Digi Power X North Tonawanda

Digi Power X, formerly Digihost, runs a crypto mining site with a 60 MW gas fired peaker plant at 1070 Erie Avenue in North Tonawanda; residents filed a class action in the Western District of New York in 2026 and the city's crypto mining moratorium blocks a proposed pivot to AI computing. Skeleton from the litigation packet of 2026-09-09. It is reported, as reported July 13, 2026.

How much power it needs, how much water it would use and who would use it have not been disclosed.

Last verified · 1 source, 0 primary · A skeleton record: built from one source, not yet reviewed in depth by a person. · How to read this page

How to read this page. Every fact links to the source it rests on; a number in brackets is its place in the source list. A figure no source gives reads Not disclosed, and nothing is estimated. Where sources give different figures, each is shown with who gave it, and another source's figure never stands in for the record's own. Entries are added and never overwritten; corrections are listed under What happened.

What is known

Each figure as its source gave it. The number in brackets is its place in the source list.

Land
Not disclosed
Power it would draw
Not disclosed
Reported by others: 60 MW (morethanjustparks.com). Their figure, not the record's.
Water
Not disclosed
Who leads it
Digi Power X
as stated by the source
Who would use it
Not disclosed
Jobs once it runs
Not disclosed
Tax each year
Not disclosed
Every field, with who said it and when (Researcher view)

Impact figures

FieldValueWho says soSourceLast verified
How much power it needs Not disclosed
How much water it would use Not disclosed
How loud it would be Not disclosed
Jobs once it runs Not disclosed
Tax it would pay each year Not disclosed

The record's fields

FieldValueWho says soSourceLast verified
Who is building it Digi Power X as stated by the source September 17, 2026
Who is constructing it Not disclosed
How much land Not disclosed
Where its power comes from Not disclosed
Grid connection Not disclosed
How it is cooled Not disclosed

How much power it needs, also reported: 60 MW, 2026 (morethanjustparks.com: Digi Power X North Tonawanda data center has capacity of 60 MW reported.) .

The developer's figure is what the company said; what a permit allows is the ceiling a permit sets; measured means observed. Water is in gallons a day or a year, whichever the source stated; a tax claim given as a range shows both ends, each linked to the source that gave it.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water useA state water right filing or a water supply agreement.
  • Who would use itA lease announcement or a tenant named in a filing.
  • Power the campus would drawA utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Jobs and taxAn incentive agreement, a county's economic development filing or a fiscal note.

What happened

  1. · Status: rumored (source date; the content gives no date of its own)

    Digi Power X North Tonawanda data center is operational. [1]

The full Digi Power X North Tonawanda timeline, in order

The site

Where in Niagara County is not in the public record. The pin marks the county seat, not a building, and the outline is the county.

  • This record: Proposed, ringed
  • data center
  • Dashed edge: the exact site is not in the public record
  • Smaller pins: 10 other published records in New York
Details
  • this record's location, ringed
  • parcel outline, from the county parcel record
  • city limits, U.S. Census Bureau, on a town level record
  • county boundary

The other pins are the published projects in the same state, each in its stage color. The imagery beneath is the USGS national orthoimagery, public domain, shown so the land around the site can be read.

Where
North Tonawanda, Niagara County, New York
How exactly it is located
County level, the county seat
The parcel
No parcel outline in the public record
Nearest homes
Not computed for a record placed at a place center
Nearest records
Nearest records are not computed for a record placed at a county seat.

Comparisons

1 metric with more than one figure

Every figure on the record for the same thing, the record's own or the document's first, each with who gave it, its date and its basis.

Capacity at full buildout

1 figure, 1 source
Show each source's words
  • 60 MW, morethanjustparks.com: Digi Power X North Tonawanda data center has capacity of 60 MW reported.

Questions about this project

7 questions answered from the record

Answered from the rows on this page.

How big is Digi Power X North Tonawanda?

Not disclosed. No source on file gives its capacity, its acreage or a count of buildings. What the record holds instead is under Disclosed.

Who is building Digi Power X North Tonawanda?

Digi Power X is the developer. No construction contractor is named on the record yet.

Who will use Digi Power X North Tonawanda?

Not disclosed. No source on file names a tenant, says whether the site is single or multi tenant, or states what it is for. The record keeps the use as not disclosed until one does; see Who it serves.

How much power and water does Digi Power X North Tonawanda say it needs?

Power: not disclosed by any source on file. Water: not disclosed by any source on file.

Where does Digi Power X North Tonawanda stand today?

It is reported, as reported July 13, 2026. The newest entry, reported July 13, 2026: Digi Power X North Tonawanda data center is operational. [1]

What has North Tonawanda or Niagara County decided about it?

No decision by North Tonawanda or Niagara County about data centers is on the record. The Niagara County page and the New York scorecard list every rated row the day a person publishes one.

What is still unknown about Digi Power X North Tonawanda?

Not disclosed by any source on file: how much power it needs, how much water it would use, how loud it would be, jobs once it runs, tax it would pay each year, who is constructing it, how much land, where its power comes from, grid connection, how it is cooled. No missing primary document is listed for this record yet; What the record lacks is where one appears when a person names it.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Reporting

  1. DigiPower X North Tonawanda: 60 MW data center in New York, morethanjustparks.com, July 13, 2026, local outlet

1 source on file.

Cite this record

Data Center Record, "Digi Power X North Tonawanda", https://datacenterrecord.org/projects/digi-power-x-north-tonawanda-ny, last verified September 17, 2026.

Last verified , first recorded . Every correction is logged on the corrections page.

Cite this page

Data Center Record, "Digi Power X North Tonawanda", https://datacenterrecord.org/projects/digi-power-x-north-tonawanda-ny. Data: Data Center Record, datacenterrecord.org, CC BY 4.0.

The structured rows are CC BY 4.0. Link to this page; that is what turns a reuse into a citation. Prose stays under copyright.

Report a change
For researchers
Slug
digi-power-x-north-tonawanda-ny
Status value
rumored
Stage
Proposed
Tier
skeleton
Tags
skeleton
Place id
us/ny/niagara-county/north-tonawanda
Coordinates
43.1697, -78.6911
Location precision
county
Location source
County seat (Lockport), Wikidata, placed at county level
Coordinate source
wikidata county seat
Location source number
Not disclosed
Location last verified
September 16, 2026
EPA registry id
Not disclosed
Use type values
not_disclosed
Tenancy value
not_disclosed
Cooling type value
not_disclosed
Capacity basis
not_disclosed
Water basis
not_disclosed, gallons_per_day
Acreage basis
Not disclosed
Interconnection value
not_disclosed
Capacity, if disclosed
Not disclosed
Rating of the county's rows
Not disclosed
Published
2026-09-10
Last verified
2026-09-17