Data Center Record.

Proposed Built from one source

Amazon Web Services Hobart Data Center Campus

Hobart, Lake County, INDeveloper: Amazon Web ServicesCensus GEOID 18089

Stage
Proposed
Power
300 MW
the developer's figure
Buildings
6 buildings
zoning application, verified October 27, 2026
Undisclosed in public filings
Land, Water

Amazon Web Services received municipal approval and committed to funding water and sewer infrastructure for a data center campus in Hobart, Lake County, Indiana. It is approved; the record holds no sourced date for when it reached that stage.

How much water it would use and who would use it have not been disclosed.

Last verified · 1 source, 0 primary · Built from one source, not yet reviewed in depth by a person. · How to read this page

  • This record: Proposed, ringed
  • data center
  • Smaller pins: 28 other published records in Indiana
Details
  • this record's location, ringed
  • parcel outline, from the county parcel record
  • city limits, U.S. Census Bureau, on a town level record
  • county boundary

The other pins are the published projects in the same state, each in its stage color. The imagery beneath is the USGS national orthoimagery, public domain, shown so the land around the site can be read.

How to read this page. Every fact links to the source it rests on; a number in brackets is its place in the source list. A figure no source gives reads Not disclosed, and nothing is estimated. Where sources give different figures, each is shown with who gave it, and another source's figure never stands in for the record's own. Entries are added and never overwritten; corrections are listed under What happened.

What is known

Each figure as its source gave it. The number in brackets is its place in the source list.

Buildings
6 buildings zoning application, verified October 27, 2026
Power it would draw
300 MW the developer's figure About 3 percent of New York City's summer peak demand in 2024.
Who leads it
Amazon Web Services as stated by the source
Undisclosed in public filings
Land, Water, Who would use it, Jobs once it runs, Tax each year
The math behind the comparison
  1. Amazon Web Services Hobart Data Center Campus, capacity: 300 MW.
  2. New York City (NYISO Zone J) summer peak demand, actual, 2024: 10,245 MW (2024).
  3. 300 ÷ 10,245 = 0.03 (MW over MW).

Sources:

A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).

Every field, with who said it and when (Researcher view)

Impact figures

FieldValueWho says soSourceLast verified
How much power it needs 300 MW the developer's figure cityofhobart.org (opens in a new tab) October 27, 2026
How much water it would use
How loud it would be
Jobs once it runs
Tax it would pay each year

The record's fields

FieldValueWho says soSourceLast verified
Who is building it Amazon Web Services as stated by the source October 27, 2026
Who is constructing it
How much land
Buildings 6 buildings zoning application, verified October 27, 2026 cityofhobart.org (opens in a new tab) October 27, 2026
Where its power comes from
Grid connection
How it is cooled

A blank value cell means not disclosed by any source on file; a blank basis cell means the source gave the figure without saying on what basis.

The developer's figure is what the company said; what a permit allows is the ceiling a permit sets; measured means observed. Water is in gallons a day or a year, whichever the source stated; a tax claim given as a range shows both ends, each linked to the source that gave it.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

What was decided

Acts of Lake County and Hobart about data centers, on the record with their source. A rule about the area is not a decision about this record.

DateWhoDecisionSource
Gary restrictive Mayor Eddie Melton issued an executive order pausing new data center development in Gary for one year after residents opposed the prospect of data centers indianacitizen.org (opens in a new tab)
Gary restrictive The moratorium will give the city time to evaluate how data centers could impact its electric grid, water resources, infrastructure, environment, economic development and residents' long term quality of life. nwitimes.com (opens in a new tab)
Gary restrictive Gary Mayor Eddie Melton issued an executive order establishing a one year moratorium on new data centers. nwitimes.com (opens in a new tab)

What happened

  1. · Status: proposed (content date)

    Amazon committed to funding water and sewer infrastructure for its operations in Hobart.

    [1] yahoo.com

The full Amazon Web Services Hobart Data Center Campus timeline, in order

The site

The pin is the site. The shaded outline is the parcel, from the county's own parcel record.

The site map is at the top of the page.

Where
East 61st Avenue and Colorado Street, Hobart, IN 46342, Hobart, Lake County, Indiana [source] (opens in a new tab)
How exactly it is located
Exact, on the parcel
The parcel
No parcel outline in the public record
Nearest homes
Not computed for a record placed at a place center

USGS NAIP aerial view of Amazon Web Services Hobart Data Center Campus
LAT 41.50340 / LON -87.29120 Imagery: U.S. Geological Survey / USDA NAIP (Public Domain)

Questions about this project

5 questions answered from the record

Answered from the rows on this page.

How big is Amazon Web Services Hobart Data Center Campus?

The record has 2 measures of its size: 300 MW (the developer's figure, cityofhobart.org (opens in a new tab)) and 6 buildings (zoning application, verified October 27, 2026, cityofhobart.org (opens in a new tab)). Its acreage is not disclosed.

Who is building Amazon Web Services Hobart Data Center Campus?

Amazon Web Services is the developer. No construction contractor is named on the record yet.

How much power and water does Amazon Web Services Hobart Data Center Campus say it needs?

Power: 300 MW (the developer's figure, cityofhobart.org (opens in a new tab)). Water: not disclosed by any source on file.

Where does Amazon Web Services Hobart Data Center Campus stand today?

It is approved; the date it reached that stage is not sourced, only the day a page was read. The newest entry, August 11, 2026: Amazon committed to funding water and sewer infrastructure for its operations in Hobart. [1]

What has Hobart or Lake County decided about it?

Gary (rated restrictive): Mayor Eddie Melton issued an executive order pausing new data center development in Gary for one year after residents opposed the prospect of data centers (reported September 18, 2026, indianacitizen.org (opens in a new tab)); and Gary: The moratorium will give the city time to evaluate how data centers could impact its electric grid, water resources, infrastructure, environment, economic development and residents' long term quality of life (reported September 16, 2026, nwitimes.com (opens in a new tab)). 3 events are on the county's rows; a rule about the area is not a decision about this record.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Reporting

  1. Community benefits, not moratoriums, should guide Indiana’s debate on data centers - Indiana Capital Chronicle (opens in a new tab), Indiana Capital Chronicle, August 11, 2026, query feed

1 source on file.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Amazon Web Services Hobart Data Center Campus", https://datacenterrecord.org/projects/amazon-hobart-data-center-in, last verified October 27, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Amazon Web Services Hobart Data Center Campus", https://datacenterrecord.org/projects/amazon-hobart-data-center-in. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Proposed
Tier
built from one source
Tags
Built from one source
Coordinates
41.5034, -87.2912
How the location is known
Location from the county parcel record.
Location source
https://www.cityofhobart.org/
Coordinate source
City of Hobart zoning and infrastructure approval record
How capacity was disclosed
the developer's figure
Capacity, if disclosed
300 MW, the developer's figure
Rating of the county's rows
Restrictive
Published
September 28, 2026
Last verified
October 27, 2026
Undisclosed in public filings
Location source number, Location last verified, EPA registry id, Uses, Tenancy, Cooling, How water was disclosed, How acreage was disclosed, Interconnection

Researcher view · Amazon Web Services Hobart Data Center Campus · 1 source, 1 entry, 3 decisions nearby · basis and source tier on every row · verified October 27, 2026

Download CSV JSON