TierPoint Oklahoma City Data Centers

Street address 4121 Perimeter PL, Oklahoma City, OK 73112, Oklahoma County verified address Exact, at the address [1] U.S. Census Bureau TIGERweb city centroid, public domain

Overview, regulatory gates and specifications

TierPoint lists a data center at Oklahoma City, Oklahoma among the sites it operates. [4] TierPoint lists TierPoint Oklahoma City Data Centers at Oklahoma City, Oklahoma on its own page of data center locations, read September 14, 2026. [2]

1. Land & Parcel
Parcel located
2. Local Zoning
Zoning approved
3. Tax & EDA Deal
Not yet on file
4. Utility Grid Queue
Energized
5. Air & Water Permits
EPA air permit on file
What happens next: Facility is operational; air permit compliance, water reporting and utility filings are monitored.
Electricity Demand
Not disclosed
No MW figure in public filings yet

U.S. EIA residential equivalence (~830 homes per MW) will compute automatically once a permit or filing states facility megawatts.

Utility interconnection queue filings monitored.

Cooling & Water
Not disclosed
Daily water volume not stated in public filings

U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.

No local property tax abatement amount disclosed in public filings.

Site & Buildings
Not disclosed
Acreage not stated in public filings yet

Assessor parcel acreage and building square footage are added when municipal or county filings are published.

Location: 4121 Perimeter PL, Oklahoma City, OK 73112.

Taxes & Permanent Jobs
Not disclosed
Tax and job figures not yet on file

State and local tax abatement agreements and permanent job commitments are recorded when filed.

No local property tax abatement amount disclosed in public filings.

Key specifications on the record

Power capacity
Not disclosed Reported by others: 3.3 GW (KOKH (opens in a new tab)); 2 GW (BIC Magazine (opens in a new tab)). Their figure, not the record's.
Water usage
Not disclosed Reported by others: 1,540,000 gallons per day (cnhinews.com (opens in a new tab)); 100,000,000 gallons a year (news9.com (opens in a new tab)). Their figure, not the record's.
Land area
Not disclosed
Buildings
Not disclosed
Backup generators
Not disclosed
Capital investment
Not disclosed
Commissioned
Operational since 2003 (23 years)
Who leads it
TierPoint as stated by the source
Who is constructing it
Google general contractor as stated by the source
[5] greenstreetnews.com
Official project website
tierpoint.com (opens in a new tab) verified October 28, 2026
tierpoint.com (opens in a new tab)
Archived promotional websites
tierpoint.com (opens in a new tab) [Wayback snapshot] (opens in a new tab) preserved in Internet Archive
tracked domains
Not disclosed
Who would use it, Jobs once it runs, Tax each year

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: TierPoint · Contractor: Google general contractor
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for TierPoint Oklahoma City Data Centers.

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW)
Site Footprint (Acres)
Data Hall Buildings
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Power the campus would draw A utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Hearings and statements on the record

April 21, 2026 Oklahoma City, OK Oklahoma City Council Unanimous Emergency Data Center Moratorium Vote Oklahoma City Council 2 clips

On April 21, 2026, the Oklahoma City Council voted unanimously to adopt an emergency ordinance placing a temporary moratorium on new data center development across Oklahoma City after staff warned that multiple hyperscale applicants were seeking massive municipal water and electric resources.

  1. David Holt, Mayor, City of Oklahoma City Elected Official transcribed from local broadcast report
    "Some of these are getting to the hyperscale size, and there’s a lot of demand that places on our resources. In a unanimous vote, Oklahoma City leaders approved an emergency ordinance that puts a moratorium on new data center development. Supporters calling it a necessary timeout. Slowing down the process would allow for transparency and allow the community, who must bear the harms of a technology that extracts local resources. The moratorium stops the city from accepting or approving rezoning requests and permits tied to data centers through the end of 2026."
  2. Resident public comment Resident Public Comment transcribed from local broadcast report
    "Trevor francis owns a data center in okc and says he doesn’t know what this moratorium means for his future dreams. One of the things that we’re working on right now in our data center is we are we’re expanding our central plants. Our central plant is responsible for cooling, expanding the campus. So a moratorium on data centers right now will prevent us from expanding the central plant and will also make it difficult for those tenants to actually expand and occupy their buildings."

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

  1. (source date; the content gives no date of its own)

    Data center meets FEMA Zone 4 rated and Seismic 2 rated earthquake standards

    [4] news9.com

  2. (source date; the content gives no date of its own)

    MIDCON data center located in Quail Springs Business Park

    [4] news9.com

  3. (source date; the content gives no date of its own)

    MIDCON Recovery Solutions data center has been operational since about 2016

    [4] news9.com

  4. (source date; the content gives no date of its own)

    TierPoint completes fourth data center in Oklahoma

    [3] datacenterdynamics.com

  5. (source date; the content gives no date of its own)

    TierPoint delivers largest commercial data center in Oklahoma

    [7] commercialsearch.com

  6. (content date)

    TierPoint second Oklahoma City data center built in 2008, 22500 square feet with 15000 square feet raised floor capacity, withstands winds up to 150 miles per hour, cooled with 150 tons of computer room air conditioning under floor and in line cooling

    [6] news9.com

  7. (content date)

    TierPoint first Oklahoma City data center began operation in 2003, is 4000 square feet, cooled with 100 tons of computer room air conditioning

    [6] news9.com

Every event in order

  • Read on September 14, 2026 (the day the page was read; it gives no date of its own)

    TierPoint lists TierPoint Oklahoma City Data Centers at Oklahoma City, Oklahoma on its own page of data center locations, read September 14, 2026.

    [2] tierpoint.com

Nearest data centers in Oklahoma

Verified data center records in Oklahoma within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
Piedmont Area Data Center Piedmont, Canadian County ~25 mi Proposed
El Reno Bitcoin Mining Data Center El Reno, Canadian County ~25 mi Proposed
Yukon Data Center Yukon, Canadian County ~25 mi Proposed
Grady County Data Center Grady County ~38 mi Proposed
Google Stillwater data center Stillwater, Payne County 55 mi Being built Google 1 building

Blank cell: not disclosed by any source on file.

Comparisons

5 metrics with more than one figure

Every figure on the record for the same thing, each with who gave it, its date and its basis.

Capacity at full buildout

2 figures, 2 sources
Show each source's words
  • 3.3 GW, KOKH: Project Thunderbird would require up to 3.3 gigawatts of power
  • 2 GW, BIC Magazine: AB Energy USA secured approximately 2 GW of on site data center power capacity across five projects in Texas and Oklahoma.

Project footprint

1 figure, 1 source
Show each source's words
  • 1,735 acres, KOKH: Project Thunderbird covers about 1,735 acres

Permanent jobs

2 figures, 3 sources
Show each source's words
  • 600 jobs, KOKH: Project Thunderbird would create 600 jobs
  • 600 jobs, cnhinews.com: Project organizers are projecting a conservative 600 full time jobs once the project is completed
  • 100 to 150 jobs, BIC Magazine: AB Energy USA will support 100-150 service and maintenance positions from the secured data center projects.

Water a day

1 figure, 1 source
1,540,000 gallons per day Reported

cnhinews.com, Sep 14, 2026 (opens in a new tab)

Show each source's words
  • 1,540,000 gallons per day, cnhinews.com: Data centers and power plant would use about 1.54 million gallons of water each day

Water a year

1 figure, 1 source
100,000,000 gallons a year Reported

news9.com, Oct 4, 2026 (opens in a new tab)

Show each source's words
  • 100,000,000 gallons a year, news9.com: A data center would require 300,000 gallons of water per day, adding up to 100 million gallons per year, according to Kyle Spotted Horse

Common questions about TierPoint Oklahoma City Data Centers

Answered directly from the verified filings and local actions on this page.

Who is building TierPoint Oklahoma City Data Centers?

TierPoint is the developer, and Google general contractor is the construction contractor, greenstreetnews.com (opens in a new tab). Both names come from the sources linked beside them.

Who will use TierPoint Oklahoma City Data Centers?

Not disclosed. No source on file names a tenant, says whether the site is single or multi tenant, or states what it is for. The record keeps the use as not disclosed until one does; see Who it serves.

How much power and water does TierPoint Oklahoma City Data Centers say it needs?

Power: not disclosed by any source on file. Water: not disclosed by any source on file.

Where does TierPoint Oklahoma City Data Centers stand today?

It is running, since January 1, 2003. The newest entry, reported September 14, 2026: Data center meets FEMA Zone 4 rated and Seismic 2 rated earthquake standards [4].

What is still unknown about TierPoint Oklahoma City Data Centers?

Not disclosed by any source on file: how much power it needs, how much water it would use, how loud it would be, jobs once it runs, tax it would pay each year, how much land, buildings, where its power comes from, grid connection, how it is cooled. No missing primary document is listed for this record yet; What the record lacks is where one appears when a person names it.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Tracked project domains

Promotional domains, campaign sites, and municipal portals preserved through the Internet Archive.

Primary documents

  1. EPA ECHO detailed facility report: Tierpoint LLC / Tierpoint LLC Oklahoma City (opens in a new tab), U.S. Environmental Protection Agency
  2. TierPoint: Browse our data centers (opens in a new tab), TierPoint, September 14, 2026

Reporting

  1. TierPoint completes fourth data center in Oklahoma - Data Center Dynamics (opens in a new tab), Data Center Dynamics, February 27, 2018, trade press
  2. What to know about MIDCON data center in Oklahoma City - News 9 (opens in a new tab), News 9, September 14, 2026, local outlet
  3. Oklahoma City warehouse leased to Google data center builder hits market - Green Street News (opens in a new tab), Green Street News, September 15, 2026, news outlet
  4. What to know about TierPoint data centers in OKC - News 9 (opens in a new tab), News 9, September 14, 2026, local outlet
  5. TierPoint Delivers Largest Commercial Data Center in Oklahoma - commercialsearch.com (opens in a new tab), commercialsearch.com, February 17, 2016, news outlet

7 sources on file.

Regional grid context

This site is in the SPP South (SPSO) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "TierPoint Oklahoma City Data Centers", https://datacenterrecord.org/projects/tierpoint-oklahoma-city-data-centers-ok, last verified October 4, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "TierPoint Oklahoma City Data Centers", https://datacenterrecord.org/projects/tierpoint-oklahoma-city-data-centers-ok. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Running
Tier
built from one source
Tags
Built from one source
Coordinates
35.467653, -97.5138612
How the location is known
Location from the site's street address.
Location source
U.S. Census Bureau TIGERweb city centroid, public domain
Coordinate source
tigerweb city centroid
Location last verified
September 14, 2026
Published
September 14, 2026
Last verified
October 4, 2026
Not disclosed
Location source number, EPA registry id, Uses, Tenancy, Cooling, How capacity was disclosed, How water was disclosed, How acreage was disclosed, Interconnection, Capacity, if disclosed, Rating of the county's rows

Researcher view · TierPoint Oklahoma City Data Centers · 7 sources, 8 entries · basis and source tier on every row · verified October 4, 2026