Munster data center

A data center was proposed in Munster, Indiana, drawing opposition from local residents. It is reported, as reported July 14, 2026.

How much power it needs, how much water it would use and who would use it have not been disclosed.

Last verified · 2 sources, 0 primary · A skeleton record: built from one source, not yet reviewed in depth by a person. · How to read this page

How to read this page. Every fact links to the source it rests on; a number in brackets is its place in the source list. A figure no source gives reads Not disclosed, and nothing is estimated. Where sources give different figures, each is shown with who gave it, and another source's figure never stands in for the record's own. Entries are added and never overwritten; corrections are listed under What happened.

What is known

Each figure as its source gave it. The number in brackets is its place in the source list.

Land
Not disclosed
Power it would draw
Not disclosed
Water
Not disclosed
Who leads it
Not disclosed
Who would use it
Not disclosed
Jobs once it runs
Not disclosed
Tax each year
Not disclosed
Every field, with who said it and when (Researcher view)

Impact figures

FieldValueWho says soSourceLast verified
How much power it needs Not disclosed
How much water it would use Not disclosed
How loud it would be Not disclosed
Jobs once it runs Not disclosed
Tax it would pay each year Not disclosed

The record's fields

FieldValueWho says soSourceLast verified
Who is building it Not disclosed
Who is constructing it Not disclosed
How much land Not disclosed
Where its power comes from Not disclosed
Grid connection Not disclosed
How it is cooled Not disclosed

The developer's figure is what the company said; what a permit allows is the ceiling a permit sets; measured means observed. Water is in gallons a day or a year, whichever the source stated; a tax claim given as a range shows both ends, each linked to the source that gave it.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water useA state water right filing or a water supply agreement.
  • Who would use itA lease announcement or a tenant named in a filing.
  • Power the campus would drawA utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Who is behind itA land record, a zoning application or a company's own announcement.
  • Jobs and taxAn incentive agreement, a county's economic development filing or a fiscal note.

What was decided

Acts of Lake County and Munster about data centers, on the record with their source. A rule about the area is not a decision about this record.

DateWhoDecisionSource
Gary Mayor Eddie Melton issued an executive order pausing new data center development in Gary for one year after residents opposed the prospect of data centers indianacitizen.org
Gary The moratorium will give the city time to evaluate how data centers could impact its electric grid, water resources, infrastructure, environment, economic development and residents' long term quality of life. nwitimes.com
Gary Gary Mayor Eddie Melton issued an executive order establishing a one year moratorium on new data centers. nwitimes.com

What happened

  1. · Status: rumored (source date; the content gives no date of its own)

    A data center was proposed in Munster, Indiana, drawing resident opposition [2]

The full Munster data center timeline, in order

1 correction to this record

Every correction, with its reason
  1. · the kind of source of a history entry

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of 2026-09-23). The link did not change. The day's label corrections.

Every correction on the record is on the corrections page.

The site

Where in Lake County is not in the public record. The pin marks the county seat, not a building, and the outline is the county.

  • This record: Proposed, ringed
  • data center
  • Dashed edge: the exact site is not in the public record
  • Smaller pins: 10 other published records in Indiana
Details
  • this record's location, ringed
  • parcel outline, from the county parcel record
  • city limits, U.S. Census Bureau, on a town level record
  • county boundary

The other pins are the published projects in the same state, each in its stage color. The imagery beneath is the USGS national orthoimagery, public domain, shown so the land around the site can be read.

Where
Munster, Lake County, Indiana
How exactly it is located
County level, the county seat
The parcel
No parcel outline in the public record
Nearest homes
Not computed for a record placed at a place center
Nearest records
Nearest records are not computed for a record placed at a county seat.

Questions about this project

4 questions answered from the record

Answered from the rows on this page.

Who is building Munster data center?

Not disclosed. No source on file names the developer. The sources read for this record are listed under Sources.

How much power and water does Munster data center say it needs?

Power: not disclosed by any source on file. Water: not disclosed by any source on file.

Where does Munster data center stand today?

It is reported, as reported July 14, 2026. The newest entry, reported July 14, 2026: A data center was proposed in Munster, Indiana, drawing resident opposition [2].

What has Munster or Lake County decided about it?

Gary: Mayor Eddie Melton issued an executive order pausing new data center development in Gary for one year after residents opposed the prospect of data centers (reported September 18, 2026, source); and Gary: The moratorium will give the city time to evaluate how data centers could impact its electric grid, water resources, infrastructure, environment, economic development and residents' long term quality of life. (reported September 16, 2026, source). 3 events are on the county's rows; a rule about the area is not a decision about this record.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Reporting

  1. More than 1,000 Munster residents signed a petition and some attended a Plan Commission meeting to protest a proposed data center at the former 150-acre Lansing Country Club site. Read more: https://wgntv.com/northwest-indiana/munster-residents-prote, www.facebook.com, July 14, 2026, local outlet
  2. Munster residents push back against proposed data center - WGN-TV, WGN-TV, July 14, 2026, local outlet

2 sources on file.

Cite this record

Data Center Record, "Munster data center", https://datacenterrecord.org/projects/munster-data-center-in, last verified September 17, 2026.

Last verified , first recorded . Every correction is logged on the corrections page and under What happened.

Cite this page

Data Center Record, "Munster data center", https://datacenterrecord.org/projects/munster-data-center-in. Data: Data Center Record, datacenterrecord.org, CC BY 4.0.

The structured rows are CC BY 4.0. Link to this page; that is what turns a reuse into a citation. Prose stays under copyright.

Report a change
For researchers
Slug
munster-data-center-in
Status value
rumored
Stage
Proposed
Tier
skeleton
Tags
skeleton
Place id
us/in/lake-county/munster
Coordinates
41.42167, -87.35611
Location precision
county
Location source
County seat (Crown Point), Wikidata, placed at county level
Coordinate source
wikidata county seat
Location source number
Not disclosed
Location last verified
September 16, 2026
EPA registry id
Not disclosed
Use type values
not_disclosed
Tenancy value
not_disclosed
Cooling type value
not_disclosed
Capacity basis
not_disclosed
Water basis
not_disclosed, gallons_per_day
Acreage basis
Not disclosed
Interconnection value
not_disclosed
Capacity, if disclosed
Not disclosed
Rating of the county's rows
Not disclosed
Published
2026-09-04
Last verified
2026-09-17