Data Center Record.

Proposed Built from one source

Amazon Web Services Wheatfield Data Center Campus (Project Rise)

Wheatfield, Jasper County, INDeveloper: Amazon Web ServicesCensus GEOID 18073

Stage
Proposed
Power
500 MW
the developer's figure
Buildings
9 buildings
zoning application, verified October 27, 2026
Undisclosed in public filings
Land, Water

Jasper County officials approved Project Rise, a nine building Amazon Web Services data center campus in Wheatfield, Jasper County, Indiana. It is approved; the record holds no sourced date for when it reached that stage.

How much water it would use and who would use it have not been disclosed.

Last verified · 4 sources, 0 primary · Built from one source, not yet reviewed in depth by a person. · How to read this page

  • This record: Proposed, ringed
  • data center
  • Smaller pins: 28 other published records in Indiana
Details
  • this record's location, ringed
  • parcel outline, from the county parcel record
  • city limits, U.S. Census Bureau, on a town level record
  • county boundary

The other pins are the published projects in the same state, each in its stage color. The imagery beneath is the USGS national orthoimagery, public domain, shown so the land around the site can be read.

How to read this page. Every fact links to the source it rests on; a number in brackets is its place in the source list. A figure no source gives reads Not disclosed, and nothing is estimated. Where sources give different figures, each is shown with who gave it, and another source's figure never stands in for the record's own. Entries are added and never overwritten; corrections are listed under What happened.

What is known

Each figure as its source gave it. The number in brackets is its place in the source list.

Buildings
9 buildings zoning application, verified October 27, 2026
Power it would draw
500 MW the developer's figure About 5 percent of New York City's summer peak demand in 2024.
Who leads it
Amazon Web Services as stated by the source
Undisclosed in public filings
Land, Water, Who would use it, Jobs once it runs, Tax each year
The math behind the comparison
  1. Amazon Web Services Wheatfield Data Center Campus (Project Rise), capacity: 500 MW.
  2. New York City (NYISO Zone J) summer peak demand, actual, 2024: 10,245 MW (2024).
  3. 500 ÷ 10,245 = 0.05 (MW over MW).

Sources:

A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).

Every field, with who said it and when (Researcher view)

Impact figures

FieldValueWho says soSourceLast verified
How much power it needs 500 MW the developer's figure jaspercountyin.gov (opens in a new tab) October 27, 2026
How much water it would use
How loud it would be
Jobs once it runs
Tax it would pay each year

The record's fields

FieldValueWho says soSourceLast verified
Who is building it Amazon Web Services as stated by the source October 27, 2026
Who is constructing it
How much land
Buildings 9 buildings zoning application, verified October 27, 2026 jaspercountyin.gov (opens in a new tab) October 27, 2026
Where its power comes from
Grid connection
How it is cooled

A blank value cell means not disclosed by any source on file; a blank basis cell means the source gave the figure without saying on what basis.

The developer's figure is what the company said; what a permit allows is the ceiling a permit sets; measured means observed. Water is in gallons a day or a year, whichever the source stated; a tax claim given as a range shows both ends, each linked to the source that gave it.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

What happened

  1. · Status: proposed (content date)

    Amazon plans a nine building data center campus in Wheatfield, Jasper County, Indiana.

    jaspercountyin.gov (opens in a new tab) query feed

The full Amazon Web Services Wheatfield Data Center Campus (Project Rise) timeline, in order

The site

The pin is the site. The shaded outline is the parcel, from the county's own parcel record.

The site map is at the top of the page.

Where
North State Road 49 and West 1100 North, Wheatfield, IN 46392, Wheatfield, Jasper County, Indiana [source] (opens in a new tab)
How exactly it is located
Exact, on the parcel
The parcel
No parcel outline in the public record
Nearest homes
Not computed for a record placed at a place center

USGS NAIP aerial view of Amazon Web Services Wheatfield Data Center Campus (Project Rise)
LAT 41.19110 / LON -87.05310 Imagery: U.S. Geological Survey / USDA NAIP (Public Domain)

Questions about this project

5 questions answered from the record

Answered from the rows on this page.

How big is Amazon Web Services Wheatfield Data Center Campus (Project Rise)?

The record has 2 measures of its size: 500 MW (the developer's figure, jaspercountyin.gov (opens in a new tab)) and 9 buildings (zoning application, verified October 27, 2026, jaspercountyin.gov (opens in a new tab)). Its acreage is not disclosed.

Who is building Amazon Web Services Wheatfield Data Center Campus (Project Rise)?

Amazon Web Services is the developer. No construction contractor is named on the record yet.

How much power and water does Amazon Web Services Wheatfield Data Center Campus (Project Rise) say it needs?

Power: 500 MW (the developer's figure, jaspercountyin.gov (opens in a new tab)). Water: not disclosed by any source on file.

Where does Amazon Web Services Wheatfield Data Center Campus (Project Rise) stand today?

It is approved; the date it reached that stage is not sourced, only the day a page was read. The newest entry, June 3, 2026: Amazon plans a nine building data center campus in Wheatfield, Jasper County, Indiana.

What has Wheatfield or Jasper County decided about it?

No decision by Wheatfield or Jasper County about data centers is on the record. The Jasper County page and the Indiana scorecard list every rated row the day a person publishes one.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Reporting

  1. Officials approve Jasper County Amazon data center - Northwest Indiana Business Magazine (opens in a new tab), Northwest Indiana Business Magazine, June 18, 2026, query feed
  2. Amazon's Project Rise data center clears final hurdle - Newsbug.info (opens in a new tab), Newsbug.info, June 23, 2026, query feed
  3. The Indiana community caught between coal and the data center boom - Canary Media (opens in a new tab), Canary Media, May 14, 2026, query feed
  4. Amazon plans nine-building data center campus in Wheatfield, Indiana - Data Center Dynamics (opens in a new tab), Data Center Dynamics, June 3, 2026, query feed

4 sources on file.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Amazon Web Services Wheatfield Data Center Campus (Project Rise)", https://datacenterrecord.org/projects/amazon-wheatfield-data-center-campus-in, last verified October 27, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Amazon Web Services Wheatfield Data Center Campus (Project Rise)", https://datacenterrecord.org/projects/amazon-wheatfield-data-center-campus-in. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Proposed
Tier
built from one source
Tags
Built from one source
Coordinates
41.1911, -87.0531
How the location is known
Location from the county parcel record.
Location source
https://www.jaspercountyin.gov/
Coordinate source
Jasper County Project Rise approval record
How capacity was disclosed
the developer's figure
Capacity, if disclosed
500 MW, the developer's figure
Published
September 29, 2026
Last verified
October 27, 2026
Undisclosed in public filings
Location source number, Location last verified, EPA registry id, Uses, Tenancy, Cooling, How water was disclosed, How acreage was disclosed, Interconnection, Rating of the county's rows

Researcher view · Amazon Web Services Wheatfield Data Center Campus (Project Rise) · 4 sources, 1 entry, 0 decisions nearby · basis and source tier on every row · verified October 27, 2026

Download CSV JSON