● Running Recorded May 1, 2012 · 3 Buildings

Apple Prineville Data Center Campus

Street address 1600 SW Baldwin Dr, Prineville, OR 97754, Crook County permit coordinates Exact, the point of the EPA's facility record [1] EPA ECHO detailed facility report: Apple Data Center

Overview, regulatory gates and specifications

Apple operates a large data center campus in Prineville, Oregon, benefiting from Long Term Rural Enterprise Zone tax exemptions that are nearing expiration. [1] Filings on the record specify 3 planned or operational buildings. [2] Apple has already begun work on a 10,000 square foot facility featuring modular data centers [7]

1. Land & Parcel
Parcel located
2. Local Zoning
Zoning approved
3. Tax & EDA Deal
Incentive review
4. Utility Grid Queue
Energized
5. Air & Water Permits
43 generators permitted
What happens next: Facility is operational; air permit compliance, water reporting and utility filings are monitored.
Electricity Demand
Not disclosed
No MW figure in public filings yet

U.S. EIA residential equivalence (~830 homes per MW) will compute automatically once a permit or filing states facility megawatts.

Utility interconnection queue filings monitored.

Cooling & Water
Not disclosed
Daily water volume not stated in public filings

U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.

No local property tax abatement amount disclosed in public filings.

Site & Buildings [2]
3 buildings
operator page

Assessor parcel acreage and building square footage are added when municipal or county filings are published.

Location: 1600 SW Baldwin Dr, Prineville, OR 97754.

Taxes & Permanent Jobs
Not disclosed
Tax and job figures not yet on file

State and local tax abatement agreements and permanent job commitments are recorded when filed.

No local property tax abatement amount disclosed in public filings.

Key specifications on the record

Power capacity
Not disclosed Reported by others: 30 to 40 MW (Data Center Knowledge (opens in a new tab)). Their figure, not the record's.
Water usage
Not disclosed
Land area
Not disclosed
Buildings
3 buildings operator page
[2] apple.com
Backup generators
43 generators (138 MW) permitted
[3] deqonline.deq.state.or.us
Capital investment
$210 million developer figure
[7] datacenterknowledge.com
Commissioned
Operational since 2012 (14 years)
Who leads it
Apple attributed via corporate HQ or property filing
[2] apple.com
Permitted legal entity
Apple Inc. what a permit allows
[3] deqonline.deq.state.or.us [1] echo.epa.gov
State air permit registration
07-0046, 07-0046-ST-01 state air permit register
[3] deqonline.deq.state.or.us
Not disclosed
Who would use it, Jobs once it runs, Tax each year

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Sam Altman

OpenAI CEO

DID Recorded statement at 매일경제 (July 12, 2026)
SAID Altman previously publicly pointed out that the space data center initiative is not realistic. (July 12, 2026) mk.co.kr (opens in a new tab)

Milestone Technologies executive

Public Record Speaker

DID Recorded statement at OPB (April 30, 2026)
SAID Layoffs due to end of contract with client at Prineville location (April 30, 2026) klcc.org (opens in a new tab)

Meta spokesperson

Public Record Speaker

DID Recorded statement at OPB (April 30, 2026)
SAID Meta plans to rehire the majority of staff through a different firm as part of vendor partnership change (April 30, 2026) klcc.org (opens in a new tab)

Jason Beebe

Mayor

DID Recorded statement at bendbulletin.com (March 5, 2026)
SAID Prineville is home to both Facebook and Apple data centers with 15 year tax exemptions beginning to expire (March 5, 2026) redmondspokesman.com (opens in a new tab)

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: Apple · Applicant / Shell LLC: Apple Inc.
UTILITIES
Electric utility: Not disclosed

View all 10 statements on the record in Oregon →

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for Apple Prineville Data Center Campus.

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW)
Site Footprint (Acres)
Data Hall Buildings 3 buildings 3 operator page [2] apple.com
Cooling & Water System
Backup Diesel / Gas Generators 43 units (138 MW) what a permit allows [3] deqonline.deq.state.or.us
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Power the campus would draw A utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Hearings and statements on the record

Said and filed

Said and filed

Statements and filings, side by side

Column A · Dated Statement
Port of Morrow and Columbia River Enterprise Zone Officials Port of Morrow and Enterprise Zone Board Representatives
Venue: Columbia River and Umatilla Enterprise Zone Tax Abatement Approvals
"Enterprise Zone property tax abatements for Amazon Web Services data centers in Morrow and Umatilla Counties drive regional prosperity while industrial cooling water is safely recycled through port wastewater land application systems."
Column B · Primary Government Record
Oregon DEQ Mutual Agreement and Order (Port of Morrow Wastewater Violations) and 2026 Umatilla Data Center Pause
Oregon DEQ Enforcement Penalties (WQ/IWR ER-2022-2024) · Umatilla 2026 Permitting Moratorium
Agency or Venue: Oregon Department of Environmental Quality (DEQ) and City of Umatilla
"Oregon DEQ levied over $2.4 million in repeated environmental fines against the Port of Morrow for dumping hundreds of millions of gallons of nitrogen laden industrial and data center wastewater onto fields above the contaminated Lower Umatilla Basin aquifer, followed by a 2026 municipal permitting pause in Umatilla."

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

  1. (source date; the content gives no date of its own)

    Facebook data center first phase was 150,000 square feet and opened in April

    [8] datacenterknowledge.com

  2. (source date; the content gives no date of its own)

    Apple has already begun work on a 10,000 square foot facility featuring modular data centers

    [7] datacenterknowledge.com

  3. Filing (source date; the content gives no date of its own)

    Apple submitted a master plan for its 160 acre property in Prineville with plans to build two large data center buildings spanning more than 500,000 square feet of data halls

    [7] datacenterknowledge.com

  4. (source date; the content gives no date of its own)

    Apple acquired the 45 Mile Hydroelectric Plant, which had been under development by EBD Hydro and was transferred to Apple in December

    [6] datacenterknowledge.com

  5. (source date; the content gives no date of its own)

    The required electrical capacity would not be available until mid-2013 when a nearby substation could be upgraded

    [5] datacenterknowledge.com

  6. (source date; the content gives no date of its own)

    Apple is considering building a new data center adjacent to Facebook's facility in Prineville, Oregon, using codename Maverick

    [5] datacenterknowledge.com

  7. · Status: running (content date, the month only; the source names no day)

    Apple's 2026 Environmental Progress Report says its Prineville, Oregon data center opened in May 2012, has run on 100 percent renewable energy since, and is one of eight data centers Apple owns and operates.

    [2] apple.com

Every event in order

15 corrections to this record

Every correction, with its reason
  1. · Project summary

    the record's rules: the sentence copied its source, was about its headline or carried a number the card's facts do not; written again from the card's facts, on the editor's word

  2. · Speaker role

    Speaker read again from the statement's source line, "Mayor Jason Beebe": the title in front of the name (Mayor) is the role, not part of the name.

  3. · Speaker

    Speaker read again from the statement's source line, "Mayor Jason Beebe": the title in front of the name (Mayor) is the role, not part of the name.

  4. · Speaker role

    Speaker read again from the statement's source line, "Mayor Jason Beebe": the title in front of the name (Mayor) is the role, not part of the name.

  5. · Speaker

    Speaker read again from the statement's source line, "Mayor Jason Beebe": the title in front of the name (Mayor) is the role, not part of the name.

  6. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  7. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  8. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  9. · Project summary

    Hyphenated compound split to meet the writing rule; the words are unchanged.

Every correction on the record is on the corrections page.

Nearest data centers in Oregon

Verified data center records in Oregon within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
Meta Prineville Data Center Campus Prineville, Crook County Less than 1 mi Running Meta 11 buildings
US Signal Bend Data Center (OR01) Bend, Deschutes County 25 mi Running US Signal 1 building
Boxminer.io La Pine Industrial Park La Pine, Deschutes County 53 mi Stalled or cancelled Boxminer.io 20 MW

Blank cell: not disclosed by any source on file.

Comparisons

1 metric with more than one figure

Every figure on the record for the same thing, each with who gave it, its date and its basis.

Capacity at full buildout

1 figure, 1 source
Show each source's words
  • 30 to 40 MW, Data Center Knowledge: Apple Prineville campus could require 30 to 40 megawatts of power to support its campus at full capacity

Common questions about Apple Prineville Data Center Campus

Answered directly from the verified filings and local actions on this page.

Who is building Apple Prineville Data Center Campus?

Apple is the developer, apple.com (opens in a new tab). No construction contractor is named on the record yet.

Who will use Apple Prineville Data Center Campus?

Not disclosed. No source on file names a tenant, says whether the site is single or multi tenant, or states what it is for. The record keeps the use as not disclosed until one does; see Who it serves.

How much power and water does Apple Prineville Data Center Campus say it needs?

Power: not disclosed by any source on file. Water: not disclosed by any source on file.

Where does Apple Prineville Data Center Campus stand today?

It is running, since May 2012. The newest entry, reported May 31, 2024: Facebook data center first phase was 150,000 square feet and opened in April [8].

What is still unknown about Apple Prineville Data Center Campus?

Not disclosed by any source on file: how much power it needs, how much water it would use, how loud it would be, jobs once it runs, tax it would pay each year, who is constructing it, how much land, where its power comes from, grid connection, how it is cooled. No missing primary document is listed for this record yet; What the record lacks is where one appears when a person names it.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Primary documents

  1. EPA ECHO detailed facility report: Apple Data Center (opens in a new tab), U.S. Environmental Protection Agency
  2. Apple 2026 Environmental Progress Report (opens in a new tab), Apple
  3. Oregon DEQ Standard ACDP (OAR 340-216) 07-0046-ST-01 (Apple Inc. - Apple Inc. - Prineville Data Center) (opens in a new tab), Oregon Department of Environmental Quality, December 1, 2021
  4. Oregon DEQ Permit Review Report 07-0046-ST-01 (Apple Inc. - Apple Inc. - Prineville Data Center) (opens in a new tab), Oregon Department of Environmental Quality, December 1, 2021

Reporting

  1. Report: Apple May Build Near Facebook in Oregon (opens in a new tab), Data Center Knowledge, May 30, 2024, trade press
  2. Apple Buys Hydro Power Facility Near Prineville Data Center (opens in a new tab), Data Center Knowledge, May 31, 2024, trade press
  3. Apple Expansion Boosts Prineville Data Center Ecosystem (opens in a new tab), Data Center Knowledge, May 31, 2024, trade press
  4. Facebook May Get New Neighbors in Prineville (opens in a new tab), Data Center Knowledge, May 31, 2024, trade press
  5. Data centers drain Crook County’s school tax base (opens in a new tab), bendbulletin.com, August 21, 2025, local outlet
  6. Prineville Wants More Out of Its Next Data Center Deal - The Source - Bend, Oregon (opens in a new tab), Bend, Oregon, June 30, 2026, news outlet

10 sources on file.

Regional grid context

This site is in the Northwest Power Pool (NWPP) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Apple Prineville Data Center Campus", https://datacenterrecord.org/projects/apple-prineville-campus-or, last verified October 26, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Apple Prineville Data Center Campus", https://datacenterrecord.org/projects/apple-prineville-campus-or. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Running
Tier
built from one source
Tags
Built from one source
Coordinates
44.289, -120.87685
How the location is known
Location from an EPA facility record.
Location source
https://echo.epa.gov/detailed-facility-report?fid=110071898474
Coordinate source
EPA ECHO Detailed Facility Report 110071898474
Location source number
[1]
Location last verified
October 4, 2026
EPA registry id
110071898474
Published
September 4, 2026
Last verified
October 26, 2026
Not disclosed
Uses, Tenancy, Cooling, How capacity was disclosed, How water was disclosed, How acreage was disclosed, Interconnection, Capacity, if disclosed, Rating of the county's rows

Researcher view · Apple Prineville Data Center Campus · 10 sources, 7 entries · basis and source tier on every row · verified October 26, 2026