TierPoint lists a data center at Allentown, Pennsylvania among the sites it operates. It is running; the record holds no sourced date for when it reached that stage.

How much power it needs, how much water it would use and who would use it have not been disclosed.

Last verified · 11 sources, 1 primary · A skeleton record: built from one source, not yet reviewed in depth by a person. · How to read this page

How to read this page. Every fact links to the source it rests on; a number in brackets is its place in the source list. A figure no source gives reads Not disclosed, and nothing is estimated. Where sources give different figures, each is shown with who gave it, and another source's figure never stands in for the record's own. Entries are added and never overwritten; corrections are listed under What happened.

What is known

Each figure as its source gave it. The number in brackets is its place in the source list.

Land
Not disclosed
Power it would draw
Not disclosed
Water
Not disclosed
Who leads it
TierPoint
as stated by the source
Who would use it
Not disclosed
Jobs once it runs
Not disclosed
Tax each year
Not disclosed
Every field, with who said it and when (Researcher view)

Impact figures

FieldValueWho says soSourceLast verified
How much power it needs Not disclosed
How much water it would use Not disclosed
How loud it would be Not disclosed
Jobs once it runs Not disclosed
Tax it would pay each year Not disclosed

The record's fields

FieldValueWho says soSourceLast verified
Who is building it TierPoint as stated by the source September 17, 2026
Who is constructing it Not disclosed
How much land Not disclosed
Where its power comes from Not disclosed
Grid connection Not disclosed
How it is cooled Not disclosed

The developer's figure is what the company said; what a permit allows is the ceiling a permit sets; measured means observed. Water is in gallons a day or a year, whichever the source stated; a tax claim given as a range shows both ends, each linked to the source that gave it.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water useA state water right filing or a water supply agreement.
  • Who would use itA lease announcement or a tenant named in a filing.
  • Power the campus would drawA utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Jobs and taxAn incentive agreement, a county's economic development filing or a fiscal note.

What was decided

Acts of Lehigh County and Allentown about data centers, on the record with their source. A rule about the area is not a decision about this record.

DateWhoDecisionSource
Lehigh County South Whitehall Township in Lehigh County facing community opposition to a data center proposal cbsnews.com

What happened

  1. · Status: running (the day the page was read; it gives no date of its own)

    TierPoint lists TierPoint Allentown - TekPark Data Center at Allentown, Pennsylvania on its own page of data center locations, read September 14, 2026. [1]

The full TierPoint Allentown - TekPark Data Center timeline, in order

The site

Where in Allentown is not in the public record. The pin marks the center of Allentown, not a building, and the outline is Lehigh County.

  • This record: Running, ringed
  • data center
  • Dashed edge: the exact site is not in the public record
  • Smaller pins: 19 other published records in Pennsylvania
Details
  • this record's location, ringed
  • parcel outline, from the county parcel record
  • city limits, U.S. Census Bureau, on a town level record
  • county boundary

The other pins are the published projects in the same state, each in its stage color. The imagery beneath is the USGS national orthoimagery, public domain, shown so the land around the site can be read.

Where
Allentown, Lehigh County, Pennsylvania
How exactly it is located
Town level, the center of the city
The parcel
No parcel outline in the public record
Nearest homes
Not computed for a record placed at a place center
Nearest records
Nearest records are not computed for a record placed at the center of its town.

Questions about this project

4 questions answered from the record

Answered from the rows on this page.

Who is building TierPoint Allentown - TekPark Data Center?

TierPoint is the developer. No construction contractor is named on the record yet.

How much power and water does TierPoint Allentown - TekPark Data Center say it needs?

Power: not disclosed by any source on file. Water: not disclosed by any source on file.

Where does TierPoint Allentown - TekPark Data Center stand today?

It is running; the date it reached that stage is not sourced, only the day a page was read. The newest entry, read on September 14, 2026: TierPoint lists TierPoint Allentown - TekPark Data Center at Allentown, Pennsylvania on its own page of data center locations, read September 14, 2026. [1]

What has Allentown or Lehigh County decided about it?

Lehigh County: South Whitehall Township in Lehigh County facing community opposition to a data center proposal (reported September 16, 2026, source). 1 event is on the county's rows; a rule about the area is not a decision about this record.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Primary documents

  1. TierPoint: Browse our data centers, TierPoint, September 14, 2026

Reporting

  1. TierPoint raises $240M, buys Pennsylvania data center - The Business Journals, The Business Journals, October 29, 2025, query feed
  2. TierPoint acquires leased data center site in Pennsylvania, plans 100MW expansion - Data Center Dynamics, Data Center Dynamics, October 24, 2025, query feed
  3. A data center company bought a Lehigh Valley industrial park for $175 million, plans expansion - mcall.com, mcall.com, December 16, 2025, query feed
  4. Tek Park’s Next Chapter: Lehigh Valley Tech Hub Expanding Under New Ownership - Lehigh Valley Economic Development, Lehigh Valley Economic Development, December 16, 2025, query feed
  5. TierPoint ups UPS capacity to expand TekPark data center - Data Center Dynamics, Data Center Dynamics, December 11, 2020, query feed
  6. Data centers land in Lehigh Valley - The Lafayette – The Oldest College Newspaper in Pennsylvania, The Lafayette – The Oldest College Newspaper in Pennsylvania, February 27, 2026, query feed
  7. See the Lehigh Valley’s top commercial deals for 2025. They were led by land for a data center - mcall.com, mcall.com, December 30, 2025, query feed
  8. Planning needed for potential Lehigh Valley data center boom - Lehigh Valley Business, Lehigh Valley Business, January 14, 2026, query feed
  9. New owner plans data center expansion at Tek Park - Lehigh Valley Business, Lehigh Valley Business, December 17, 2025, query feed
  10. Data centers: The hidden cost of artificial intelligence is coming to the Lehigh Valley - Lehighvalleylive.com, Lehighvalleylive.com, December 28, 2025, query feed

11 sources on file.

Cite this record

Data Center Record, "TierPoint Allentown - TekPark Data Center", https://datacenterrecord.org/projects/tierpoint-allentown-tekpark-data-center-pa, last verified September 17, 2026.

Last verified , first recorded . Every correction is logged on the corrections page.

Cite this page

Data Center Record, "TierPoint Allentown - TekPark Data Center", https://datacenterrecord.org/projects/tierpoint-allentown-tekpark-data-center-pa. Data: Data Center Record, datacenterrecord.org, CC BY 4.0.

The structured rows are CC BY 4.0. Link to this page; that is what turns a reuse into a citation. Prose stays under copyright.

Report a change
For researchers
Slug
tierpoint-allentown-tekpark-data-center-pa
Status value
operational
Stage
Running
Tier
skeleton
Tags
skeleton
Place id
us/pa/lehigh-county/allentown
Coordinates
40.5960948, -75.4755779
Location precision
city
Location source
U.S. Census Bureau TIGERweb city centroid, public domain
Coordinate source
tigerweb city centroid
Location source number
Not disclosed
Location last verified
September 14, 2026
EPA registry id
Not disclosed
Use type values
not_disclosed
Tenancy value
not_disclosed
Cooling type value
not_disclosed
Capacity basis
not_disclosed
Water basis
not_disclosed, gallons_per_day
Acreage basis
Not disclosed
Interconnection value
not_disclosed
Capacity, if disclosed
Not disclosed
Rating of the county's rows
Not disclosed
Published
2026-09-14