Data Center Record.
Census GEOID: 19155 Location Precision: verified address Jump to Entity & Permit Table Commercial & Bulk Data (CC BY-NC 4.0)

Last verified: · 1 primary and 1 reporting sources

● Running Reported August 10, 2026 · 6 Buildings

Google Council Bluffs Data Center Campus

Street address 10324 Bunge Avenue, Council Bluffs, IA 51503, Pottawattamie County verified address Exact, at the address [1] Google: Data center locations

Overview, regulatory gates and specifications

Google operates its Council Bluffs hyperscale data center campus across two sites on Bunge Avenue and Veterans Memorial Highway in Council Bluffs, Pottawattamie County, Iowa. [1] Filings on the record specify disclosed capacity of 350 MW (the developer's figure), 6 planned or operational buildings. [1] Google lists Google Council Bluffs data center at Council Bluffs, Iowa on its own page of data center locations, read September 14, 2026. [1]

1. Land & Parcel
Parcel located
2. Local Zoning
Zoning approved
3. Tax & EDA Deal
Not yet on file
4. Utility Grid Queue
Energized
5. Air & Water Permits
Not yet on file
What happens next: Facility is operational; air permit compliance, water reporting and utility filings are monitored.
Electricity Demand [1]
350 MW
the developer's figure

Equivalent to ~290,500 U.S. homes (U.S. EIA 830 homes/MW baseline) · 17% of Hoover Dam nameplate capacity (2,080 MW).

Grid interconnection and utility service tracked on file.

Cooling & Water
Not disclosed
Daily water volume not stated in public filings

U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.

No local property tax abatement amount disclosed in public filings.

Site & Buildings [1]
6 buildings
operator page

Assessor parcel acreage and building square footage are added when municipal or county filings are published.

Location: 10324 Bunge Avenue, Council Bluffs, IA 51503.

Taxes & Permanent Jobs
Not disclosed
Tax and job figures not yet on file

State and local tax abatement agreements and permanent job commitments are recorded when filed.

No local property tax abatement amount disclosed in public filings.

Key specifications on the record

Power capacity
350 MW developer figure Equivalent to the continuous electricity demand of about 290,500 average U.S. homes based on U.S. Energy Information Administration residential consumption data. About 3 percent of New York City's summer peak demand in 2024.
[1] datacenters.google
Water usage
Not disclosed
Land area
Not disclosed
Buildings
6 buildings operator page
[1] datacenters.google
Backup generators
Not disclosed
Capital investment
Not disclosed
Commissioned
Operational since 2009 (17 years)
Who leads it
Google as stated by the source
Official project website
datacenters.google (opens in a new tab) verified October 28, 2026
datacenters.google (opens in a new tab)
Archived promotional websites
datacenters.google (opens in a new tab) [Wayback snapshot] (opens in a new tab) preserved in Internet Archive
tracked domains
Not disclosed
Who would use it, Jobs once it runs, Tax each year
The math behind the comparison
  1. Google Council Bluffs Data Center Campus, capacity: 350 MW.
  2. New York City (NYISO Zone J) summer peak demand, actual, 2024: 10,245 MW (2024).
  3. 350 ÷ 10,245 = 0.03 (MW over MW).

Sources:

A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: Google · Parent: Alphabet
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for Google Council Bluffs Data Center Campus.

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW) 350 MW 350 MW the developer's figure [1] datacenters.google
Site Footprint (Acres)
Data Hall Buildings 6 buildings 6 operator page [1] datacenters.google
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Hearings and statements on the record

August 8, 2023 Council Bluffs, IA Google announces $350 million investment in Council Bluffs data center Council Bluffs City Council 3 clips

Council Bluffs City Council approval of economic development agreements and municipal water allocations for Google $350 million Council Bluffs data center expansion (August 8, 2023).

  1. Council Bluffs Economic Development and Applicant Presentation Developer Representative transcribed from local broadcast report
    "you can see the dirt being moved Google's big Council Bluffs data center is getting bigger Tuesday they announced a 350 million dollar investment in the center along I-29 which first broke ground in 2007. the Council Bluffs data center where we are right now is one of the largest in all of the world they say they already have invested about 5 billion in southwest Iowa and employ around 900."
  2. KMTV 3 News Now Broadcast Report Broadcast Report transcribed from local broadcast report
    "projects driving expansion of Google data centers the thousands of computers here power tools you might use like Google Drive and Gmail politicians were on hand like U.S senator Joni Ernst and lieutenant governor Adam Gregg who says people think of Iowa as really only having agriculture I think we surprise people when they learn that we're also the home to Major tech industry players like Google also announced Tuesday at"
  3. Resident public comment Resident Public Comment transcribed from local broadcast report
    "construction of the first co working space in Council Bluffs I think almost cried when they when they announced it because it's just been a long time coming the grant recipient the advanced southwest Iowa Corporation hopes the co working space will help local small businesses it's something that's been missing in Council Bluffs so we have nothing as far as a collaborative space a co working space we're way under the curve and we needed something and a place where all these folks can come"
Said and filed

Said and filed

Statements and filings, side by side

Column A · Dated Statement
Iowa Economic Development Authority and Municipal Sponsors State and Municipal Economic Development Officials
Venue: Waukee and Council Bluffs Data Center Tax Incentive and Expansion Hearings
"Approving multi decade property tax abatements and state tax rebates for hyperscale data centers in Waukee, Altoona, and Council Bluffs guarantees transformative public infrastructure funding and long term school district tax growth."
Column B · Primary Government Record
Dallas County Assessor Tax Abatement Valuation Audit ($5.3M School and City Shortfall) and Council Bluffs Water Works Records
Dallas County Assessment Roll Correction (Apple Waukee Abatement) · Council Bluffs Water Works Filings
Agency or Venue: Dallas County Assessor, Waukee Community School District, and Council Bluffs Water Works
"Dallas County property tax abatement records revealed a valuation error on the abated Apple data center parcel that cost the Waukee Community School District $2.3 million and the City of Waukee $3 million in budgeted funds, while Council Bluffs municipal water records showed Google campuses consuming over 900 million gallons annually."

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

  1. (source date; the content gives no date of its own)

    24 year old apprentice became trapped beneath elevator at Google Council Bluffs data center

    [2] nonpareilonline.com

  2. · Status: running (source date; the content gives no date of its own)

    Contractor injured at Google Council Bluffs data center while repairing material lift

    [2] nonpareilonline.com

Every event in order

  • Read on September 14, 2026 (the day the page was read; it gives no date of its own)

    Google lists Google Council Bluffs data center at Council Bluffs, Iowa on its own page of data center locations, read September 14, 2026.

    [1] datacenters.google

Nearest data centers in Iowa

Verified data center records in Iowa within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
CyrusOne Council Bluffs Data Center (OCB1) Council Bluffs, Pottawattamie County 2 mi Running CyrusOne 30 MW
Edged Council Bluffs Data Center Campus (Project Lola) Council Bluffs, Pottawattamie County 4 mi Proposed Edged Energy 200 MW

Blank cell: not disclosed by any source on file.

Common questions about Google Council Bluffs Data Center Campus

Answered directly from the verified filings and local actions on this page.

Who is building Google Council Bluffs Data Center Campus?

Google is the developer. No construction contractor is named on the record yet.

How much power and water does Google Council Bluffs Data Center Campus say it needs?

Power: 350 MW (the developer's figure, datacenters.google (opens in a new tab)). Water: not disclosed by any source on file.

Where does Google Council Bluffs Data Center Campus stand today?

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Tracked project domains

Promotional domains, campaign sites, and municipal portals preserved through the Internet Archive.

Primary documents

  1. Google: Data center locations (opens in a new tab), Google, September 14, 2026

Reporting

  1. Google releases new details on elevator accident at Council Bluffs data center - Daily Nonpareil (opens in a new tab), Daily Nonpareil, August 10, 2026, news outlet

2 sources on file.

Regional grid context

This site is in the MRO West (MROW) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Google Council Bluffs Data Center Campus", https://datacenterrecord.org/projects/google-council-bluffs-data-center-ia, last verified October 27, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Google Council Bluffs Data Center Campus", https://datacenterrecord.org/projects/google-council-bluffs-data-center-ia. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Running
Tier
built from one source
Tags
Built from one source
Coordinates
41.1865, -95.8245
How the location is known
Location from the site's street address.
Location source
https://datacenters.google/locations/
Coordinate source
Iowa DNR air permit and Google Council Bluffs campus specification
Location last verified
September 14, 2026
How capacity was disclosed
the developer's figure
Capacity, if disclosed
350 MW, the developer's figure
Published
September 14, 2026
Last verified
October 27, 2026
Not disclosed
Location source number, EPA registry id, Uses, Tenancy, Cooling, How water was disclosed, How acreage was disclosed, Interconnection, Rating of the county's rows

Researcher view · Google Council Bluffs Data Center Campus · 2 sources, 3 entries · basis and source tier on every row · verified October 27, 2026

Download CSV JSON