EdgeCore Digital Infrastructure lists EdgeCore Reno 1 at 3000 USA Parkway, McCarran, NV on its interconnection and facility directory. [1] Filings on the record specify disclosed capacity of 216 MW (the developer's figure), 2 planned or operational buildings. [1] Verified facility status from Nevada GOED Data Center Tax Abatement filings, NDEP air quality permits, or operator campus specifications. [1]
Equivalent to ~179,280 U.S. homes (U.S. EIA 830 homes/MW baseline) · 10% of Hoover Dam nameplate capacity (2,080 MW).
Grid interconnection and utility service tracked on file.
U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.
No local property tax abatement amount disclosed in public filings.
Assessor parcel acreage and building square footage are added when municipal or county filings are published.
Location: 675 Milan Dr, Sparks, NV 89437.
State and local tax abatement agreements and permanent job commitments are recorded when filed.
No local property tax abatement amount disclosed in public filings.
Sources:
A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).
Connected government officials, corporate entities, utilities and local rules on the public record.
Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.
Disclosed engineering ceilings, reported actuals and primary regulatory basis for EdgeCore Reno Data Center Campus (RN01).
| Field / Parameter | Permitted / Disclosed Ceiling | Reported Actual | Basis & Primary Source |
|---|---|---|---|
| Electrical Capacity (MW) | 216 MW | the developer's figure [1] edgecore.com | |
| Site Footprint (Acres) | |||
| Data Hall Buildings | 2 buildings | operator page [1] edgecore.com | |
| Cooling & Water System | |||
| Backup Diesel / Gas Generators | |||
| Tax Abatement & Annual Revenue |
Blank cell: not disclosed by any source on file.
The record adds each the day a source gives it. Why these documents.
Acts of Storey County and the cities in it about data centers, on the record with their source. A rule about the area is not a decision about this record.
| Date | Who | Decision | Source |
|---|---|---|---|
| Storey County | Nevada Public Utilities Commission approved two temporary natural gas fired power projects totaling 362 MW in Storey County for data centers | news.constructconnect.com (opens in a new tab) |
Chronological regulatory, corporate and permitting events on the record, newest first.
No dated entry is on the record yet.
Read on October 26, 2026 (the day the page was read; it gives no date of its own)
Verified facility status from Nevada GOED Data Center Tax Abatement filings, NDEP air quality permits, or operator campus specifications.
· City
Postal mailing address city is not a Census place in Storey County; filed at the county level per place-geoid-fixes-1016.
Every correction on the record is on the corrections page.
Verified data center records in Nevada within 60 miles by straight line distance.
| Facility & Location | Distance | Stage | Operator / Tenant | Disclosed Scale |
|---|---|---|---|---|
| PR TX 1 Storey County Data Center McCarran, Storey County | Less than 1 mi | Proposed | PR TX 1, LLC | |
| SV RNO Property Owner 1 Storey County Data Center McCarran, Storey County | Less than 1 mi | Proposed | SV RNO Property Owner 1 LLC | |
| Vantage Data Centers Nevada (NV1 Campus) Storey County | Less than 1 mi | Running | Vantage Data Centers | 224 MW |
| Switch The Citadel Campus (Tahoe Reno) Storey County | Less than 1 mi | Running | Switch Inc. | 650 MW |
| Switch Citadel Campus (Tahoe Reno McCarran) McCarran, Storey County | Less than 1 mi | Running | Switch | 1 building |
| Google Storey County Data Center (Tahoe Reno Industrial Center) Storey County | 1 mi | Running | 200 MW |
Blank cell: not disclosed by any source on file.
Answered directly from the verified filings and local actions on this page.
EdgeCore Digital Infrastructure is the developer. No construction contractor is named on the record yet.
Power: 216 MW (the developer's figure, edgecore.com (opens in a new tab)). Water: not disclosed by any source on file.
It is being built; the date it reached that stage is not sourced, only the day a page was read. No dated entry is on the record yet.
Storey County: Nevada Public Utilities Commission approved two temporary natural gas fired power projects totaling 362 MW in Storey County for data centers (reported September 21, 2026, news.constructconnect.com (opens in a new tab)). 1 event is on the county's rows; a rule about the area is not a decision about this record.
1 source on file.
This site is in the Northwest Power Pool (NWPP) regional power market.
Every number on this page comes from a named source. Click any source to open the document in a new tab.
If a link has moved or a document has changed, let us know and we will update the record and log the change.
Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.
Data Center Record. EdgeCore Reno Data Center Campus (RN01). Last verified October 26, 2026. https://datacenterrecord.org/projects/edgecore-reno-1-mccarran-nv. Accessed November 17, 2026.
Every row on this page is available to download with its source, its basis and the date it was last verified.
Download this page's records (CSV) JSON
Licensed CC BY-NC 4.0. Say where it came from and do not sell it or use it to train a commercial model without a license.
Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.
Data Center Record takes no money from data center developers, operators, utilities or trade groups. That rule does not change for licensing.
Data Center Record is an independent project and takes no money from data center developers, operators, utilities or trade groups. Reader support keeps the record free to read, with no ads and no paywall.
Last verified , first recorded . Every correction is logged on the corrections page and under What happened. Report a correction · Send a tip about EdgeCore Reno Data Center Campus (RN01)
Data Center Record, "EdgeCore Reno Data Center Campus (RN01)", https://datacenterrecord.org/projects/edgecore-reno-1-mccarran-nv. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.
The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.