● Running Announced May 8, 2023 · 1 Building · Novva Data Centers

Novva Data Centers Tahoe Reno Campus

Street address 3399 Peru Dr, Sparks, NV 89437, Storey County permit coordinates Exact, the point of the EPA's facility record [1] echo.epa.gov

Overview, regulatory gates and specifications

Novva Data Centers lists a data center at Reno, Nevada among the sites it operates. [3] Filings on the record specify disclosed capacity of 60 MW (the developer's figure), 1 planned or operational building. [3] Novva Data Centers lists Novva Tahoe Reno data center at Reno, Nevada on its own page of data center locations, read September 14, 2026. [2]

1. Land & Parcel
Parcel located
2. Local Zoning
Zoning approved
3. Tax & EDA Deal
Not yet on file
4. Utility Grid Queue
Energized
5. Air & Water Permits
EPA air permit on file
What happens next: Facility is operational; air permit compliance, water reporting and utility filings are monitored.
Electricity Demand [1]
60 MW
the developer's figure

Equivalent to ~49,800 U.S. homes (U.S. EIA 830 homes/MW baseline) · 2.9% of Hoover Dam nameplate capacity (2,080 MW).

Grid interconnection and utility service tracked on file.

Cooling & Water
Not disclosed
Daily water volume not stated in public filings

U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.

No local property tax abatement amount disclosed in public filings.

Site & Buildings [1]
1 building
operator page

Assessor parcel acreage and building square footage are added when municipal or county filings are published.

Location: 3399 Peru Dr, Sparks, NV 89437.

Taxes & Permanent Jobs
Not disclosed
Tax and job figures not yet on file

State and local tax abatement agreements and permanent job commitments are recorded when filed.

No local property tax abatement amount disclosed in public filings.

Key specifications on the record

Power capacity
60 MW developer figure Equivalent to the continuous electricity demand of about 49,800 average U.S. homes based on U.S. Energy Information Administration residential consumption data. About 0.6 percent of New York City's summer peak demand in 2024.
novva.com (opens in a new tab)
Water usage
Not disclosed
Land area
Not disclosed
Buildings
1 building operator page
novva.com (opens in a new tab)
Backup generators
Not disclosed
Capital investment
Not disclosed
Commissioned
Operational since 2023 (3 years)
Who leads it
Novva Data Centers as stated by the source
Official project website
novva.com (opens in a new tab) verified October 28, 2026
novva.com (opens in a new tab)
Archived promotional websites
novva.com (opens in a new tab) [Wayback snapshot] (opens in a new tab) preserved in Internet Archive
tracked domains
Not disclosed
Who would use it, Jobs once it runs, Tax each year
The math behind the comparison
  1. Novva Data Centers Tahoe Reno Campus, capacity: 60 MW.
  2. New York City (NYISO Zone J) summer peak demand, actual, 2024: 10,245 MW (2024).
  3. 60 ÷ 10,245 = 0.0059 (MW over MW).

Sources:

A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: Novva Data Centers
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for Novva Data Centers Tahoe Reno Campus.

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW) 60 MW 60 MW the developer's figure
Site Footprint (Acres)
Data Hall Buildings 1 building 1 operator page
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Hearings and statements on the record

November 21, 2019 Sparks, NV Coreweave CEO: Regulations on data centers will not reduce demand Storey County Board of Commissioners 3 clips

Storey County Board of Commissioners and Tahoe Reno Industrial Center public record on tax abatements, water rights, and power infrastructure for Switch and Google campuses (November 21, 2019).

  1. CNBC Television Broadcast Report Broadcast Report transcribed from local broadcast report
    "regulations that are being brought out of around data centers, all they are going to do is they're going to relocate the infrastructure. They are not going to in any way reduce the demand. The market is looking for more infrastructure because there are companies that are building and extracting value from building this infrastructure and it's just a question of where you put it, not nothing more than that."
  2. CNBC Television Broadcast Report Broadcast Report transcribed from local broadcast report
    "infrastructure. They are not going to in any way reduce the demand. The market is looking for more infrastructure because there are companies that are building and extracting value from building this infrastructure and it's just a question of where you put it, not nothing more than that."
  3. Resident public comment Resident Public Comment transcribed from local broadcast report
    "and extracting value from building this infrastructure and it's just a question of where you put it, not nothing more than that."
Said and filed

Said and filed

Statements and filings, side by side

Column A · Dated Statement
Hillary Schieve & Reno City Council Mayor, City of Reno & Reno City Council
Venue: Reno City Council Hearing on Centra Keystone Data Center
"Reviewed by right industrial zoning and permit filings for the Centra Keystone data center in Reno alongside technical testimony and air dispersion modeling showing diesel backup generator plumes trapped by Washoe County basin terrain."
City of Reno (Official)
Column B · Subsequent Recorded Position
Reno City Council Special Meeting Resolution Adopting Item C1 Temporary Data Center Moratorium
Reno City Council Item C1 · Temporary Data Center Moratorium Resolution (June 1, 2026)
Agency or Venue: Reno City Council
"Eighteen days after the Centra Keystone hearing, Mayor Hillary Schieve and Reno City Council convened a special meeting on June 1, 2026 and adopted Item C1 establishing a temporary moratorium on accepting new data center applications while staff drafts zoning text amendments governing power, water, and backup generators."
City of Reno (Official)

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

  1. (source date; the content gives no date of its own)

    Novva Data Centers finished a 60 megawatt Nevada project

    [6] crn.com

  2. (source date; the content gives no date of its own)

    Novva brings online 60MW Nevada data center

    [5] commercialsearch.com

  3. (source date; the content gives no date of its own)

    Novva data center near Reno completed

    [9] rgj.com

  4. (source date; the content gives no date of its own)

    Novva opens 300,000 square foot data center in Storey County

    [3] 2news.com

  5. (source date; the content gives no date of its own)

    Novva Data Centers announces new data center at TRIC

    [4] nnbw.com

  6. (source date; the content gives no date of its own)

    Novva Tahoe Reno data center will feature robotic dog security

    [7] rgj.com

  7. (source date; the content gives no date of its own)

    Novva Tahoe Reno data center will feature six large data halls

    [7] rgj.com

  8. · Status: running (source date; the content gives no date of its own)

    Novva announces new data center in Tahoe Reno region

    [8] prnewswire.com

Every event in order

  • Read on September 14, 2026 (the day the page was read; it gives no date of its own)

    Novva Data Centers lists Novva Tahoe Reno data center at Reno, Nevada on its own page of data center locations, read September 14, 2026.

    [2] novva.com

2 corrections to this record

Every correction, with its reason
  1. · City

    Postal mailing address city is not a Census place in Storey County; filed at the county level per place-geoid-fixes-1016.

Every correction on the record is on the corrections page.

Nearest data centers in Nevada

Verified data center records in Nevada within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
Google Storey County Data Center (Tahoe Reno Industrial Center) Storey County Less than 1 mi Running Google 200 MW
Switch Citadel Campus (Tahoe Reno McCarran) McCarran, Storey County Less than 1 mi Running Switch 1 building
Vantage Data Centers Nevada (NV1 Campus) Storey County Less than 1 mi Running Vantage Data Centers 224 MW
SV RNO Property Owner 1 Storey County Data Center McCarran, Storey County ~1 mi Proposed SV RNO Property Owner 1 LLC
Switch The Citadel Campus (Tahoe Reno) Storey County 1 mi Running Switch Inc. 650 MW
PR TX 1 Storey County Data Center McCarran, Storey County ~1 mi Proposed PR TX 1, LLC

Blank cell: not disclosed by any source on file.

Common questions about Novva Data Centers Tahoe Reno Campus

Answered directly from the verified filings and local actions on this page.

Who is building Novva Data Centers Tahoe Reno Campus?

Novva Data Centers is the developer. No construction contractor is named on the record yet.

How much power and water does Novva Data Centers Tahoe Reno Campus say it needs?

Power: 60 MW (the developer's figure, novva.com (opens in a new tab)). Water: not disclosed by any source on file.

Where does Novva Data Centers Tahoe Reno Campus stand today?

It is running, as reported May 8, 2023. The newest entry, reported July 10, 2025: Novva Data Centers finished a 60 megawatt Nevada project [6].

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Tracked project domains

Promotional domains, campaign sites, and municipal portals preserved through the Internet Archive.

Primary documents

  1. US EPA ECHO Detailed Facility Report: Novva Data Centers Sparks (FRS 110072127602) (opens in a new tab), US Environmental Protection Agency
  2. Novva Data Centers: Locations (opens in a new tab), Novva Data Centers, September 14, 2026

Reporting

  1. Novva opens 300,000 square foot data center in Nevada's tech corridor in Storey County - KTVN (opens in a new tab), KTVN, July 8, 2025, local outlet
  2. Novva Data Centers announces new data center at TRIC - Northern Nevada Business Weekly (opens in a new tab), Northern Nevada Business Weekly, May 16, 2023, local outlet
  3. Novva Brings Online 60MW Nevada Data Center - commercialsearch.com (opens in a new tab), commercialsearch.com, July 10, 2025, news outlet
  4. Novva Data Centers Finishes 60 Megawatt Nevada Project - crn.com (opens in a new tab), crn.com, July 10, 2025, news outlet
  5. New Novva Tahoe Reno data center will feature robotic dog security, 6 large data halls - Reno Gazette Journal (opens in a new tab), Reno Gazette Journal, May 9, 2023, news outlet
  6. Novva Data Centers Announces New Data Center in Tahoe Reno Region as Company's Western U.S. Expansion Continues - PR Newswire (opens in a new tab), PR Newswire, May 8, 2023, press release
  7. Novva data center with robot dog guard, drone monitoring completed near Reno - Reno Gazette Journal (opens in a new tab), Reno Gazette Journal, July 9, 2025, news outlet

9 sources on file.

Regional grid context

This site is in the Northwest Power Pool (NWPP) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Novva Data Centers Tahoe Reno Campus", https://datacenterrecord.org/projects/novva-tahoe-reno-data-center-nv, last verified October 26, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Novva Data Centers Tahoe Reno Campus", https://datacenterrecord.org/projects/novva-tahoe-reno-data-center-nv. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Running
Tier
built from one source
Tags
Built from one source
Coordinates
39.53827, -119.45735
How the location is known
Location from an EPA facility record.
Location source
https://echo.epa.gov/detailed-facility-report?fid=110072127602
Coordinate source
EPA ECHO Detailed Facility Report 110072127602 and Novva Tahoe Reno campus specification
Location last verified
September 14, 2026
How capacity was disclosed
the developer's figure
Capacity, if disclosed
60 MW, the developer's figure
Published
September 14, 2026
Last verified
October 26, 2026
Not disclosed
Location source number, EPA registry id, Uses, Tenancy, Cooling, How water was disclosed, How acreage was disclosed, Interconnection, Rating of the county's rows

Researcher view · Novva Data Centers Tahoe Reno Campus · 9 sources, 9 entries · basis and source tier on every row · verified October 26, 2026