Piedmont Area Data Center
A proposed data center in the Piedmont area has a zoning decision pending, with residents petitioning against it and the developer securing an alternate site option. It is reported, as reported August 24, 2026.
How much power it needs, how much water it would use and who would use it have not been disclosed.
How to read this page. Every fact links to the source it rests on; a number in brackets is its place in the source list. A figure no source gives reads Not disclosed, and nothing is estimated. Where sources give different figures, each is shown with who gave it, and another source's figure never stands in for the record's own. Entries are added and never overwritten; corrections are listed under What happened.
What is known
Each figure as its source gave it. The number in brackets is its place in the source list.
- Land
- 337 acres
- third party estimate [3]
- Power it would draw
- Not disclosed
- Water
- Not disclosed
- Who leads it
- Not disclosed
- Who would use it
- Not disclosed
- Jobs once it runs
- Not disclosed
- Tax each year
- Not disclosed
Every field, with who said it and when (Researcher view)
Impact figures
| Field | Value | Who says so | Source | Last verified |
|---|---|---|---|---|
| How much power it needs | Not disclosed | |||
| How much water it would use | Not disclosed | |||
| How loud it would be | Not disclosed | |||
| Jobs once it runs | Not disclosed | |||
| Tax it would pay each year | Not disclosed |
The record's fields
| Field | Value | Who says so | Source | Last verified |
|---|---|---|---|---|
| Who is building it | Not disclosed | |||
| Who is constructing it | Not disclosed | |||
| How much land | 337 acres | third party estimate | [3] news9.com | September 25, 2026 |
| Where its power comes from | Not disclosed | |||
| Grid connection | Not disclosed | |||
| How it is cooled | Not disclosed |
The developer's figure is what the company said; what a permit allows is the ceiling a permit sets; measured means observed. Water is in gallons a day or a year, whichever the source stated; a tax claim given as a range shows both ends, each linked to the source that gave it.
Still not public, and where it would show up
The record adds each the day a source gives it. Why these documents.
- Water useA state water right filing or a water supply agreement.
- Who would use itA lease announcement or a tenant named in a filing.
- Power the campus would drawA utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
- Who is behind itA land record, a zoning application or a company's own announcement.
- Jobs and taxAn incentive agreement, a county's economic development filing or a fiscal note.
What happened
-
(source date; the content gives no date of its own)
Cloverleaf will comply with Piedmont noise standards and use closed loop cooling system [3]
-
(source date; the content gives no date of its own)
Project Open Sky planned as multi building data center campus with power generation uses [3]
-
(source date; the content gives no date of its own)
Cloverleaf has secured rights to purchase more than 300 acres in Kingfisher County adjacent to original site [2]
-
· Status: rumored (source date; the content gives no date of its own)
Cloverleaf hopes to build data center on about 1000 acres near Piedmont [2]
The full Piedmont Area Data Center timeline, in order
4 corrections to this record
Every correction, with its reason
-
· the kind of source of a history entry
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of 2026-09-23). The link did not change. The day's label corrections.
-
· the kind of source of a history entry
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of 2026-09-23). The link did not change. The day's label corrections.
-
· the kind of source of a history entry
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of 2026-09-23). The link did not change. The day's label corrections.
-
· the kind of source of a history entry
Tier after resolution (2026-09-21). The source on file is thecooldown.com, the publisher's own page. The item reached the record through Google News: "data center" Oklahoma, which the record carries at tier 1, and the approve copied the feed's tier onto this row. The tier now comes from the outlet, which the record already carries at tier 4 on 2 rows of sources. DECISIONS section 7. The speaker, the claim, the date and the url are unchanged. The day's label corrections.
Every correction on the record is on the corrections page.
What was said
Citizen led petitions pushing back against data centers in the area
The site
Where in Canadian County is not in the public record. The pin marks the county seat, not a building, and the outline is the county.
Tap a pin for the data center, the parcel for its record
- This record: Proposed, ringed
- data center
- Dashed edge: the exact site is not in the public record
- Smaller pins: 13 other published records in Oklahoma
Details
- this record's location, ringed
- parcel outline, from the county parcel record
- city limits, U.S. Census Bureau, on a town level record
- county boundary
The other pins are the published projects in the same state, each in its stage color. The imagery beneath is the USGS national orthoimagery, public domain, shown so the land around the site can be read.
- Where
- Piedmont, Canadian County, Oklahoma
- How exactly it is located
- County level, the county seat
- The parcel
- No parcel outline in the public record
- Nearest homes
- Not computed for a record placed at a place center
- Nearest records
- Nearest records are not computed for a record placed at a county seat.
Questions about this project
5 questions answered from the record
How big is Piedmont Area Data Center?
-
The record has one measure of its size: 337 acres (third party estimate, source). Its power capacity is not disclosed.
Who is building Piedmont Area Data Center?
-
Not disclosed. No source on file names the developer. The sources read for this record are listed under Sources.
How much power and water does Piedmont Area Data Center say it needs?
-
Power: not disclosed by any source on file. Water: not disclosed by any source on file.
Where does Piedmont Area Data Center stand today?
-
It is reported, as reported August 24, 2026. The newest entry, reported September 18, 2026: Cloverleaf will comply with Piedmont noise standards and use closed loop cooling system [3].
What has Piedmont or Canadian County decided about it?
-
No decision by Piedmont or Canadian County about data centers is on the record. The Canadian County page and the Oklahoma scorecard list every rated row the day a person publishes one.
Sources
Reporting
- Powered land company Cloverleaf proposing 633-acre data center in Canadian County, Oklahoma, www.datacenterdynamics.com, May 14, 2026, trade press
- Piedmont City Council to vote Monday night on proposed data center - News 9, News 9, August 24, 2026, local outlet
- Piedmont council considers annexation, rezoning for proposed Cloverleaf data center - News 9, News 9, September 18, 2026, local outlet
- Family living next to proposed Piedmont-area data center fears impact as zoning decision remains pending - news9.com, news9.com, August 24, 2026, local outlet
- Piedmont residents petition data center as developer secures alternate site option - KOKH, KOKH, August 20, 2026, local outlet
- A data center campus would mean millions for an Oklahoma town. One family faces the human cost - KOCO, KOCO, August 23, 2026, local outlet
6 sources on file.
Cite this record
Data Center Record, "Piedmont Area Data Center", https://datacenterrecord.org/projects/piedmont-area-data-center-ok, last verified September 25, 2026.
Cite this page
Data Center Record, "Piedmont Area Data Center", https://datacenterrecord.org/projects/piedmont-area-data-center-ok. Data: Data Center Record, datacenterrecord.org, CC BY 4.0.
The structured rows are CC BY 4.0. Link to this page; that is what turns a reuse into a citation. Prose stays under copyright.
For researchers
- Slug
- piedmont-area-data-center-ok
- Status value
- rumored
- Stage
- Proposed
- Tier
- skeleton
- Tags
- skeleton
- Place id
- us/ok/canadian-county/piedmont
- Coordinates
- 35.53028, -97.9575
- Location precision
- county
- Location source
- County seat (El Reno), Wikidata, placed at county level
- Coordinate source
- wikidata county seat
- Location source number
- Not disclosed
- Location last verified
- September 16, 2026
- EPA registry id
- Not disclosed
- Use type values
- not_disclosed
- Tenancy value
- not_disclosed
- Cooling type value
- not_disclosed
- Capacity basis
- not_disclosed
- Water basis
- not_disclosed, gallons_per_day
- Acreage basis
- third_party_estimate
- Interconnection value
- not_disclosed
- Capacity, if disclosed
- Not disclosed
- Rating of the county's rows
- Not disclosed
- Published
- 2026-09-05
- Last verified
- 2026-09-25