Emerson Global Data Center
The EPA's facility registry lists Emerson Global Data Center at 1704 S Governor RD, Marshalltown, IA 50158 in Marshalltown, Iowa, with an air permit. It is not yet verified: a public permit shows this site exists; its current status has not been confirmed from a record.
How much power it needs, how much water it would use and who would use it have not been disclosed.
How to read this page. Every fact links to the source it rests on; a number in brackets is its place in the source list. A figure no source gives reads Not disclosed, and nothing is estimated. Where sources give different figures, each is shown with who gave it, and another source's figure never stands in for the record's own. Entries are added and never overwritten; corrections are listed under What happened.
What is known
Each figure as its source gave it. The number in brackets is its place in the source list.
- Land
- Not disclosed
- Power it would draw
- Not disclosed
- Water
- Not disclosed
- Who leads it
- Not disclosed
- Who would use it
- Not disclosed
- Jobs once it runs
- Not disclosed
- Tax each year
- Not disclosed
Every field, with who said it and when (Researcher view)
Impact figures
| Field | Value | Who says so | Source | Last verified |
|---|---|---|---|---|
| How much power it needs | Not disclosed | |||
| How much water it would use | Not disclosed | |||
| How loud it would be | Not disclosed | |||
| Jobs once it runs | Not disclosed | |||
| Tax it would pay each year | Not disclosed |
The record's fields
| Field | Value | Who says so | Source | Last verified |
|---|---|---|---|---|
| Who is building it | Not disclosed | |||
| Who is constructing it | Not disclosed | |||
| How much land | Not disclosed | |||
| Where its power comes from | Not disclosed | |||
| Grid connection | Not disclosed | |||
| How it is cooled | Not disclosed |
Tax it would pay each year, also reported: 5,000,000 dollars, 2026 (Times Republican: Rebik noted that in North Carolina, Google paid just 5 million dollars in taxes while receiving 73 million in tax breaks,14 times more than they contributed.) .
The developer's figure is what the company said; what a permit allows is the ceiling a permit sets; measured means observed. Water is in gallons a day or a year, whichever the source stated; a tax claim given as a range shows both ends, each linked to the source that gave it.
Still not public, and where it would show up
The record adds each the day a source gives it. Why these documents.
- Water useA state water right filing or a water supply agreement.
- Who would use itA lease announcement or a tenant named in a filing.
- Power the campus would drawA utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
- Who is behind itA land record, a zoning application or a company's own announcement.
- Jobs and taxAn incentive agreement, a county's economic development filing or a fiscal note.
What happened
No dated entry is on the record yet.
The site
The pin is the site, as the EPA's facility record places it. Location from an EPA air permit.
Tap a pin for the data center, the parcel for its record
- This record: Not yet verified, ringed
- data center
- Smaller pins: 12 other published records in Iowa
Details
- this record's location, ringed
- parcel outline, from the county parcel record
- city limits, U.S. Census Bureau, on a town level record
- county boundary
The other pins are the published projects in the same state, each in its stage color. The imagery beneath is the USGS national orthoimagery, public domain, shown so the land around the site can be read.
- Where
- 1704 S Governor RD, Marshalltown, IA 50158, Marshalltown, Marshall County, Iowa [source]
- How exactly it is located
- Exact, the point of the EPA's facility record
- The parcel
- No parcel outline in the public record
- Nearest homes
- Not computed for a record placed at a place center
- Nearest records
- Cologix Des Moines, 49 mi
- CyrusOne Council Bluffs OCB1, 164 mi
Comparisons
1 metric with more than one figure
Tax each year
1 figure, 1 sourceShow each source's words
- 5,000,000 dollars, Times Republican: Rebik noted that in North Carolina, Google paid just 5 million dollars in taxes while receiving 73 million in tax breaks,14 times more than they contributed.
Questions about this project
7 questions answered from the record
How big is Emerson Global Data Center?
-
Not disclosed. No source on file gives its capacity, its acreage or a count of buildings. What the record holds instead is under Disclosed.
Who is building Emerson Global Data Center?
-
Not disclosed. No source on file names the developer. The sources read for this record are listed under Sources.
Who will use Emerson Global Data Center?
-
Not disclosed. No source on file names a tenant, says whether the site is single or multi tenant, or states what it is for. The record keeps the use as not disclosed until one does; see Who it serves.
How much power and water does Emerson Global Data Center say it needs?
-
Power: not disclosed by any source on file. Water: not disclosed by any source on file.
Where does Emerson Global Data Center stand today?
-
It is not yet verified: a public permit shows this site exists; its current status has not been confirmed from a record. No dated entry is on the record yet.
What has Marshalltown or Marshall County decided about it?
-
No decision by Marshalltown or Marshall County about data centers is on the record. The Marshall County page and the Iowa scorecard list every rated row the day a person publishes one.
What is still unknown about Emerson Global Data Center?
-
Not disclosed by any source on file: how much power it needs, how much water it would use, how loud it would be, jobs once it runs, tax it would pay each year, who is building it, who is constructing it, how much land, where its power comes from, grid connection, how it is cooled. No missing primary document is listed for this record yet; What the record lacks is where one appears when a person names it.
Sources
Primary documents
- EPA ECHO detailed facility report: Emerson Global Data Center, U.S. Environmental Protection Agency
1 source on file.
Cite this record
Data Center Record, "Emerson Global Data Center", https://datacenterrecord.org/projects/emerson-global-data-center-marshalltown-ia, last verified October 3, 2026.
Cite this page
Data Center Record, "Emerson Global Data Center", https://datacenterrecord.org/projects/emerson-global-data-center-marshalltown-ia. Data: Data Center Record, datacenterrecord.org, CC BY 4.0.
The structured rows are CC BY 4.0. Link to this page; that is what turns a reuse into a citation. Prose stays under copyright.
For researchers
- Slug
- emerson-global-data-center-marshalltown-ia
- Status value
- not_verified
- Stage
- Not yet verified
- Tier
- skeleton
- Tags
- skeleton
- Place id
- us/ia/marshall-county/marshalltown
- Coordinates
- 42.028327, -92.89345
- Location precision
- permit_point
- Location source
- EPA ECHO facility record 110037595992: the registry placed its point by address matching house number, accurate to 50 m
- Coordinate source
- epa frs point
- Location source number
- [1]
- Location last verified
- October 3, 2026
- EPA registry id
- 110037595992
- Use type values
- not_disclosed
- Tenancy value
- not_disclosed
- Cooling type value
- not_disclosed
- Capacity basis
- not_disclosed
- Water basis
- not_disclosed, gallons_per_day
- Acreage basis
- Not disclosed
- Interconnection value
- not_disclosed
- Capacity, if disclosed
- Not disclosed
- Rating of the county's rows
- Not disclosed
- Published
- 2026-10-03
- Last verified
- 2026-10-03