Apple operates a large data center campus in Prineville, Oregon, benefiting from Long Term Rural Enterprise Zone tax exemptions that are nearing expiration. It is reported, as reported May 30, 2024.
How much power it needs, how much water it would use and who would use it have not been disclosed.
How to read this page. Every fact links to the source it rests on; a number in brackets is its place in the source list. A figure no source gives reads Not disclosed, and nothing is estimated. Where sources give different figures, each is shown with who gave it, and another source's figure never stands in for the record's own. Entries are added and never overwritten; corrections are listed under What happened.
Each figure as its source gave it. The number in brackets is its place in the source list.
| Field | Value | Who says so | Source | Last verified |
|---|---|---|---|---|
| How much power it needs | Not disclosed | |||
| How much water it would use | Not disclosed | |||
| How loud it would be | Not disclosed | |||
| Jobs once it runs | Not disclosed | |||
| Tax it would pay each year | Not disclosed |
| Field | Value | Who says so | Source | Last verified |
|---|---|---|---|---|
| Who is building it | Apple | as stated by the source | October 4, 2026 | |
| Who is constructing it | Not disclosed | |||
| How much land | Not disclosed | |||
| Where its power comes from | Not disclosed | |||
| Grid connection | Not disclosed | |||
| How it is cooled | Not disclosed |
How much power it needs, also reported: 30 to 40 MW, 2024 (Data Center Knowledge: Apple Prineville campus could require 30 to 40 megawatts of power to support its campus at full capacity) .
The developer's figure is what the company said; what a permit allows is the ceiling a permit sets; measured means observed. Water is in gallons a day or a year, whichever the source stated; a tax claim given as a range shows both ends, each linked to the source that gave it.
The record adds each the day a source gives it. Why these documents.
Acts of Crook County and Prineville about data centers, on the record with their source. A rule about the area is not a decision about this record.
| Date | Who | Decision | Source |
|---|---|---|---|
| Prineville | Prineville officials were in discussion with two additional companies about building data centers in the town where Facebook opened its first company built data center | datacenterknowledge.com |
(source date; the content gives no date of its own)
Milestone Technologies will lay off 66 non union workers on June 28, 2026 [6]
(source date; the content gives no date of its own)
Facebook data center first phase was 150,000 square feet and opened in April [5]
(source date; the content gives no date of its own)
Apple has already begun work on a 10,000 square foot facility featuring modular data centers [4]
(source date; the content gives no date of its own)
Apple submitted a master plan for its 160 acre property in Prineville with plans to build two large data center buildings spanning more than 500,000 square feet of data halls [4]
(source date; the content gives no date of its own)
Apple acquired the 45 Mile Hydroelectric Plant, which had been under development by EBD Hydro and was transferred to Apple in December [3]
(source date; the content gives no date of its own)
The required electrical capacity would not be available until mid-2013 when a nearby substation could be upgraded [2]
· Status: rumored (source date; the content gives no date of its own)
Apple is considering building a new data center adjacent to Facebook's facility in Prineville, Oregon, using codename Maverick [2]
The full Apple Prineville Campus timeline, in order
· the summary of a record items row
the record's rules: the sentence copied its source, was about its headline or carried a number the card's facts do not; written again from the card's facts, on the editor's word The old and new text.
· the speaker role of a statements row
Speaker read again from the statement's source line, "Mayor Jason Beebe": the title in front of the name (Mayor) is the role, not part of the name. The old and new text.
· the speaker of a statements row
Speaker read again from the statement's source line, "Mayor Jason Beebe": the title in front of the name (Mayor) is the role, not part of the name. The old and new text.
· the speaker role of a statements row
Speaker read again from the statement's source line, "Mayor Jason Beebe": the title in front of the name (Mayor) is the role, not part of the name. The old and new text.
· the speaker of a statements row
Speaker read again from the statement's source line, "Mayor Jason Beebe": the title in front of the name (Mayor) is the role, not part of the name. The old and new text.
· the draft of a reference figures row
The record could not read this figure's source: no text of the page reached the classifier, which scored card 4063 from the headline alone, and the number came from the headline; published by the bulk approve of 2026-09-25. A reference figure needs a source the record read: returned to draft, off every page, until a readable source that states it is cited (docs/batch-unread-figures-0929.md). The old and new text.
· the draft of a reference figures row
The record could not read this figure's source: no text of the page reached the classifier, which scored card 4062 from the headline alone, and the number came from the headline; published by the bulk approve of 2026-09-25. A reference figure needs a source the record read: returned to draft, off every page, until a readable source that states it is cited (docs/batch-unread-figures-0929.md). The old and new text.
· the kind of source of a history entry
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of 2026-09-23). The link did not change. The day's label corrections.
· the kind of source of a history entry
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of 2026-09-23). The link did not change. The day's label corrections.
· the kind of source of a history entry
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of 2026-09-23). The link did not change. The day's label corrections.
· the summary of a projects row
Hyphenated compound split to meet the writing rule (DECISIONS section 12); the words are unchanged. The old and new text.
· the draft of a status history row
Published on a project that was still a draft skeleton and still short of the record's skeleton minimum rule; returned to draft on 2026-09-17 pending the project meeting the rule or a person's approval. The old and new text.
· the draft of a status history row
Published on a project that was still a draft skeleton and still short of the record's skeleton minimum rule; returned to draft on 2026-09-17 pending the project meeting the rule or a person's approval. The old and new text.
· the draft of a status history row
Published on a project that was still a draft skeleton and still short of the record's skeleton minimum rule; returned to draft on 2026-09-17 pending the project meeting the rule or a person's approval. The old and new text.
· the draft of a status history row
Published on a project that was still a draft skeleton and still short of the record's skeleton minimum rule; returned to draft on 2026-09-17 pending the project meeting the rule or a person's approval. The old and new text.
Every correction on the record is on the corrections page.
Altman previously publicly pointed out that the space data center initiative is not realistic.
Layoffs due to end of contract with client at Prineville location
Every statement about data centers in Oregon, by speaker
OpenAI CEO
Sam Altman said Musk is selling 'short term' space data centers to investors.
Meta spokesperson
Meta plans to rehire the majority of staff through a different firm as part of vendor partnership change
Jason Beebe, Mayor
Prineville is home to both Facebook and Apple data centers with 15 year tax exemptions beginning to expire
Casey Kaiser, assistant city manager
Meta and Apple funded nearly the entire aquifer system
Casey Kaiser, assistant city manager
Data centers pay same water rates and system development charges as any other industrial developer
Jason Beebe, Mayor
Regulations will likely aim to protect energy infrastructure and water supplies from being overburdened
Greg LeRoy, executive director of Good Jobs First, stated that since Oregon has no sales tax, it is property taxes that are the big dollars attracting data centers
Apple has committed to supporting 100 percent of its energy use in Prineville with renewable resources
The pin is the site, as the EPA's facility record places it. Location from an EPA water permit.
Tap a pin for the data center, the parcel for its record
The other pins are the published projects in the same state, each in its stage color. The imagery beneath is the USGS national orthoimagery, public domain, shown so the land around the site can be read.
Not disclosed. No source on file gives its capacity, its acreage or a count of buildings. What the record holds instead is under Disclosed.
Apple is the developer. No construction contractor is named on the record yet.
Not disclosed. No source on file names a tenant, says whether the site is single or multi tenant, or states what it is for. The record keeps the use as not disclosed until one does; see Who it serves.
Power: not disclosed by any source on file. Water: not disclosed by any source on file.
It is reported, as reported May 30, 2024. The newest entry, reported April 30, 2026: Milestone Technologies will lay off 66 non union workers on June 28, 2026 [6].
Prineville: Prineville officials were in discussion with two additional companies about building data centers in the town where Facebook opened its first company built data center (reported May 31, 2024, source). 1 event is on the county's rows; a rule about the area is not a decision about this record.
Not disclosed by any source on file: how much power it needs, how much water it would use, how loud it would be, jobs once it runs, tax it would pay each year, who is constructing it, how much land, where its power comes from, grid connection, how it is cooled. No missing primary document is listed for this record yet; What the record lacks is where one appears when a person names it.
10 sources on file.
Data Center Record, "Apple Prineville Campus", https://datacenterrecord.org/projects/apple-prineville-campus-or, last verified October 4, 2026.
Data Center Record, "Apple Prineville Campus", https://datacenterrecord.org/projects/apple-prineville-campus-or. Data: Data Center Record, datacenterrecord.org, CC BY 4.0.
The structured rows are CC BY 4.0. Link to this page; that is what turns a reuse into a citation. Prose stays under copyright.