● Being Built Announced August 13, 2025 · 1 Building · Google

Google Stillwater data center

Street address 3200 N Jardot Rd, Stillwater Industrial Park (Project Rohan), Stillwater, OK 74075, Payne County verified address Exact, at the address [2] U.S. Census Bureau TIGERweb city centroid, public domain

Overview, regulatory gates and specifications

Google lists a data center at Stillwater, Oklahoma and says it is being built. [1] Filings on the record specify 1 planned or operational building. [1] Google lists Google Stillwater data center at Stillwater, Oklahoma on its own page of data center locations, read September 14, 2026. [1]

Verified Site & Permit Summary
Verified address
3200 N Jardot Rd, Stillwater Industrial Park (Project Rohan), Stillwater, OK 74075, Payne County verified address
Operator / developer
Google
Permit / registry ID
Google on file [1]

How much power it needs, how much water it would use and who would use it have not been disclosed.

What happens next: Campus is under construction; building inspections, utility energization and air permits are monitored.

Key specifications on the record

Power capacity
Not disclosed
Water usage
Not disclosed
Land area
Not disclosed
Buildings
1 building operator page
[1] datacenters.google
Backup generators
Not disclosed
Capital investment
Not disclosed
Who leads it
Google as stated by the source
[1] datacenters.google
Official project website
datacenters.google (opens in a new tab) verified October 28, 2026
datacenters.google (opens in a new tab)
Archived promotional websites
datacenters.google (opens in a new tab) [Wayback snapshot] (opens in a new tab) preserved in Internet Archive
tracked domains
Not disclosed
Who would use it, Jobs once it runs, Tax each year

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: Google · Parent: Alphabet
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for Google Stillwater data center.

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW)
Site Footprint (Acres)
Data Hall Buildings 1 building Site filing [1] datacenters.google
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Power the campus would draw A utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

  1. (content date)

    Google announced plans to expand the Pryor facility in August 2025.

    [4] tulsaworld.com

  2. · Status: being built (content date)

    Google announced plans to build a new data center in Stillwater in August 2025.

    [4] tulsaworld.com

Every event in order

  • Read on September 14, 2026 (the day the page was read; it gives no date of its own)

    Google lists Google Stillwater data center at Stillwater, Oklahoma on its own page of data center locations, read September 14, 2026.

    [1] datacenters.google

Nearest data centers in Oklahoma

Verified data center records in Oklahoma within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
TierPoint Oklahoma City Data Centers Oklahoma City, Oklahoma County 55 mi Running TierPoint
TierPoint Tulsa Tulsa, Tulsa County 58 mi Running TierPoint 1 building

Blank cell: not disclosed by any source on file.

Common questions about Google Stillwater data center

Answered directly from the verified filings and local actions on this page.

Who is building Google Stillwater data center?

Google is the developer, datacenters.google (opens in a new tab). No construction contractor is named on the record yet.

How much power and water does Google Stillwater data center say it needs?

Power: not disclosed by any source on file. Water: not disclosed by any source on file.

Where does Google Stillwater data center stand today?

It is being built, since August 13, 2025. The newest entry, August 13, 2025: Google announced plans to expand the Pryor facility in August 2025. [4]

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Tracked project domains

Promotional domains, campaign sites, and municipal portals preserved through the Internet Archive.

Primary documents

  1. Google: Data center locations (opens in a new tab), Google, September 14, 2026
  2. US EPA ECHO and Oklahoma Department of Environmental Quality Permit & Parcel Record (3200 N Jardot Rd, Stillwater Industrial Park (Project Rohan), Stillwater, OK 74075) (opens in a new tab), U.S. Environmental Protection Agency and Oklahoma Department of Environmental Quality, November 6, 2026

Reporting

  1. Stillwater Chamber reports Project Rohan, Google data center win and expanded site outreach - citizenportal.ai (opens in a new tab), citizenportal.ai, April 7, 2025, news outlet
  2. State, local leaders advised to do their homework on data centers (opens in a new tab), Tulsa World, October 2, 2026, local outlet

4 sources on file.

Regional grid context

This site is in the SPP South (SPSO) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Google Stillwater data center", https://datacenterrecord.org/projects/google-stillwater-data-center-ok, last verified November 6, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Google Stillwater data center", https://datacenterrecord.org/projects/google-stillwater-data-center-ok. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Being built
Tier
built from one source
Tags
Built from one source
Coordinates
36.1545, -97.0285
How the location is known
Location from the site's street address.
Location source
U.S. Census Bureau TIGERweb city centroid, public domain
Coordinate source
US EPA ECHO FRS and municipal parcel records
Location last verified
November 6, 2026
Published
September 14, 2026
Last verified
November 6, 2026
Not disclosed
Location source number, EPA registry id, Uses, Tenancy, Cooling, How capacity was disclosed, How water was disclosed, How acreage was disclosed, Interconnection, Capacity, if disclosed, Rating of the county's rows

Researcher view · Google Stillwater data center · 4 sources, 3 entries · basis and source tier on every row · verified November 6, 2026