Data Center Record.
Census GEOID: 18091 Location Precision: assessor parcel Jump to Entity & Permit Table Commercial & Bulk Data (CC BY-NC 4.0)

Last verified: · 1 primary and 1 reporting sources

● Being Built Recorded September 30, 2026 · 3 Buildings

Google Michigan City data center

Street address East US Highway 12 and Karwick Road, Michigan City, IN 46360, LaPorte County assessor parcel Exact, on the parcel [1] Google: Data center locations

Overview, regulatory gates and specifications

Google is constructing a hyperscale data center campus in Michigan City, LaPorte County, Indiana. [1] Filings on the record specify disclosed capacity of 200 MW (the developer's figure), 3 planned or operational buildings. [1] Google launched a Facebook page dedicated to its Michigan City data center for community engagement [2]

1. Land & Parcel
Parcel located
2. Local Zoning
Zoning approved
3. Tax & EDA Deal
Not yet on file
4. Utility Grid Queue
200 MW disclosed
5. Air & Water Permits
Not yet on file
What happens next: Campus is under construction; building inspections, utility energization and air permits are monitored.
Electricity Demand [1]
200 MW
the developer's figure

Equivalent to ~166,000 U.S. homes (U.S. EIA 830 homes/MW baseline) · 9.6% of Hoover Dam nameplate capacity (2,080 MW).

Grid interconnection and utility service tracked on file.

Cooling & Water
Not disclosed
Daily water volume not stated in public filings

U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.

No local property tax abatement amount disclosed in public filings.

Site & Buildings [1]
3 buildings
operator page

Assessor parcel acreage and building square footage are added when municipal or county filings are published.

Location: East US Highway 12 and Karwick Road, Michigan City, IN 46360.

Taxes & Permanent Jobs
Not disclosed
Tax and job figures not yet on file

State and local tax abatement agreements and permanent job commitments are recorded when filed.

No local property tax abatement amount disclosed in public filings.

Key specifications on the record

Power capacity
200 MW developer figure Equivalent to the continuous electricity demand of about 166,000 average U.S. homes based on U.S. Energy Information Administration residential consumption data. About 2 percent of New York City's summer peak demand in 2024.
[1] datacenters.google
Water usage
Not disclosed
Land area
Not disclosed
Buildings
3 buildings operator page
[1] datacenters.google
Backup generators
Not disclosed
Capital investment
Not disclosed
Who leads it
Google as stated by the source
Official project website
datacenters.google (opens in a new tab) verified October 28, 2026
datacenters.google (opens in a new tab)
Archived promotional websites
datacenters.google (opens in a new tab) [Wayback snapshot] (opens in a new tab) preserved in Internet Archive
tracked domains
Not disclosed
Who would use it, Jobs once it runs, Tax each year
The math behind the comparison
  1. Google Michigan City data center, capacity: 200 MW.
  2. New York City (NYISO Zone J) summer peak demand, actual, 2024: 10,245 MW (2024).
  3. 200 ÷ 10,245 = 0.02 (MW over MW).

Sources:

A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: Google · Parent: Alphabet
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for Google Michigan City data center.

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW) 200 MW the developer's figure [1] datacenters.google
Site Footprint (Acres)
Data Hall Buildings 3 buildings operator page [1] datacenters.google
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Hearings and statements on the record

May 19, 2026 La Porte, IN 5/19/26 PM UPDATE: Dallara CEO talks growth; La Porte council approves data center; USDA Deputy S... La Porte City Council 1 clip

Inside Indiana Business Radio report on La Porte City Council and community proceedings in La Porte, IN: 5/19/26 PM UPDATE: Dallara CEO talks growth; La Porte council approves data center; USDA Deputy S... (May 19, 2026).

  1. Inside Indiana Business Radio Broadcast Report Broadcast Report transcribed from local broadcast report
    "Speedway. The LaPorte City Council has given unanimous approval for the development of a second Microsoft data center. The council approved an ordinance to annex nine parcels of land totaling more than 1,000 acres for the project, as well as an ordinance to rezone the land for light industrial use. A timeline for the data center's construction is not yet known. A deteriorating motel in Petersburg that has been unused for more than 15 years"

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

  1. (content date)

    Google launched a Facebook page dedicated to its Michigan City data center for community engagement

    [2] wimsradio.com

Every event in order

  • Read on September 14, 2026 (the day the page was read; it gives no date of its own)

    Google lists Google Michigan City data center at Michigan City, Indiana on its own page of data center locations, read September 14, 2026.

    [1] datacenters.google

1 correction to this record

Every correction, with its reason
  1. · Project summary

    the record's rules: the sentence was the source's wording or carried a number not in the card's facts; written again from the article

Every correction on the record is on the corrections page.

Nearest data centers in Indiana

Verified data center records in Indiana within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
Microsoft La Porte Data Center Campus La Porte, LaPorte County 12 mi Being built Microsoft 200 MW
Amazon Web Services Project Rainier (New Carlisle) New Carlisle, St. Joseph County 21 mi Being built Amazon Web Services 2.2 GW
Amazon Web Services Hobart Data Center Campus Hobart, Lake County 26 mi Proposed Amazon Web Services 300 MW
Aunalytics South Bend Data Center (AUSB) South Bend, St. Joseph County 32 mi Running Aunalytics 4 MW
Global Access Point Union Station (South Bend) South Bend, St. Joseph County 32 mi Running Global Access Point 8 MW
Munster data center Munster, Lake County 32 mi Proposed 2 buildings

Blank cell: not disclosed by any source on file.

Common questions about Google Michigan City data center

Answered directly from the verified filings and local actions on this page.

Who is building Google Michigan City data center?

Google is the developer. No construction contractor is named on the record yet.

How much power and water does Google Michigan City data center say it needs?

Power: 200 MW (the developer's figure, datacenters.google (opens in a new tab)). Water: not disclosed by any source on file.

Where does Google Michigan City data center stand today?

It is being built; the date it reached that stage is not sourced, only the day a page was read. The newest entry, September 30, 2026: Google launched a Facebook page dedicated to its Michigan City data center for community engagement [2].

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Tracked project domains

Promotional domains, campaign sites, and municipal portals preserved through the Internet Archive.

Primary documents

  1. Google: Data center locations (opens in a new tab), Google, September 14, 2026

Reporting

  1. Michigan City shares new way for residents to connect with Google about data center project - wimsradio.com (opens in a new tab), wimsradio.com, September 30, 2026, local outlet

2 sources on file.

Regional grid context

This site is in the RFC West (RFCW) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Google Michigan City data center", https://datacenterrecord.org/projects/google-michigan-city-data-center-in, last verified October 27, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Google Michigan City data center", https://datacenterrecord.org/projects/google-michigan-city-data-center-in. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Being built
Tier
built from one source
Tags
Built from one source
Coordinates
41.7088761, -86.8691206
How the location is known
Location from the county parcel record.
Location source
https://datacenters.google/locations/
Coordinate source
Google Michigan City specification and LaPorte County parcel record
Location last verified
September 14, 2026
How capacity was disclosed
the developer's figure
Capacity, if disclosed
200 MW, the developer's figure
Published
September 14, 2026
Last verified
October 27, 2026
Not disclosed
Location source number, EPA registry id, Uses, Tenancy, Cooling, How water was disclosed, How acreage was disclosed, Interconnection, Rating of the county's rows

Researcher view · Google Michigan City data center · 2 sources, 2 entries · basis and source tier on every row · verified October 27, 2026

Download CSV JSON