● Being Built Announced October 26, 2026 · 2 Buildings · EdgeCore Digital Infrastructure

EdgeCore Reno Data Center Campus (RN01)

Street address 675 Milan Dr, Sparks, NV 89437, Storey County verified address Exact, at the address [1] edgecore.com

Overview, regulatory gates and specifications

EdgeCore Digital Infrastructure lists EdgeCore Reno 1 at 3000 USA Parkway, McCarran, NV on its interconnection and facility directory. [1] Filings on the record specify disclosed capacity of 216 MW (the developer's figure), 2 planned or operational buildings. [1] Verified facility status from Nevada GOED Data Center Tax Abatement filings, NDEP air quality permits, or operator campus specifications. [1]

1. Land & Parcel
Parcel located
2. Local Zoning
Zoning approved
3. Tax & EDA Deal
Incentive review
4. Utility Grid Queue
216 MW disclosed
5. Air & Water Permits
Not yet on file
What happens next: Campus is under construction; building inspections, utility energization and air permits are monitored.
Electricity Demand [1]
216 MW
the developer's figure

Equivalent to ~179,280 U.S. homes (U.S. EIA 830 homes/MW baseline) · 10% of Hoover Dam nameplate capacity (2,080 MW).

Grid interconnection and utility service tracked on file.

Cooling & Water
Not disclosed
Daily water volume not stated in public filings

U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.

No local property tax abatement amount disclosed in public filings.

Site & Buildings [1]
2 buildings
operator page

Assessor parcel acreage and building square footage are added when municipal or county filings are published.

Location: 675 Milan Dr, Sparks, NV 89437.

Taxes & Permanent Jobs
Not disclosed
Tax and job figures not yet on file

State and local tax abatement agreements and permanent job commitments are recorded when filed.

No local property tax abatement amount disclosed in public filings.

Key specifications on the record

Power capacity
216 MW developer figure Equivalent to the continuous electricity demand of about 179,300 average U.S. homes based on U.S. Energy Information Administration residential consumption data. About 2 percent of New York City's summer peak demand in 2024.
[1] edgecore.com
Water usage
Not disclosed
Land area
Not disclosed
Buildings
2 buildings operator page
[1] edgecore.com
Backup generators
Not disclosed
Capital investment
Not disclosed
Who leads it
EdgeCore Digital Infrastructure as stated by the source
Not disclosed
Who would use it, Jobs once it runs, Tax each year
The math behind the comparison
  1. EdgeCore Reno Data Center Campus (RN01), capacity: 216 MW.
  2. New York City (NYISO Zone J) summer peak demand, actual, 2024: 10,245 MW (2024).
  3. 216 ÷ 10,245 = 0.02 (MW over MW).

Sources:

A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: EdgeCore Digital Infrastructure
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for EdgeCore Reno Data Center Campus (RN01).

Field / Parameter Permitted / Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW) 216 MW the developer's figure [1] edgecore.com
Site Footprint (Acres)
Data Hall Buildings 2 buildings operator page [1] edgecore.com
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

What was decided

Acts of Storey County and the cities in it about data centers, on the record with their source. A rule about the area is not a decision about this record.

DateWhoDecisionSource
Storey County Nevada Public Utilities Commission approved two temporary natural gas fired power projects totaling 362 MW in Storey County for data centers news.constructconnect.com (opens in a new tab)

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

No dated entry is on the record yet.

Every event in order

  • Read on October 26, 2026 (the day the page was read; it gives no date of its own)

    Verified facility status from Nevada GOED Data Center Tax Abatement filings, NDEP air quality permits, or operator campus specifications.

    [1] edgecore.com

1 correction to this record

Every correction, with its reason
  1. · City

    Postal mailing address city is not a Census place in Storey County; filed at the county level per place-geoid-fixes-1016.

Every correction on the record is on the corrections page.

Nearest data centers in Nevada

Verified data center records in Nevada within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
PR TX 1 Storey County Data Center McCarran, Storey County Less than 1 mi Proposed PR TX 1, LLC
SV RNO Property Owner 1 Storey County Data Center McCarran, Storey County Less than 1 mi Proposed SV RNO Property Owner 1 LLC
Vantage Data Centers Nevada (NV1 Campus) Storey County Less than 1 mi Running Vantage Data Centers 224 MW
Switch The Citadel Campus (Tahoe Reno) Storey County Less than 1 mi Running Switch Inc. 650 MW
Switch Citadel Campus (Tahoe Reno McCarran) McCarran, Storey County Less than 1 mi Running Switch 1 building
Google Storey County Data Center (Tahoe Reno Industrial Center) Storey County 1 mi Running Google 200 MW

Blank cell: not disclosed by any source on file.

Common questions about EdgeCore Reno Data Center Campus (RN01)

Answered directly from the verified filings and local actions on this page.

Who is building EdgeCore Reno Data Center Campus (RN01)?

EdgeCore Digital Infrastructure is the developer. No construction contractor is named on the record yet.

How much power and water does EdgeCore Reno Data Center Campus (RN01) say it needs?

Power: 216 MW (the developer's figure, edgecore.com (opens in a new tab)). Water: not disclosed by any source on file.

Where does EdgeCore Reno Data Center Campus (RN01) stand today?

It is being built; the date it reached that stage is not sourced, only the day a page was read. No dated entry is on the record yet.

What has Storey County decided about it?

Storey County: Nevada Public Utilities Commission approved two temporary natural gas fired power projects totaling 362 MW in Storey County for data centers (reported September 21, 2026, news.constructconnect.com (opens in a new tab)). 1 event is on the county's rows; a rule about the area is not a decision about this record.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Reporting

  1. EdgeCore Digital Infrastructure: Reno Data Center Campus (RN01) Specification (opens in a new tab), EdgeCore Digital Infrastructure, news outlet

1 source on file.

Regional grid context

This site is in the Northwest Power Pool (NWPP) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "EdgeCore Reno Data Center Campus (RN01)", https://datacenterrecord.org/projects/edgecore-reno-1-mccarran-nv, last verified October 26, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "EdgeCore Reno Data Center Campus (RN01)", https://datacenterrecord.org/projects/edgecore-reno-1-mccarran-nv. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Being built
Tier
built from one source
Tags
Built from one source
Coordinates
39.552905, -119.476926
How the location is known
Location from the site's street address.
Location source
https://edgecore.com/locations/reno/
Coordinate source
EdgeCore Reno Campus (675 Milan Dr, Tahoe Reno Industrial Center) specification
How capacity was disclosed
the developer's figure
Capacity, if disclosed
216 MW, the developer's figure
Published
October 21, 2026
Last verified
October 26, 2026
Not disclosed
Location source number, Location last verified, EPA registry id, Uses, Tenancy, Cooling, How water was disclosed, How acreage was disclosed, Interconnection, Rating of the county's rows

Researcher view · EdgeCore Reno Data Center Campus (RN01) · 1 source, 1 entry, 1 decision nearby · basis and source tier on every row · verified October 26, 2026

Download CSV JSON