Census GEOID: 36063 Location Precision: verified address Jump to Entity & Permit Table Commercial & Bulk Data (CC BY-NC 4.0)

Last verified: · 1 reporting source

● Running Reported July 13, 2026 · 2 Buildings

Digi Power X North Tonawanda Power and Computing Campus

Street address 1070 Erie Avenue, North Tonawanda, NY 14120, Niagara County verified address Exact, at the address dec.ny.gov (opens in a new tab)

Overview, regulatory gates and specifications

Digi Power X (formerly Digihost) operates a 60 MW digital asset and high performance computing data center campus colocated with the Fortistar combined cycle gas plant at 1070 Erie Avenue in North Tonawanda, Niagara County, New York. [1] Filings on the record specify 2 planned or operational buildings. [1] Digi Power X North Tonawanda data center is operational. [1]

1. Land & Parcel
Parcel located
2. Local Zoning
Zoning approved
3. Tax & EDA Deal
Not yet on file
4. Utility Grid Queue
Energized
5. Air & Water Permits
Not yet on file
What happens next: Facility is operational; air permit compliance, water reporting and utility filings are monitored.
Electricity Demand [1]
60 MW
the developer's figure

Equivalent to ~49,800 U.S. homes (U.S. EIA 830 homes/MW baseline) · 2.9% of Hoover Dam nameplate capacity (2,080 MW).

Grid interconnection and utility service tracked on file.

Cooling & Water
Not disclosed
Daily water volume not stated in public filings

U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.

No local property tax abatement amount disclosed in public filings.

Site & Buildings [1]
2 buildings
permit filing

Assessor parcel acreage and building square footage are added when municipal or county filings are published.

Location: 1070 Erie Avenue, North Tonawanda, NY 14120.

Taxes & Permanent Jobs
Not disclosed
Tax and job figures not yet on file

State and local tax abatement agreements and permanent job commitments are recorded when filed.

No local property tax abatement amount disclosed in public filings.

Key specifications on the record

Power capacity
60 MW developer figure Equivalent to the continuous electricity demand of about 49,800 average U.S. homes based on U.S. Energy Information Administration residential consumption data. About 0.6 percent of New York City's summer peak demand in 2024.
dec.ny.gov (opens in a new tab)
Water usage
Not disclosed
Land area
Not disclosed
Buildings
2 buildings permitted
dec.ny.gov (opens in a new tab)
Backup generators
Not disclosed
Capital investment
Not disclosed
Commissioned
Operational since 2018 (8 years)
Who leads it
Digi Power X as stated by the source
Not disclosed
Who would use it, Jobs once it runs, Tax each year
The math behind the comparison
  1. Digi Power X North Tonawanda Power and Computing Campus, capacity: 60 MW.
  2. New York City (NYISO Zone J) summer peak demand, actual, 2024: 10,245 MW (2024).
  3. 60 ÷ 10,245 = 0.0059 (MW over MW).

Sources:

A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: Digi Power X
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for Digi Power X North Tonawanda Power and Computing Campus.

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW) 60 MW 60 MW the developer's figure
Site Footprint (Acres)
Data Hall Buildings 2 buildings 2 permit filing
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

  1. · Status: running (source date; the content gives no date of its own)

    Digi Power X North Tonawanda data center is operational.

    [1] morethanjustparks.com

Every event in order

1 correction to this record

Every correction, with its reason
  1. · Project summary

    The summary ended with a note from the review notes that drafted the record, not a fact about it; the note is removed (the trust fixes of October 8, 2026).

Every correction on the record is on the corrections page.

Nearest data centers in New York

Verified data center records in New York within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
H5 Data Centers Buffalo II (Lockport) Lockport, Niagara County 11 mi Running H5 Data Centers 1 building
Yahoo Lockport Hyperscale Data Center Campus Lockport, Niagara County 11 mi Running Yahoo 70 MW
H5 Data Centers Buffalo Carrier Hotel Campus Buffalo, Erie County 11 mi Running H5 Data Centers 8 MW
H5 Data Centers Lockport Enterprise Campus (Buffalo I and II) Lockport, Niagara County 11 mi Running H5 Data Centers 12 MW
Stream Data Centers Western New York STAMP Hyperscale Campus Basom, Genesee County 24 mi Proposed Stream Data Centers 250 MW

Blank cell: not disclosed by any source on file.

Comparisons

1 metric with more than one figure

Every figure on the record for the same thing, each with who gave it, its date and its basis.

Capacity at full buildout

2 figures, 2 sources
Show each source's words
  • 60 MW, morethanjustparks.com: Digi Power X North Tonawanda data center has capacity of 60 MW reported.

Common questions about Digi Power X North Tonawanda Power and Computing Campus

Answered directly from the verified filings and local actions on this page.

Who is building Digi Power X North Tonawanda Power and Computing Campus?

Digi Power X is the developer. No construction contractor is named on the record yet.

Who will use Digi Power X North Tonawanda Power and Computing Campus?

Not disclosed. No source on file names a tenant, says whether the site is single or multi tenant, or states what it is for. The record keeps the use as not disclosed until one does; see Who it serves.

How much power and water does Digi Power X North Tonawanda Power and Computing Campus say it needs?

Power: 60 MW (the developer's figure, dec.ny.gov (opens in a new tab)). Water: not disclosed by any source on file.

Where does Digi Power X North Tonawanda Power and Computing Campus stand today?

It is running, as reported July 13, 2026. The newest entry, reported July 13, 2026: Digi Power X North Tonawanda data center is operational. [1]

What is still unknown about Digi Power X North Tonawanda Power and Computing Campus?

Not disclosed by any source on file: how much water it would use, how loud it would be, jobs once it runs, tax it would pay each year, who is constructing it, how much land, where its power comes from, grid connection, how it is cooled. No missing primary document is listed for this record yet; What the record lacks is where one appears when a person names it.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Reporting

  1. DigiPower X North Tonawanda: 60 MW data center in New York (opens in a new tab), morethanjustparks.com, July 13, 2026, news outlet

1 source on file.

Regional grid context

This site is in the NPCC Upstate New York (NYUP) regional power market.

Sources and data

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Digi Power X North Tonawanda Power and Computing Campus", https://datacenterrecord.org/projects/digi-power-x-north-tonawanda-ny, last verified October 27, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Digi Power X North Tonawanda Power and Computing Campus", https://datacenterrecord.org/projects/digi-power-x-north-tonawanda-ny. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Running
Tier
built from one source
Tags
Built from one source
Coordinates
43.0405, -78.8612
How the location is known
Location from the site's street address.
Location source
https://dec.ny.gov/environmental-protection/air-quality
Coordinate source
NYSDEC Title V Permit 9-2912-00059 / NYPSC Case 21-E-0160
Location last verified
September 16, 2026
How capacity was disclosed
the developer's figure
Capacity, if disclosed
60 MW, the developer's figure
Published
September 10, 2026
Last verified
October 27, 2026
Not disclosed
Location source number, EPA registry id, Uses, Tenancy, Cooling, How water was disclosed, How acreage was disclosed, Interconnection, Rating of the county's rows

Researcher view · Digi Power X North Tonawanda Power and Computing Campus · 1 source, 1 entry · basis and source tier on every row · verified October 27, 2026