Census GEOID: 32029 Location Precision: verified address Jump to Entity & Permit Table Commercial & Bulk Data (CC BY-NC 4.0)

Last verified: · 3 primary and 1 reporting sources

● Running First recorded September 14, 2026 · 4 Buildings

Vantage Data Centers Nevada (NV1 Campus)

Street address 2000 Electric Ave, Sparks, NV 89434, Storey County verified address Exact, at the address [2] Vantage Data Centers: Vantage Reno

Overview, regulatory gates and specifications

Vantage Data Centers lists a data center at Reno, Nevada among the sites it operates. [1] Filings on the record specify disclosed capacity of 224 MW (the developer's figure), 4 planned or operational buildings. [2] Vantage Data Centers lists Vantage Reno at Reno, Nevada on its own page of data center locations, read September 14, 2026. [2]

1. Land & Parcel
Parcel located
2. Local Zoning
Zoning approved
3. Tax & EDA Deal
Not yet on file
4. Utility Grid Queue
Energized
5. Air & Water Permits
Nevada GOED NRS 360.754 Data
What happens next: Facility is operational; air permit compliance, water reporting and utility filings are monitored.
Electricity Demand [2]
224 MW
the developer's figure

Equivalent to ~185,920 U.S. homes (U.S. EIA 830 homes/MW baseline) · 11% of Hoover Dam nameplate capacity (2,080 MW).

Grid interconnection and utility service tracked on file.

Cooling & Water
Not disclosed
Daily water volume not stated in public filings

U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.

No local property tax abatement amount disclosed in public filings.

Site & Buildings [2]
4 buildings
operator page

Assessor parcel acreage and building square footage are added when municipal or county filings are published.

Location: 2000 Electric Ave, Sparks, NV 89434.

Taxes & Permanent Jobs
Not disclosed
Tax and job figures not yet on file

State and local tax abatement agreements and permanent job commitments are recorded when filed.

No local property tax abatement amount disclosed in public filings.

Key specifications on the record

Power capacity
224 MW developer figure Equivalent to the continuous electricity demand of about 185,900 average U.S. homes based on U.S. Energy Information Administration residential consumption data. About 2 percent of New York City's summer peak demand in 2024.
[2] vantage-dc.com
Water usage
Not disclosed
Land area
Not disclosed
Buildings
4 buildings operator page
[2] vantage-dc.com
Backup generators
Not disclosed
Capital investment
Not disclosed
Commissioned
Operational since 2021 (5 years)
Who leads it
Vantage Data Centers as stated by the source
Permitted legal entity
Vantage Data Centers NV11, LLC what a permit allows
[2] vantage-dc.com
State permit status
Nevada GOED NRS 360.754 Data Center Tax Abatement (March 21, 2024, Vantage Data Centers NV11, LLC) the state's permit register, as of March 21, 2024, last verified November 6, 2026
[3] goed.nv.gov
Official project website
vantage-dc.com (opens in a new tab) verified October 28, 2026
vantage-dc.com (opens in a new tab)
Archived promotional websites
vantage-dc.com (opens in a new tab) [Wayback snapshot] (opens in a new tab) preserved in Internet Archive
tracked domains
Not disclosed
Who would use it, Jobs once it runs, Tax each year
The math behind the comparison
  1. Vantage Data Centers Nevada (NV1 Campus), capacity: 224 MW.
  2. New York City (NYISO Zone J) summer peak demand, actual, 2024: 10,245 MW (2024).
  3. 224 ÷ 10,245 = 0.02 (MW over MW).

Sources:

A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: Vantage Data Centers · Applicant / Shell LLC: Vantage Data Centers NV11, LLC
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for Vantage Data Centers Nevada (NV1 Campus).

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW) 224 MW 224 MW the developer's figure [2] vantage-dc.com
Site Footprint (Acres)
Data Hall Buildings 4 buildings 4 operator page [2] vantage-dc.com
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Hearings and statements on the record

November 21, 2019 Sparks, NV Coreweave CEO: Regulations on data centers will not reduce demand Storey County Board of Commissioners 3 clips

Storey County Board of Commissioners and Tahoe Reno Industrial Center public record on tax abatements, water rights, and power infrastructure for Switch and Google campuses (November 21, 2019).

  1. CNBC Television Broadcast Report Broadcast Report transcribed from local broadcast report
    "regulations that are being brought out of around data centers, all they are going to do is they're going to relocate the infrastructure. They are not going to in any way reduce the demand. The market is looking for more infrastructure because there are companies that are building and extracting value from building this infrastructure and it's just a question of where you put it, not nothing more than that."
  2. CNBC Television Broadcast Report Broadcast Report transcribed from local broadcast report
    "infrastructure. They are not going to in any way reduce the demand. The market is looking for more infrastructure because there are companies that are building and extracting value from building this infrastructure and it's just a question of where you put it, not nothing more than that."
  3. Resident public comment Resident Public Comment transcribed from local broadcast report
    "and extracting value from building this infrastructure and it's just a question of where you put it, not nothing more than that."
Said and filed

Said and filed

Statements and filings, side by side

Column A · Dated Statement
Hillary Schieve & Reno City Council Mayor, City of Reno & Reno City Council
Venue: Reno City Council Hearing on Centra Keystone Data Center
"Reviewed by right industrial zoning and permit filings for the Centra Keystone data center in Reno alongside technical testimony and air dispersion modeling showing diesel backup generator plumes trapped by Washoe County basin terrain."
City of Reno (Official)
Column B · Subsequent Recorded Position
Reno City Council Special Meeting Resolution Adopting Item C1 Temporary Data Center Moratorium
Reno City Council Item C1 · Temporary Data Center Moratorium Resolution (June 1, 2026)
Agency or Venue: Reno City Council
"Eighteen days after the Centra Keystone hearing, Mayor Hillary Schieve and Reno City Council convened a special meeting on June 1, 2026 and adopted Item C1 establishing a temporary moratorium on accepting new data center applications while staff drafts zoning text amendments governing power, water, and backup generators."
City of Reno (Official)

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

No dated entry is on the record yet.

Every event in order

  • Read on September 14, 2026 (the day the page was read; it gives no date of its own)

    Vantage Data Centers lists Vantage Reno at Reno, Nevada on its own page of data center locations, read September 14, 2026.

    [2] vantage-dc.com

1 correction to this record

Every correction, with its reason
  1. · City

    Postal mailing address city is not a Census place in Storey County; filed at the county level per place-geoid-fixes-1016.

Every correction on the record is on the corrections page.

Nearest data centers in Nevada

Verified data center records in Nevada within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
SV RNO Property Owner 1 Storey County Data Center McCarran, Storey County Less than 1 mi Proposed SV RNO Property Owner 1 LLC
PR TX 1 Storey County Data Center McCarran, Storey County Less than 1 mi Proposed PR TX 1, LLC
Switch Citadel Campus (Tahoe Reno McCarran) McCarran, Storey County Less than 1 mi Running Switch 1 building
Google Storey County Data Center (Tahoe Reno Industrial Center) Storey County Less than 1 mi Running Google 200 MW
Switch The Citadel Campus (Tahoe Reno) Storey County Less than 1 mi Running Switch Inc. 650 MW
EdgeCore Reno Data Center Campus (RN01) Storey County Less than 1 mi Being built EdgeCore Digital Infrastructure 216 MW

Blank cell: not disclosed by any source on file.

Common questions about Vantage Data Centers Nevada (NV1 Campus)

Answered directly from the verified filings and local actions on this page.

Who is building Vantage Data Centers Nevada (NV1 Campus)?

Vantage Data Centers is the developer. No construction contractor is named on the record yet.

How much power and water does Vantage Data Centers Nevada (NV1 Campus) say it needs?

Power: 224 MW (the developer's figure, vantage-dc.com (opens in a new tab)). Water: not disclosed by any source on file.

Where does Vantage Data Centers Nevada (NV1 Campus) stand today?

It is running; the date it reached that stage is not sourced, only the day a page was read. No dated entry is on the record yet.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Tracked project domains

Promotional domains, campaign sites, and municipal portals preserved through the Internet Archive.

Primary documents

  1. Vantage Data Centers: Data center locations (opens in a new tab), Vantage Data Centers, September 14, 2026
  2. Vantage Data Centers: Vantage Reno (opens in a new tab), Vantage Data Centers, September 14, 2026
  3. Nevada GOED Board Agenda (March 21, 2024) - Vantage Data Centers NV11, LLC Tax Abatement (opens in a new tab), Nevada Governor's Office of Economic Development, March 21, 2024

Reporting

  1. Vantage Building $3B Reno-Area Data Center - Connect CRE (opens in a new tab), Connect CRE, July 17, 2025, news outlet

4 sources on file.

Regional grid context

This site is in the Northwest Power Pool (NWPP) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Vantage Data Centers Nevada (NV1 Campus)", https://datacenterrecord.org/projects/vantage-reno-nv, last verified November 6, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Vantage Data Centers Nevada (NV1 Campus)", https://datacenterrecord.org/projects/vantage-reno-nv. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Running
Tier
built from one source
Tags
Built from one source
Coordinates
39.5462, -119.4685
How the location is known
Location from the site's street address.
Location source
https://vantage-dc.com/data-center-locations/north-america/reno-nevada/
Coordinate source
Vantage Data Centers Nevada (NV1, Tahoe Reno Industrial Center) specification
Location last verified
September 14, 2026
How capacity was disclosed
the developer's figure
Capacity, if disclosed
224 MW, the developer's figure
Published
September 14, 2026
Last verified
November 6, 2026
Not disclosed
Location source number, EPA registry id, Uses, Tenancy, Cooling, How water was disclosed, How acreage was disclosed, Interconnection, Rating of the county's rows

Researcher view · Vantage Data Centers Nevada (NV1 Campus) · 4 sources, 1 entry · basis and source tier on every row · verified November 6, 2026

Download CSV JSON