    Mortenson offered $100,000 reward for information leading to identification of person(s) responsible

    [15] kutv.com

  5. (content date)

    Noose like rope found at Meta data center construction site in Eagle Mountain

    [15] kutv.com

  6. (content date)

    Racist graffiti was found at Eagle Mountain construction site in November, with Mortenson offering $50,000 reward

    [8] datacenterdynamics.com

  7. (content date)

    Work halted until Friday for additional safety protocols and training

    [16] kutv.com

  8. (content date)

    Mortenson offered $50,000 reward for information identifying person responsible for vandalism

    [16] kutv.com

  9. (content date)

    Construction halted after additional instances of racist or hateful graffiti found at Eagle Mountain site

    [16] kutv.com

  10. (content date)

    Mortenson and Meta offered $50,000 reward for information on perpetrator

    [11] datacenterdynamics.com, also [15] kutv.com

  11. (content date)

    Site wide stand down ordered by Mortenson following racist graffiti incident

    [11] datacenterdynamics.com

  12. (content date)

    Racist graffiti found at Meta data center construction site in Eagle Mountain on November 8, 2021

    [11] datacenterdynamics.com

  13. (content date)

    Mortenson offered $50,000 reward for information on November incident

    [15] kutv.com

  14. (content date)

    Racist message found in portable bathroom in November 2021

    [15] kutv.com

  15. (content date)

    In November 2021, employees found racist graffiti including Kill a n word day 11/29 on construction toilets at the same site

    [12] datacenterdynamics.com

  16. (content date)

    First instance of racist slur and threat found in portable bathroom earlier in month

    [16] kutv.com

  17. (source date; the content gives no date of its own)

    Facebook plans to expand Eagle Mountain campus by more than 900,000 square feet with two new data centers in February, boosting planned development to five data center buildings

    [9] datacenterfrontier.com

  18. (source date; the content gives no date of its own)

    Google opened a Google Cloud Platform region in Salt Lake City last year, leasing space from a data center provider

    [9] datacenterfrontier.com

  19. (source date; the content gives no date of its own)

    Second expansion of 900,000 square feet was announced in February 2021

    [10] datacenterdynamics.com

  20. (source date; the content gives no date of its own)

    First expansion of 500,000 square feet was announced in 2019

    [10] datacenterdynamics.com

  21. · being built (source date; the content gives no date of its own)

    Solar farm is scheduled to be in service at the end of 2023

    [10] datacenterdynamics.com

Every event in order

  • Read on September 14, 2026 (the day the page was read; it gives no date of its own)

    Meta lists Meta Eagle Mountain Data Center at Eagle Mountain, Utah on its own page of data center locations, read September 14, 2026.

    [2] datacenters.atmeta.com

15 corrections to this record

Every correction, with its reason
  1. · Publication status

    Held unplaced under the record's rules (October 13, 2026): the entry's words are about Iowa, and this record is in Utah. Kept off the record, never deleted; it can be restored.

  2. · Publication status

    Held unplaced under the record's rules (October 13, 2026): the entry's words are about Ohio, and this record is in Utah. Kept off the record, never deleted; it can be restored.

  3. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  4. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  5. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  6. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  7. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  8. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  9. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  10. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier: the tier the record already gives kutv.com. The link did not change.

  11. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier: the tier the record already gives kutv.com. The link did not change.

  12. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier: the tier the record already gives kutv.com. The link did not change.

  13. · Source tier

    Tier after resolution (September 21, 2026). The source on file is kutv.com, the publisher's own page. The item reached the record through Google News: "data center" Utah, which the record carries at tier 1, and the approve copied the feed's tier onto this row. The tier now comes from the outlet, which the record already carries at tier 4 on 1 row of sources. The speaker, the claim, the date and the url are unchanged.

  14. · Source tier

    Tier after resolution (September 21, 2026). The source on file is kutv.com, the publisher's own page. The item reached the record through Google News: "data center" Utah, which the record carries at tier 1, and the approve copied the feed's tier onto this row. The tier now comes from the outlet, which the record already carries at tier 4 on 1 row of sources. The speaker, the claim, the date and the url are unchanged.

  15. · Timeline date

    Dated from its source: the row's own text states it: "... read September 14, 2026."

Every correction on the record is on the corrections page.

Nearest data centers in Utah

Verified data center records in Utah within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
QTS Eagle Mountain Eagle Mountain, Utah County 1 mi Being built QTS Data Centers
Intelligence Community Comprehensive National Cybersecurity Initiative Data Center Bluffdale, Salt Lake County 10 mi Running National Security Agency
DataBank Salt Lake City Granite Point (SLC2 Bluffdale) Bluffdale, Salt Lake County 14 mi Running DataBank 1 building
DataBank Granite Point Campus (SLC2, SLC3, SLC4, SLC5, SLC6) Bluffdale, Salt Lake County 14 mi Running DataBank 66 MW
DataBank Salt Lake City Granite Point (SLC3 Bluffdale) Bluffdale, Salt Lake County 14 mi Running DataBank 1 building
DataBank Salt Lake City Granite Point (SLC4 Bluffdale) Bluffdale, Salt Lake County 14 mi Running DataBank 1 building

Blank cell: not disclosed by any source on file.

What the developer has offered

community fund, from Meta

What the companies behind this project have offered or agreed to give the people and governments around the site, newest first. How offers are recorded.

  1. Community fund paid

    Meta donated $200,000 to Hobble Creek Flow Restoration project [17]

    Offered by
    Meta
    To
    “Central Utah Water Conservancy District”
    Amount
    $200,000 in all
    On what condition
    None stated by the source
    Date
    October 3, 2022

    Kind community_fund, recipients nonprofits, condition none_stated, status paid, date basis: content date; the amount in the source's words: “$200,000”.

Common questions about Meta Eagle Mountain Data Center

Answered directly from the verified filings and local actions on this page.

Who is building Meta Eagle Mountain Data Center?

Meta is the developer, datacenters.atmeta.com (opens in a new tab). No construction contractor is named on the record yet.

What has been offered to the community around Meta Eagle Mountain Data Center?
How much power and water does Meta Eagle Mountain Data Center say it needs?

Power: not disclosed by any source on file. Water: not disclosed by any source on file.

Where does Meta Eagle Mountain Data Center stand today?

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Tracked project domains

Promotional domains, campaign sites, and municipal portals preserved through the Internet Archive.

Primary documents

  1. Meta: Our U.S. data center fleet (opens in a new tab), Meta, September 14, 2026
  2. Meta lists Eagle Mountain Data Center at Eagle Mountain, Utah (opens in a new tab), Meta
  3. US EPA ECHO Detailed Facility Report: Meta Eagle Mountain Data Center (FRS 110070894122, Utah DAQ Synthetic Minor Approval Order) (opens in a new tab), U.S. Environmental Protection Agency
  4. Meta Eagle Mountain Data Center Campus Fact Sheet (Stadler Pahvant LLC) (opens in a new tab), Meta, September 14, 2026
  5. EPA ECHO Detailed Facility Report: 1499 Pioneer Parkway, Eagle Mountain, UT 84005 (FRS 110071310579, CWA UTRC04407 / UTRC09924) (opens in a new tab), U.S. Environmental Protection Agency / Utah Department of Environmental Quality, October 23, 2026

Reporting

  1. Growing outward: Meta announces expansion of Eagle Mountain data center facility, contributions to community - heraldextra.com (opens in a new tab), heraldextra.com, September 14, 2026, local outlet
  2. Meta got a 40-year tax break for its $1.5 billion data center. Now neighbors face a 183% property tax hike - moneywise.com (opens in a new tab), moneywise.com, August 19, 2026, national outlet
  3. Mortenson fires worker for noose at Facebook data center site - Data Center Dynamics (opens in a new tab), Data Center Dynamics, March 23, 2022, trade press
  4. Google Buys Land in Growing Cloud Cluster in Utah - Data Center Frontier (opens in a new tab), Data Center Frontier, October 5, 2021, trade press
  5. Facebook to invest in 120MW solar farm in Utah to power Eagle Mountain data center - Data Center Dynamics (opens in a new tab), Data Center Dynamics, June 30, 2021, trade press
  6. Contractor Mortenson shuts down Meta/Facebook data center construction site in Utah due to racist graffiti - Data Center Dynamics (opens in a new tab), Data Center Dynamics, November 22, 2021, trade press
  7. Noose found at Facebook Utah data center construction site, in another racist incident - Data Center Dynamics (opens in a new tab), Data Center Dynamics, March 22, 2022, trade press
  8. Meta to expand Eagle Mountain data center campus in Utah (opens in a new tab), Data Center Dynamics, September 15, 2026, trade press
  9. Meta to expand Eagle Mountain data center campus in Utah - Data Center Dynamics (opens in a new tab), Data Center Dynamics, September 15, 2026, trade press
  10. Police investigating noose like rope found at Facebook data center construction site - KUTV (opens in a new tab), KUTV, March 21, 2022, local outlet
  11. Construction halted at Facebook data center site after additional 'hateful' messages found - KUTV (opens in a new tab), KUTV, November 16, 2021, local outlet
  12. Meta to Expand Eagle Mountain Data Center Project - W.Media (opens in a new tab), W.Media, October 3, 2022, news outlet
8 more sources
  1. Turner halts work at $1.5B Meta site for recurring racist graffiti - Construction Dive (opens in a new tab), Construction Dive, September 22, 2022, news outlet
  2. Meta announces data center expansion, new community investments in Eagle Mountain (opens in a new tab), KSL, September 15, 2026, local outlet
  3. Meta plans Eagle Mountain data center expansion, $2.5M community investment - KUTV (opens in a new tab), KUTV, September 14, 2026, local outlet
  4. Meta Provides Crucial Investment Insights into its $3bn+ Eagle Mountain Data Center in Utah - Construction Review (opens in a new tab), Construction Review, September 15, 2026, news outlet
  5. Meta announces data center expansion, new community investments in Eagle Mountain - ksl.com (opens in a new tab), ksl.com, September 15, 2026, local outlet
  6. Deepening Our Investment in Eagle Mountain, Utah - Meta Data Centers (opens in a new tab), Meta Data Centers, September 15, 2026, news outlet
  7. Can a data center company actually be a good neighbor? - Utah Business (opens in a new tab), Utah Business, September 15, 2026, local outlet
  8. Meta to expand Eagle Mountain Data Center, announces more than $1 million in community investments - ABC4 Utah (opens in a new tab), ABC4 Utah, September 14, 2026, local outlet

25 sources on file.

Regional grid context

This site is in the Northwest Power Pool (NWPP) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Meta Eagle Mountain Data Center", https://datacenterrecord.org/projects/meta-eagle-mountain-data-center-ut, last verified October 26, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Meta Eagle Mountain Data Center", https://datacenterrecord.org/projects/meta-eagle-mountain-data-center-ut. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Running
Tier
reviewed in depth
Tags
Reviewed in depth
Coordinates
40.28914, -112.01246
How the location is known
Location from the site's street address.
Location source
EPA ECHO Detailed Facility Report 110071310579 (1499 North Pioneer Parkway, Eagle Mountain, UT 84005) and Meta Eagle Mountain Data Center fact sheet.
Coordinate source
Utah County Assessor parcel at 2000 N. Pony Express Parkway, Eagle Mountain
Location source number
[4]
Location last verified
October 23, 2026
How acreage was disclosed
the developer's figure
Published
September 14, 2026
Last verified
October 26, 2026
Not disclosed
EPA registry id, Uses, Tenancy, Cooling, How capacity was disclosed, How water was disclosed, Interconnection, Capacity, if disclosed, Rating of the county's rows

Researcher view · Meta Eagle Mountain Data Center · 25 sources, 30 entries · basis and source tier on every row · verified October 26, 2026

Download CSV JSON