● Running Reported May 29, 2026 · 2 Buildings

CyrusOne Council Bluffs Data Center (OCB1)

Street address 4700 Gifford Road, Council Bluffs, IA 51501, Pottawattamie County verified address Exact, at the address EPA ECHO detailed facility report: Cyrusone LLC (opens in a new tab)

Overview, regulatory gates and specifications

CyrusOne operates the OCB1 commercial colocation data center campus at 4700 Gifford Road in Council Bluffs, Pottawattamie County, Iowa. [1] Filings on the record specify disclosed capacity of 30 MW (the developer's figure), 2 planned or operational buildings. [1] CyrusOne lists CyrusOne Council Bluffs OCB1 at Council Bluffs, Iowa on its own page of data center locations, read September 14, 2026. [3]

1. Land & Parcel
Parcel located
2. Local Zoning
Zoning approved
3. Tax & EDA Deal
Not yet on file
4. Utility Grid Queue
Energized
5. Air & Water Permits
EPA air permit on file
What happens next: Facility is operational; air permit compliance, water reporting and utility filings are monitored.
Electricity Demand [1]
30 MW
the developer's figure

Equivalent to ~24,900 U.S. homes (U.S. EIA 830 homes/MW baseline) · 1.4% of Hoover Dam nameplate capacity (2,080 MW).

Grid interconnection and utility service tracked on file.

Cooling & Water
Not disclosed
Daily water volume not stated in public filings

U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.

No local property tax abatement amount disclosed in public filings.

Site & Buildings [1]
2 buildings
operator page

Assessor parcel acreage and building square footage are added when municipal or county filings are published.

Location: 4700 Gifford Road, Council Bluffs, IA 51501.

Taxes & Permanent Jobs
Not disclosed
Tax and job figures not yet on file

State and local tax abatement agreements and permanent job commitments are recorded when filed.

No local property tax abatement amount disclosed in public filings.

Key specifications on the record

Power capacity
30 MW developer figure Equivalent to the continuous electricity demand of about 24,900 average U.S. homes based on U.S. Energy Information Administration residential consumption data. About 0.3 percent of New York City's summer peak demand in 2024.
cyrusone.com (opens in a new tab)
Water usage
Not disclosed
Land area
Not disclosed
Buildings
2 buildings operator page
cyrusone.com (opens in a new tab)
Backup generators
Not disclosed
Capital investment
Not disclosed
Commissioned
Operational since 2020 (6 years)
Who leads it
CyrusOne as stated by the source
Official project website
cyrusone.com (opens in a new tab) verified October 28, 2026
cyrusone.com (opens in a new tab)
Not disclosed
Who would use it, Jobs once it runs, Tax each year
The math behind the comparison
  1. CyrusOne Council Bluffs Data Center (OCB1), capacity: 30 MW.
  2. New York City (NYISO Zone J) summer peak demand, actual, 2024: 10,245 MW (2024).
  3. 30 ÷ 10,245 = 0.0029 (MW over MW).

Sources:

A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: CyrusOne
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for CyrusOne Council Bluffs Data Center (OCB1).

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW) 30 MW 30 MW the developer's figure
Site Footprint (Acres)
Data Hall Buildings 2 buildings 2 operator page
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Hearings and statements on the record

August 8, 2023 Council Bluffs, IA Google announces $350 million investment in Council Bluffs data center Council Bluffs City Council 3 clips

Council Bluffs City Council approval of economic development agreements and municipal water allocations for Google $350 million Council Bluffs data center expansion (August 8, 2023).

  1. Council Bluffs Economic Development and Applicant Presentation Developer Representative transcribed from local broadcast report
    "you can see the dirt being moved Google's big Council Bluffs data center is getting bigger Tuesday they announced a 350 million dollar investment in the center along I-29 which first broke ground in 2007. the Council Bluffs data center where we are right now is one of the largest in all of the world they say they already have invested about 5 billion in southwest Iowa and employ around 900."
  2. KMTV 3 News Now Broadcast Report Broadcast Report transcribed from local broadcast report
    "projects driving expansion of Google data centers the thousands of computers here power tools you might use like Google Drive and Gmail politicians were on hand like U.S senator Joni Ernst and lieutenant governor Adam Gregg who says people think of Iowa as really only having agriculture I think we surprise people when they learn that we're also the home to Major tech industry players like Google also announced Tuesday at"
  3. Resident public comment Resident Public Comment transcribed from local broadcast report
    "construction of the first co working space in Council Bluffs I think almost cried when they when they announced it because it's just been a long time coming the grant recipient the advanced southwest Iowa Corporation hopes the co working space will help local small businesses it's something that's been missing in Council Bluffs so we have nothing as far as a collaborative space a co working space we're way under the curve and we needed something and a place where all these folks can come"

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

  1. Filing (source date; the content gives no date of its own)

    QTS submitted plans to City of Cedar Rapids for temporary power plant

    [4] thegazette.com

  2. (source date; the content gives no date of its own)

    QTS does not yet have permit for temporary power plant

    [4] thegazette.com

  3. (source date; the content gives no date of its own)

    Temporary power plant consists of modular, self contained units to be used only during construction

    [4] thegazette.com

  4. · Status: running (source date; the content gives no date of its own)

    QTS planning temporary natural gas powered plant roughly 2 miles from Eastern Iowa Airport

    [4] thegazette.com

Every event in order

  • Read on September 14, 2026 (the day the page was read; it gives no date of its own)

    CyrusOne lists CyrusOne Council Bluffs OCB1 at Council Bluffs, Iowa on its own page of data center locations, read September 14, 2026.

    [3] cyrusone.com

Nearest data centers in Iowa

Verified data center records in Iowa within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
Google Council Bluffs Data Center Campus Council Bluffs, Pottawattamie County 2 mi Running Google 350 MW
Edged Council Bluffs Data Center Campus (Project Lola) Council Bluffs, Pottawattamie County 2 mi Proposed Edged Energy 200 MW

Blank cell: not disclosed by any source on file.

Common questions about CyrusOne Council Bluffs Data Center (OCB1)

Answered directly from the verified filings and local actions on this page.

Who is building CyrusOne Council Bluffs Data Center (OCB1)?

CyrusOne is the developer. No construction contractor is named on the record yet.

How much power and water does CyrusOne Council Bluffs Data Center (OCB1) say it needs?

Power: 30 MW (the developer's figure, cyrusone.com (opens in a new tab)). Water: not disclosed by any source on file.

Where does CyrusOne Council Bluffs Data Center (OCB1) stand today?

It is running, as reported May 29, 2026. The newest entry, reported May 29, 2026: QTS submitted plans to City of Cedar Rapids for temporary power plant [4].

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Tracked project domains

Promotional domains, campaign sites, and municipal portals preserved through the Internet Archive.

Primary documents

  1. CyrusOne: Data centers (opens in a new tab), CyrusOne, September 14, 2026
  2. EPA ECHO detailed facility report: Cyrusone LLC (opens in a new tab), U.S. Environmental Protection Agency
  3. CyrusOne: CyrusOne Council Bluffs OCB1 (opens in a new tab), CyrusOne, September 14, 2026

Reporting

  1. QTS to build temporary power plant near Eastern Iowa Airport - thegazette.com (opens in a new tab), thegazette.com, May 29, 2026, local outlet

4 sources on file.

Regional grid context

This site is in the MRO West (MROW) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "CyrusOne Council Bluffs Data Center (OCB1)", https://datacenterrecord.org/projects/cyrusone-council-bluffs-ocb1-ia, last verified October 27, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "CyrusOne Council Bluffs Data Center (OCB1)", https://datacenterrecord.org/projects/cyrusone-council-bluffs-ocb1-ia. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Running
Tier
built from one source
Tags
Built from one source
Coordinates
41.2135, -95.8492
How the location is known
Location from the site's street address.
Location source
https://www.cyrusone.com/locations/iowa/council-bluffs/
Coordinate source
CyrusOne OCB1 specification
Location source number
[2]
Location last verified
October 4, 2026
EPA registry id
110070824275
How capacity was disclosed
the developer's figure
Capacity, if disclosed
30 MW, the developer's figure
Published
September 14, 2026
Last verified
October 27, 2026
Not disclosed
Uses, Tenancy, Cooling, How water was disclosed, How acreage was disclosed, Interconnection, Rating of the county's rows