Buffalo Councilmember
Golombek says he would like to see data centers assist communities they locate in with infrastructure funding because they put a burden on infrastructure such as water and sewer systems.
H5 Data Centers lists 3 data centers at Buffalo, New York among the sites it operates. It is running; the record holds no sourced date for when it reached that stage.
How much power it needs, how much water it would use and who would use it have not been disclosed.
How to read this page. Every fact links to the source it rests on; a number in brackets is its place in the source list. A figure no source gives reads Not disclosed, and nothing is estimated. Where sources give different figures, each is shown with who gave it, and another source's figure never stands in for the record's own. Entries are added and never overwritten; corrections are listed under What happened.
Each figure as its source gave it. The number in brackets is its place in the source list.
| Field | Value | Who says so | Source | Last verified |
|---|---|---|---|---|
| How much power it needs | Not disclosed | |||
| How much water it would use | Not disclosed | |||
| How loud it would be | Not disclosed | |||
| Jobs once it runs | Not disclosed | |||
| Tax it would pay each year | Not disclosed |
| Field | Value | Who says so | Source | Last verified |
|---|---|---|---|---|
| Who is building it | H5 Data Centers | as stated by the source | September 17, 2026 | |
| Who is constructing it | Not disclosed | |||
| How much land | Not disclosed | |||
| Where its power comes from | Not disclosed | |||
| Grid connection | Not disclosed | |||
| How it is cooled | Not disclosed |
The developer's figure is what the company said; what a permit allows is the ceiling a permit sets; measured means observed. Water is in gallons a day or a year, whichever the source stated; a tax claim given as a range shows both ends, each linked to the source that gave it.
The record adds each the day a source gives it. Why these documents.
Acts of Erie County and Buffalo about data centers, on the record with their source. A rule about the area is not a decision about this record.
| Date | Who | Decision | Source |
|---|---|---|---|
| Buffalo | Buffalo Common Council is advancing a proposed two year moratorium on new data centers and cryptocurrency facilities to give the city time to update its zoning rules. | spectrumlocalnews.com |
· Status: running (the day the page was read; it gives no date of its own)
H5 Data Centers lists H5 Buffalo I, H5 Buffalo II, H5 Buffalo III at Buffalo, New York on its own page of data center locations, read September 14, 2026. [1]
Buffalo Councilmember Joseph Golombek says the moratorium goal is to give the city time to update its zoning rules before more facilities are developed and to ensure future projects don't put additional strain on neighborhood infrastructure, including water and sewer systems.
Every statement about data centers in New York, by speaker
Buffalo Councilmember
Golombek says he would like to see data centers assist communities they locate in with infrastructure funding because they put a burden on infrastructure such as water and sewer systems.
Where in Buffalo is not in the public record. The pin marks the center of Buffalo, not a building, and the outline is Erie County.
Tap a pin for the data center, the parcel for its record
The other pins are the published projects in the same state, each in its stage color. The imagery beneath is the USGS national orthoimagery, public domain, shown so the land around the site can be read.
H5 Data Centers is the developer. No construction contractor is named on the record yet.
Power: not disclosed by any source on file. Water: not disclosed by any source on file.
It is running; the date it reached that stage is not sourced, only the day a page was read. The newest entry, read on September 14, 2026: H5 Data Centers lists H5 Buffalo I, H5 Buffalo II, H5 Buffalo III at Buffalo, New York on its own page of data center locations, read September 14, 2026. [1]
Buffalo: Buffalo Common Council is advancing a proposed two year moratorium on new data centers and cryptocurrency facilities to give the city time to update its zoning rules. (reported September 22, 2026, source). 1 event is on the county's rows; a rule about the area is not a decision about this record.
1 source on file.
Data Center Record, "H5 Data Centers Buffalo", https://datacenterrecord.org/projects/h5-data-centers-buffalo-ny, last verified September 17, 2026.
Data Center Record, "H5 Data Centers Buffalo", https://datacenterrecord.org/projects/h5-data-centers-buffalo-ny. Data: Data Center Record, datacenterrecord.org, CC BY 4.0.
The structured rows are CC BY 4.0. Link to this page; that is what turns a reuse into a citation. Prose stays under copyright.