Amazon Web Services Project Rainier (New Carlisle)

New Carlisle, St. Joseph County, INDeveloper: Amazon Web ServicesCensus GEOID 18141

Stage
Being built
Power
2.2 GW
the developer's figure
Buildings
16 buildings
operator page, verified October 27, 2026
Undisclosed in public filings
Land, Water

Amazon Web Services is constructing Project Rainier, a 1,200 acre, 16 building, 2,200 megawatt AI data center campus along Edison Road near New Carlisle in St. Joseph County, Indiana. It is being built; the record holds no sourced date for when it reached that stage.

How much water it would use and who would use it have not been disclosed.

1 hearing on the record, 2025

Last verified · 7 sources, 0 primary · Built from one source, not yet reviewed in depth by a person. · How to read this page

  • This record: Being built, ringed
  • data center
  • Smaller pins: 28 other published records in Indiana
Details
  • this record's location, ringed
  • parcel outline, from the county parcel record
  • city limits, U.S. Census Bureau, on a town level record
  • county boundary

The other pins are the published projects in the same state, each in its stage color. The imagery beneath is the USGS national orthoimagery, public domain, shown so the land around the site can be read.

How to read this page. Every fact links to the source it rests on; a number in brackets is its place in the source list. A figure no source gives reads Not disclosed, and nothing is estimated. Where sources give different figures, each is shown with who gave it, and another source's figure never stands in for the record's own. Entries are added and never overwritten; corrections are listed under What happened.

What is known

Each figure as its source gave it. The number in brackets is its place in the source list.

Buildings
16 buildings operator page, verified October 27, 2026
Power it would draw
2.2 GW the developer's figure About 0.21 times New York City's summer peak demand in 2024.
Who leads it
Amazon Web Services as stated by the source
Undisclosed in public filings
Land, Water, Who would use it, Jobs once it runs, Tax each year
The math behind the comparison
  1. Amazon Web Services Project Rainier (New Carlisle), capacity: 2,200 MW.
  2. New York City (NYISO Zone J) summer peak demand, actual, 2024: 10,245 MW (2024).
  3. 2,200 ÷ 10,245 = 0.21 (MW over MW).

Sources:

A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).

Every field, with who said it and when (Researcher view)

Impact figures

FieldValueWho says soSourceLast verified
How much power it needs 2.2 GW the developer's figure aboutamazon.com (opens in a new tab) October 27, 2026
How much water it would use
How loud it would be
Jobs once it runs
Tax it would pay each year

The record's fields

FieldValueWho says soSourceLast verified
Who is building it Amazon Web Services as stated by the source October 27, 2026
Who is constructing it
How much land
Buildings 16 buildings operator page, verified October 27, 2026 aboutamazon.com (opens in a new tab) October 27, 2026
Where its power comes from
Grid connection
How it is cooled

A blank value cell means not disclosed by any source on file; a blank basis cell means the source gave the figure without saying on what basis.

The developer's figure is what the company said; what a permit allows is the ceiling a permit sets; measured means observed. Water is in gallons a day or a year, whichever the source stated; a tax claim given as a range shows both ends, each linked to the source that gave it.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

What was decided

Acts of St. Joseph County and New Carlisle about data centers, on the record with their source. A rule about the area is not a decision about this record.

DateWhoDecisionSource
St. Joseph County St. Joseph County Council is discussing developing a ban on data centers coming to the county. wsbt.com (opens in a new tab)
South Bend case by case South Bend's public works director Eric Horvath and city engineer Kara Boyles signed NDAs with Amazon in 2023 lpm.org (opens in a new tab)
South Bend case by case The proposed bill is set for first reading on September 28, 2026 lpm.org (opens in a new tab)
South Bend case by case South Bend Common Council members Oliver Davis Jr. and Sherry Bolden Simpson filed a bill banning NDAs about data centers lpm.org (opens in a new tab)
South Bend case by case South Bend Mayor James Mueller issued an executive order banning city staff from signing non disclosure agreements about data centers on September 16, 2026 lpm.org (opens in a new tab)
St. Joseph County Republican council members proposed a temporary moratorium on new data center projects in St. Joseph County wsbt.com (opens in a new tab)
1 earlier decision on the county's rows
DateWhoDecisionSource
St. Joseph County St. Joseph County leaders debated a two year data center moratorium wvpe.org (opens in a new tab)
December 10, 2025 South Bend, IN St. Joseph County Council New Carlisle Data Center Rezoning Hearing St. Joseph County Council 3clips

Ahead of the December 10, 2025 St. Joseph County Council rezoning decision near New Carlisle, community and faith groups testified against converting additional prime agricultural land for a third large scale data center campus.

  1. Resident public comment Resident Public Comment auto captions, unchecked
    "we've made our fair share commitment to two with two data centers. A pause. We want a vote. No, we want a no vote tonight, which is large enough and bipartisan that they will not probably try to set up in this county. >> One concern the group has is water usage. They claim the county would set a limit, but they are unsure about that limit. The other concern the group worries about is electricity rates that"
  2. Resident public comment Resident Public Comment auto captions, unchecked
    "to their proximity of the project. >> As he also mentioned, the electric rates will skyrocket. Our rates have already gone up 17 and a.5% over the past 12 months in Indiana and they're going to go up even more. >> St. Joseph County Commissioner Raphael Morton told WSBT22 that AE has told the county and city officials that residential electric bills and water use will not increase. >> We've had experts come in to talk about"
  3. St. Joseph County Council Member Elected Official auto captions, unchecked
    "that the water usage will not affect the residents in our county. Thanks for watching. Here's another story you may like and subscribe to the WSBT22 YouTube channel."

What happened

  1. · Status: running (content date)

    Amazon Web Services Project Rainier is a 1,200 acre AI data center campus near New Carlisle that began construction in 2024, is now partially operational, and expects up to 2,200 MW peak power demand when fully built out.

    [1] therepublic.com

The full Amazon Web Services Project Rainier (New Carlisle) timeline, in order

The site

The pin is the site's address.

The site map is at the top of the page.

Where
31000 Edison Road, New Carlisle, IN 46552, New Carlisle, St. Joseph County, Indiana [source] (opens in a new tab)
How exactly it is located
Exact, at the address
The parcel
No parcel outline in the public record
Nearest homes
Not computed for a record placed at a place center

USGS NAIP aerial view of Amazon Web Services Project Rainier (New Carlisle)
LAT 41.69820 / LON -86.45260 Imagery: U.S. Geological Survey / USDA NAIP (Public Domain)

Regulatory and planning exhibits

Primary municipal filings, air quality permits, and zoning documents on record.

Questions about this project

5 questions answered from the record

Answered from the rows on this page.

How big is Amazon Web Services Project Rainier (New Carlisle)?

The record has 2 measures of its size: 2.2 GW (the developer's figure, aboutamazon.com (opens in a new tab)) and 16 buildings (operator page, verified October 27, 2026, aboutamazon.com (opens in a new tab)). Its acreage is not disclosed.

Who is building Amazon Web Services Project Rainier (New Carlisle)?

Amazon Web Services is the developer. No construction contractor is named on the record yet.

How much power and water does Amazon Web Services Project Rainier (New Carlisle) say it needs?

Power: 2.2 GW (the developer's figure, aboutamazon.com (opens in a new tab)). Water: not disclosed by any source on file.

Where does Amazon Web Services Project Rainier (New Carlisle) stand today?

It is being built; the date it reached that stage is not sourced, only the day a page was read. The newest entry, July 14, 2026: Amazon Web Services Project Rainier is a 1,200 acre AI data center campus near New Carlisle that began construction in 2024, is now partially operational, and expects up to 2,200 MW peak power demand when fully built out. [1]

What has New Carlisle or St. Joseph County decided about it?

St. Joseph County: St. Joseph County Council is discussing developing a ban on data centers coming to the county (reported September 22, 2026, wsbt.com (opens in a new tab)); and South Bend (rated case by case): South Bend's public works director Eric Horvath and city engineer Kara Boyles signed NDAs with Amazon in 2023 (reported September 20, 2026, lpm.org (opens in a new tab)). 7 events are on the county's rows; a rule about the area is not a decision about this record.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Tracked project domains

Promotional domains, campaign sites, and municipal portals preserved through the Internet Archive.

Reporting

  1. Data center of attention: What can other communities learn from New Carlisle? - The Statehouse File (opens in a new tab), The Statehouse File, July 14, 2026, query feed
  2. NiSource Capex Plan Soars 45%, Driven Largely by Planned Data Cen... - industrialinfo.com (opens in a new tab), industrialinfo.com, January 2, 2026, query feed
  3. St. Joseph County leaders push for third New Carlisle data center ahead of Tuesday vote - WNDU (opens in a new tab), WNDU, December 8, 2025, query feed
  4. IURC approves American Electric’s I&M for large load tariff settlement - Power Technology (opens in a new tab), Power Technology, February 20, 2025, query feed
  5. Data centers are choosing Indiana. Is the state’s electricity supply ready? - indianacapitalchronicle.com (opens in a new tab), indianacapitalchronicle.com, June 10, 2024, query feed
  6. Indiana Approves NiSource-Amazon Data Center Agreements as State Positions for Large-Scale Growth - Construction Review (opens in a new tab), Construction Review, June 26, 2026, query feed
  7. IURC Approves Key Agreements for Data Center Development in Northern Indiana - buildingindiana.com (opens in a new tab), buildingindiana.com, July 6, 2026, query feed

7 sources on file.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Amazon Web Services Project Rainier (New Carlisle)", https://datacenterrecord.org/projects/amazon-web-services-project-rainier-new-carlisle-in, last verified October 27, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Amazon Web Services Project Rainier (New Carlisle)", https://datacenterrecord.org/projects/amazon-web-services-project-rainier-new-carlisle-in. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Being built
Tier
built from one source
Tags
Built from one source
Coordinates
41.6982, -86.4526
How the location is known
Location from the site's street address.
Location source
https://www.aboutamazon.com/news/company-news/amazon-15-billion-indiana-data-centers
Coordinate source
Amazon Web Services Project Rainier New Carlisle specification and St. Joseph County parcel record
How capacity was disclosed
the developer's figure
Capacity, if disclosed
2.2 GW, the developer's figure
Rating of the county's rows
Case by case
Published
September 28, 2026
Last verified
October 27, 2026
Undisclosed in public filings
Location source number, Location last verified, EPA registry id, Uses, Tenancy, Cooling, How water was disclosed, How acreage was disclosed, Interconnection