Meta's data center campus in Prineville has 11 buildings totaling 4.6 million square feet, first began construction in 2010, has expanded multiple times, and represents approximately $2 billion in investment, with Milestone Technologies laying off 66 workers there on June 28, 2026 due to contract expiration. [1] Vitesse, LLC was a party to the Pacific Power data center tariff case (Docket UE 463) and did not oppose the settlement the Oregon PUC adopted on November 13, 2026. [4]
U.S. EIA residential equivalence (~830 homes per MW) will compute automatically once a permit or filing states facility megawatts.
Utility interconnection queue filings monitored.
U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.
No local property tax abatement amount disclosed in public filings.
Assessor parcel acreage and building square footage are added when municipal or county filings are published.
Location: 735 SW Connect Way, Prineville, OR 97754.
State and local tax abatement agreements and permanent job commitments are recorded when filed.
No local property tax abatement amount disclosed in public filings.
Connected government officials, corporate entities, utilities and local rules on the public record.
Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.
Disclosed engineering ceilings, reported actuals and primary regulatory basis for Meta Prineville Data Center Campus.
| Field / Parameter | Disclosed Ceiling | Reported Actual | Basis & Primary Source |
|---|---|---|---|
| Electrical Capacity (MW) | |||
| Site Footprint (Acres) | |||
| Data Hall Buildings | 11 buildings | 11 | operator page [1] datacenters.atmeta.com |
| Cooling & Water System | |||
| Backup Diesel / Gas Generators | 187 units (545.73 MW) | what a permit allows [2] deqonline.deq.state.or.us | |
| Tax Abatement & Annual Revenue |
Blank cell: not disclosed by any source on file.
The record adds each the day a source gives it. Why these documents.
Chronological regulatory, corporate and permitting events on the record, newest first.
(content date)
Vitesse, LLC was a party to the Pacific Power data center tariff case (Docket UE 463) and did not oppose the settlement the Oregon PUC adopted on November 13, 2026.
· Status: running (content date, the month only; the source names no day)
Facebook, now Meta, said in its registration statement filed with the SEC on March 27, 2012 that in April 2011 it began serving user traffic out of its first owned and built data center, in Prineville, Oregon.
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.
Every correction on the record is on the corrections page.
Verified data center records in Oregon within 60 miles by straight line distance.
| Facility & Location | Distance | Stage | Operator / Tenant | Disclosed Scale |
|---|---|---|---|---|
| Apple Prineville Data Center Campus Prineville, Crook County | Less than 1 mi | Running | Apple | 3 buildings |
| US Signal Bend Data Center (OR01) Bend, Deschutes County | 24 mi | Running | US Signal | 1 building |
| Boxminer.io La Pine Industrial Park La Pine, Deschutes County | 52 mi | Stalled or cancelled | Boxminer.io | 20 MW |
Blank cell: not disclosed by any source on file.
Answered directly from the verified filings and local actions on this page.
Meta is the developer, datacenters.atmeta.com (opens in a new tab). No construction contractor is named on the record yet.
Power: not disclosed by any source on file. Water: not disclosed by any source on file.
Official operator or facility campus page verified in 50 state website discovery pass.
11 sources on file.
This site is in the Northwest Power Pool (NWPP) regional power market.
Every number on this page comes from a named source. Click any source to open the document in a new tab.
If a link has moved or a document has changed, let us know and we will update the record and log the change.
Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.
Data Center Record. Meta Prineville Data Center Campus. Last verified November 13, 2026. https://datacenterrecord.org/projects/meta-prineville-campus-or. Accessed November 22, 2026.
Every row on this page is available to download with its source, its basis and the date it was last verified.
Download this page's records (CSV) JSON
Licensed CC BY-NC 4.0. Say where it came from and do not sell it or use it to train a commercial model without a license.
Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.
Data Center Record takes no money from data center developers, operators, utilities or trade groups. That rule does not change for licensing.
Data Center Record is an independent project and takes no money from data center developers, operators, utilities or trade groups. Reader support keeps the record free to read, with no ads and no paywall.
Last verified , first recorded . Every correction is logged on the corrections page and under What happened. Report a correction · Send a tip about Meta Prineville Data Center Campus
Data Center Record, "Meta Prineville Data Center Campus", https://datacenterrecord.org/projects/meta-prineville-campus-or. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.
The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.