Data Center Record.
Census GEOID: 41017 Location Precision: assessor parcel Jump to Entity & Permit Table Commercial & Bulk Data (CC BY-NC 4.0)

Last verified: · 4 reporting sources

● Stalled or Cancelled Recorded May 27, 2026 · 1 Building

Boxminer.io La Pine Industrial Park

Street address 51605 Coach Rd, La Pine, OR 97739, Deschutes County assessor parcel Exact, on the parcel lapineoregon.gov (opens in a new tab)

Overview, regulatory gates and specifications

Boxminer.io proposed a 20 megawatt data center on approximately 19.5 to 20 acres at the La Pine Industrial Park on Reed Road, which La Pine City Council unanimously voted to reject on May 27, 2026 after strong public opposition. [1] Filings on the record specify disclosed capacity of 20 MW (the developer's figure), 1 planned or operational building. [4]

1. Land & Parcel
20 acres on file
2. Local Zoning
Not yet on file
3. Tax & EDA Deal
Not yet on file
4. Utility Grid Queue
20 MW disclosed
5. Air & Water Permits
Not yet on file
What happens next: Next public milestones include utility queue filings, state environmental permits and local site plan review.
Electricity Demand [4]
20 MW
the developer's figure

Equivalent to ~16,600 U.S. homes (U.S. EIA 830 homes/MW baseline) · 1.0% of Hoover Dam nameplate capacity (2,080 MW).

Grid interconnection and utility service tracked on file.

Cooling & Water
Not disclosed
Daily water volume not stated in public filings

U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.

No local property tax abatement amount disclosed in public filings.

Site & Buildings [4]
20 acres
the developer's figure

1 planned or operational data hall building.

Location: 51605 Coach Rd, La Pine, OR 97739.

Taxes & Permanent Jobs
Not disclosed
Tax and job figures not yet on file

State and local tax abatement agreements and permanent job commitments are recorded when filed.

No local property tax abatement amount disclosed in public filings.

Key specifications on the record

Power capacity
20 MW developer figure Equivalent to the continuous electricity demand of about 16,600 average U.S. homes based on U.S. Energy Information Administration residential consumption data. About 0.2 percent of New York City's summer peak demand in 2024.
[4] opb.org
Water usage
Not disclosed
Land area
20 acres developer figure
[4] opb.org
Buildings
1 building operator page
[4] opb.org
Backup generators
Not disclosed
Capital investment
Not disclosed
Who leads it
Boxminer.io as stated by the source
Not disclosed
Who would use it, Jobs once it runs, Tax each year
The math behind the comparison
  1. Boxminer.io La Pine Industrial Park, capacity: 20 MW.
  2. New York City (NYISO Zone J) summer peak demand, actual, 2024: 10,245 MW (2024).
  3. 20 ÷ 10,245 = 0.002 (MW over MW).

Sources:

A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: Boxminer.io
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for Boxminer.io La Pine Industrial Park.

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW) 20 MW the developer's figure [4] opb.org
Site Footprint (Acres) 20 acres 20 acres the developer's figure [4] opb.org
Data Hall Buildings 1 building developer [4] opb.org
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Hearings and statements on the record

May 15, 2026 La Pine, OR Proposed Data Center in La Pine Focus of Public Comment at City Council Meeting La Pine City Council 2 clips

KTVZ News report on La Pine City Council and community proceedings in La Pine, OR: Proposed Data Center in La Pine Focus of Public Comment at City Council Meeting (May 15, 2026).

  1. KTVZ NewsChannel 21 Broadcast Report Broadcast Report transcribed from local broadcast report
    ""no " to data centers. Back in march, the council heard a proposal for the creation of a data center in lapine on reed road. The city requested a more formal presentation of the proposal. However, news of this potential data center recently reached the public, and people encouraged each other to attend to oppose it. Ktvz streamed the entire meeting on ktvz plus, and spoke"
  2. Sandy L. Resident Public Comment transcribed from local broadcast report
    "infrastructure that is required by these data centers. But we are the people are taking care of the bill for people who are making more money than you and I could ever dream up. We can't afford anything like to allow this. Is this who will put another rubber stamp on something else? It makes it even harder for us to exist. " SANDY L., La Pine RESIDENT 0:17 to 0:34 "I hope that they listen to the people that live here, the people who are raising families here and grandkids and the people that are going to be paying for it. So I hope that they, aren't just thinking about other special interests and"
May 13, 2026 La Pine, OR La Pine residents pack City Hall to oppose proposed data center La Pine City Council 3 clips

Central Oregon Daily News report on La Pine City Council and community proceedings in La Pine, OR: La Pine residents pack City Hall to oppose proposed data center (May 13, 2026).

  1. Central Oregon Daily News Broadcast Report Broadcast Report transcribed from local broadcast report
    "sale. We're all poor in this town, let's be real. We don't need our power bills going up any higher. water usage, we didn't have a winter this year. Where are we going to get water just magically evaporating to feed this behemoth of a thing? Others told council they felt off guard by how far the discussion had gone. Nobody I have talked to, and I've been to 40 houses in my neighborhood, not a single person has known that this has been on an agenda. Sure, you can say you didn't hide it,"
  2. Resident public comment Resident Public Comment transcribed from local broadcast report
    "Do any of you know how controversial data centers are right now? Mayor Janine Erls pushed back during a later part of the public comment period to some residents saying that no one had spoken about the project before. She says the council had already heard from some supporters at a previous meeting. We already had people that are for the data center. They showed up at one point, and that time there was four for it and one that wasn't. I'm not sure if"
  3. Central Oregon Daily News Broadcast Report Broadcast Report transcribed from local broadcast report
    "that have been for this and urging the council to make the decision are here as well. But many in the room said a project this big should not move forward without more public say. This is one decision that our community should get a vote on and not just simply pass it and move it forward. And some questioned what could happen if the deal goes wrong. These companies have deep pockets. If there's litigation, you"
Said and filed

Said and filed

Statements and filings, side by side

Column A · Dated Statement
Port of Morrow and Columbia River Enterprise Zone Officials Port of Morrow and Enterprise Zone Board Representatives
Venue: Columbia River and Umatilla Enterprise Zone Tax Abatement Approvals
"Enterprise Zone property tax abatements for Amazon Web Services data centers in Morrow and Umatilla Counties drive regional prosperity while industrial cooling water is safely recycled through port wastewater land application systems."
Column B · Primary Government Record
Oregon DEQ Mutual Agreement and Order (Port of Morrow Wastewater Violations) and 2026 Umatilla Data Center Pause
Oregon DEQ Enforcement Penalties (WQ/IWR ER-2022-2024) · Umatilla 2026 Permitting Moratorium
Agency or Venue: Oregon Department of Environmental Quality (DEQ) and City of Umatilla
"Oregon DEQ levied over $2.4 million in repeated environmental fines against the Port of Morrow for dumping hundreds of millions of gallons of nitrogen laden industrial and data center wastewater onto fields above the contaminated Lower Umatilla Basin aquifer, followed by a 2026 municipal permitting pause in Umatilla."

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

  1. · Status: stalled or cancelled (content date)

    La Pine City Council voted unanimously on May 27, 2026 to reject the proposed 20 megawatt Boxminer.io data center at the La Pine Industrial Park.

    [4] opb.org

Every event in order

4 corrections to this record

Every correction, with its reason
  1. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  2. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  3. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  4. · Project summary

    Hyphenated compound split to meet the writing rule; the words are unchanged.

Every correction on the record is on the corrections page.

Nearest data centers in Oregon

Verified data center records in Oregon within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
US Signal Bend Data Center (OR01) Bend, Deschutes County 31 mi Running US Signal 1 building
Meta Prineville Data Center Campus Prineville, Crook County 52 mi Running Meta 11 buildings
Apple Prineville Data Center Campus Prineville, Crook County 53 mi Running Apple 3 buildings

Blank cell: not disclosed by any source on file.

Common questions about Boxminer.io La Pine Industrial Park

Answered directly from the verified filings and local actions on this page.

Who is building Boxminer.io La Pine Industrial Park?

Boxminer.io is the developer. No construction contractor is named on the record yet.

How much power and water does Boxminer.io La Pine Industrial Park say it needs?

Power: 20 MW (the developer's figure, opb.org (opens in a new tab)). Water: not disclosed by any source on file.

Where does Boxminer.io La Pine Industrial Park stand today?

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Reporting

  1. La Pine residents pack meeting to oppose data center (opens in a new tab), bendbulletin.com, May 14, 2026, local outlet
  2. La Pine Rejects Proposed Data Center Amid Public Outcry - The Source - Bend, Oregon (opens in a new tab), The Source - Bend, Oregon, June 2, 2026, news outlet
  3. La Pine shuts down proposed data center after public backlash - Central Oregon Daily (opens in a new tab), Central Oregon Daily, May 28, 2026, local outlet
  4. A small Central Oregon town shoots down data center development - Oregon Public Broadcasting - OPB (opens in a new tab), OPB, May 28, 2026, local outlet

4 sources on file.

Regional grid context

This site is in the Northwest Power Pool (NWPP) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Boxminer.io La Pine Industrial Park", https://datacenterrecord.org/projects/boxminer-io-la-pine-industrial-park-or, last verified October 26, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Boxminer.io La Pine Industrial Park", https://datacenterrecord.org/projects/boxminer-io-la-pine-industrial-park-or. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Stalled or cancelled
Tier
built from one source
Tags
Built from one source
Coordinates
43.6625, -121.4912
How the location is known
Location from the county parcel record.
Location source
https://www.lapineoregon.gov/citycouncil
Coordinate source
Deschutes County / City of La Pine Industrial Park parcel record
Location last verified
September 16, 2026
How capacity was disclosed
the developer's figure
How acreage was disclosed
the developer's figure
Capacity, if disclosed
20 MW, the developer's figure
Published
September 4, 2026
Last verified
October 26, 2026
Not disclosed
Location source number, EPA registry id, Uses, Tenancy, Cooling, How water was disclosed, Interconnection, Rating of the county's rows

Researcher view · Boxminer.io La Pine Industrial Park · 4 sources, 1 entry · basis and source tier on every row · verified October 26, 2026

Download CSV JSON