● Running Recorded April 1, 2011 · 11 Buildings

Meta Prineville Data Center Campus

Street address 735 SW Connect Way, Prineville, OR 97754, Crook County verified address Exact, at the address [1] Meta: Our U.S. data center fleet

Overview, regulatory gates and specifications

Meta's data center campus in Prineville has 11 buildings totaling 4.6 million square feet, first began construction in 2010, has expanded multiple times, and represents approximately $2 billion in investment, with Milestone Technologies laying off 66 workers there on June 28, 2026 due to contract expiration. [1] Vitesse, LLC was a party to the Pacific Power data center tariff case (Docket UE 463) and did not oppose the settlement the Oregon PUC adopted on November 13, 2026. [4]

1. Land & Parcel
Parcel located
2. Local Zoning
Zoning approved
3. Tax & EDA Deal
Not yet on file
4. Utility Grid Queue
Energized
5. Air & Water Permits
187 generators permitted
What happens next: Facility is operational; air permit compliance, water reporting and utility filings are monitored.
Electricity Demand
Not disclosed
No MW figure in public filings yet

U.S. EIA residential equivalence (~830 homes per MW) will compute automatically once a permit or filing states facility megawatts.

Utility interconnection queue filings monitored.

Cooling & Water
Not disclosed
Daily water volume not stated in public filings

U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.

No local property tax abatement amount disclosed in public filings.

Site & Buildings [1]
11 buildings
operator page

Assessor parcel acreage and building square footage are added when municipal or county filings are published.

Location: 735 SW Connect Way, Prineville, OR 97754.

Taxes & Permanent Jobs
Not disclosed
Tax and job figures not yet on file

State and local tax abatement agreements and permanent job commitments are recorded when filed.

No local property tax abatement amount disclosed in public filings.

Key specifications on the record

Power capacity
Not disclosed
Water usage
Not disclosed
Land area
Not disclosed
Buildings
11 buildings operator page
[1] datacenters.atmeta.com
Backup generators
187 generators (545.73 MW) permitted
[2] deqonline.deq.state.or.us
Capital investment
Not disclosed
Commissioned
Operational since 2011 (15 years)
Who leads it
Meta attributed via corporate HQ or property filing
[1] datacenters.atmeta.com
Permitted legal entity
Vitesse, LLC what a permit allows
[2] deqonline.deq.state.or.us [1] datacenters.atmeta.com
State air permit registration
07-0037, 07-0037-ST-01 state air permit register
[2] deqonline.deq.state.or.us
Not disclosed
Who would use it, Jobs once it runs, Tax each year

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: Meta · Applicant / Shell LLC: Vitesse, LLC
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for Meta Prineville Data Center Campus.

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW)
Site Footprint (Acres)
Data Hall Buildings 11 buildings 11 operator page [1] datacenters.atmeta.com
Cooling & Water System
Backup Diesel / Gas Generators 187 units (545.73 MW) what a permit allows [2] deqonline.deq.state.or.us
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Power the campus would draw A utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

  1. (content date)

    Vitesse, LLC was a party to the Pacific Power data center tariff case (Docket UE 463) and did not oppose the settlement the Oregon PUC adopted on November 13, 2026.

    [4] apps.puc.state.or.us

  2. · Status: running (content date, the month only; the source names no day)

    Facebook, now Meta, said in its registration statement filed with the SEC on March 27, 2012 that in April 2011 it began serving user traffic out of its first owned and built data center, in Prineville, Oregon.

    [5] sec.gov

Every event in order

1 correction to this record

Every correction, with its reason
  1. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

Every correction on the record is on the corrections page.

Nearest data centers in Oregon

Verified data center records in Oregon within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
Apple Prineville Data Center Campus Prineville, Crook County Less than 1 mi Running Apple 3 buildings
US Signal Bend Data Center (OR01) Bend, Deschutes County 24 mi Running US Signal 1 building
Boxminer.io La Pine Industrial Park La Pine, Deschutes County 52 mi Stalled or cancelled Boxminer.io 20 MW

Blank cell: not disclosed by any source on file.

Common questions about Meta Prineville Data Center Campus

Answered directly from the verified filings and local actions on this page.

Who is building Meta Prineville Data Center Campus?

Meta is the developer, datacenters.atmeta.com (opens in a new tab). No construction contractor is named on the record yet.

How much power and water does Meta Prineville Data Center Campus say it needs?

Power: not disclosed by any source on file. Water: not disclosed by any source on file.

Where does Meta Prineville Data Center Campus stand today?

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Tracked project domains

Promotional domains, campaign sites, and municipal portals preserved through the Internet Archive.

Primary documents

  1. Meta: Our U.S. data center fleet (opens in a new tab), Meta, September 14, 2026
  2. Oregon DEQ Standard ACDP (OAR 340-216) 07-0037-ST-01 (Vitesse, LLC - Vitesse, LLC) (opens in a new tab), Oregon Department of Environmental Quality, July 19, 2024
  3. Oregon DEQ Permit Review Report 07-0037-ST-01 (Vitesse, LLC - Vitesse, LLC) (opens in a new tab), Oregon Department of Environmental Quality, July 19, 2024
  4. Oregon regulators approve Pacific Power's data center tariff under the POWER Act (opens in a new tab), Oregon Public Utility Commission, November 13, 2026
  5. Facebook, Inc. registration statement, Amendment No. 3, filed March 27, 2012 (opens in a new tab), Facebook, Inc., March 27, 2012

Reporting

  1. 3rd Facebook Data Center For Prineville Likely - Oregon Public Broadcasting - OPB (opens in a new tab), OPB (via Google News), August 26, 2015, local outlet
  2. Facebook To Build 3rd Data Center In Prineville - Oregon Public Broadcasting - OPB (opens in a new tab), OPB (via Google News), September 1, 2015, local outlet
  3. Facebook grows in Oregon with data center, fiber-optic cable - Oregon Public Broadcasting - OPB (opens in a new tab), OPB (via Google News), March 21, 2021, local outlet
  4. Prineville data center with connection to Meta will lay off 66 - Oregon Public Broadcasting - OPB (opens in a new tab), OPB (via Google News), April 30, 2026, local outlet
  5. Data Centers Boost Prineville's Economy, But Not Without Growing Pains - Oregon Public Broadcasting - OPB (opens in a new tab), OPB (via Google News), April 9, 2017, local outlet
  6. Prineville Wants More Out of Its Next Data Center Deal - The Source - Bend, Oregon (opens in a new tab), Bend, Oregon, June 30, 2026, news outlet

11 sources on file.

Regional grid context

This site is in the Northwest Power Pool (NWPP) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Meta Prineville Data Center Campus", https://datacenterrecord.org/projects/meta-prineville-campus-or, last verified November 13, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Meta Prineville Data Center Campus", https://datacenterrecord.org/projects/meta-prineville-campus-or. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Running
Tier
built from one source
Tags
Built from one source
Coordinates
44.2842, -120.8924
How the location is known
Location from the site's street address.
Location source
https://datacenters.atmeta.com/us-locations/
Coordinate source
Meta Prineville Data Center campus specification and Crook County Assessor parcel record
Location last verified
September 16, 2026
Published
September 4, 2026
Last verified
November 13, 2026
Not disclosed
Location source number, EPA registry id, Uses, Tenancy, Cooling, How capacity was disclosed, How water was disclosed, How acreage was disclosed, Interconnection, Capacity, if disclosed, Rating of the county's rows

Researcher view · Meta Prineville Data Center Campus · 11 sources, 2 entries · basis and source tier on every row · verified November 13, 2026

Download CSV JSON