TierPoint Lehigh Valley Data Center
TierPoint lists a data center at Valley, Pennsylvania among the sites it operates. It is running; the record holds no sourced date for when it reached that stage.
How much power it needs, how much water it would use and who would use it have not been disclosed.
How to read this page. Every fact links to the source it rests on; a number in brackets is its place in the source list. A figure no source gives reads Not disclosed, and nothing is estimated. Where sources give different figures, each is shown with who gave it, and another source's figure never stands in for the record's own. Entries are added and never overwritten; corrections are listed under What happened.
What is known
Each figure as its source gave it. The number in brackets is its place in the source list.
- Land
- Not disclosed
- Power it would draw
- Not disclosed
- Reported by others: 11 to 32 gigawatts (Yellowhammer News); 4,100 MW (Yellowhammer News), and 1 more under Comparisons. Their figure, not the record's.
- Water
- Not disclosed
- Who leads it
- TierPoint
- as stated by the source
- Who would use it
- Not disclosed
- Jobs once it runs
- Not disclosed
- Tax each year
- Not disclosed
Every field, with who said it and when (Researcher view)
Impact figures
| Field | Value | Who says so | Source | Last verified |
|---|---|---|---|---|
| How much power it needs | Not disclosed | |||
| How much water it would use | Not disclosed | |||
| How loud it would be | Not disclosed | |||
| Jobs once it runs | Not disclosed | |||
| Tax it would pay each year | Not disclosed |
The record's fields
| Field | Value | Who says so | Source | Last verified |
|---|---|---|---|---|
| Who is building it | TierPoint | as stated by the source | September 17, 2026 | |
| Who is constructing it | Not disclosed | |||
| How much land | Not disclosed | |||
| Where its power comes from | Not disclosed | |||
| Grid connection | Not disclosed | |||
| How it is cooled | Not disclosed |
How much power it needs, also reported: 11 to 32 gigawatts, 2026 (Yellowhammer News: TVA 2026 Integrated Resource Plan projects region could need 11 to 32 gigawatts additional capacity by 2040); 4,100 MW, 2026 (Yellowhammer News: More than 4100 megawatts of new TVA owned generation currently under construction); 3,000 MW, 2026 (Yellowhammer News: 3000 megawatts of generation under evaluation by TVA) .
The developer's figure is what the company said; what a permit allows is the ceiling a permit sets; measured means observed. Water is in gallons a day or a year, whichever the source stated; a tax claim given as a range shows both ends, each linked to the source that gave it.
Still not public, and where it would show up
The record adds each the day a source gives it. Why these documents.
- Water useA state water right filing or a water supply agreement.
- Who would use itA lease announcement or a tenant named in a filing.
- Power the campus would drawA utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
- Jobs and taxAn incentive agreement, a county's economic development filing or a fiscal note.
What happened
-
· Status: running (the day the page was read; it gives no date of its own)
TierPoint lists TierPoint Lehigh Valley Data Center at Valley, Pennsylvania on its own page of data center locations, read September 14, 2026. [1]
The full TierPoint Lehigh Valley Data Center timeline, in order
The site
Where in Valley is not in the public record. The pin marks the center of Valley, not a building, and the outline is Chester County.
Tap a pin for the data center, the parcel for its record
- This record: Running, ringed
- data center
- Dashed edge: the exact site is not in the public record
- Smaller pins: 19 other published records in Pennsylvania
Details
- this record's location, ringed
- parcel outline, from the county parcel record
- city limits, U.S. Census Bureau, on a town level record
- county boundary
The other pins are the published projects in the same state, each in its stage color. The imagery beneath is the USGS national orthoimagery, public domain, shown so the land around the site can be read.
- Where
- Valley, Chester County, Pennsylvania
- How exactly it is located
- Town level, the center of the city
- The parcel
- No parcel outline in the public record
- Nearest homes
- Not computed for a record placed at a place center
- Nearest records
- Nearest records are not computed for a record placed at the center of its town.
Comparisons
1 metric with more than one figure
Capacity at full buildout
3 figures, 1 sourceShow each source's words
- 11 to 32 gigawatts, Yellowhammer News: TVA 2026 Integrated Resource Plan projects region could need 11 to 32 gigawatts additional capacity by 2040
- 4,100 MW, Yellowhammer News: More than 4100 megawatts of new TVA owned generation currently under construction
- 3,000 MW, Yellowhammer News: 3000 megawatts of generation under evaluation by TVA
Questions about this project
7 questions answered from the record
How big is TierPoint Lehigh Valley Data Center?
-
Not disclosed. No source on file gives its capacity, its acreage or a count of buildings. What the record holds instead is under Disclosed.
Who is building TierPoint Lehigh Valley Data Center?
-
TierPoint is the developer. No construction contractor is named on the record yet.
Who will use TierPoint Lehigh Valley Data Center?
-
Not disclosed. No source on file names a tenant, says whether the site is single or multi tenant, or states what it is for. The record keeps the use as not disclosed until one does; see Who it serves.
How much power and water does TierPoint Lehigh Valley Data Center say it needs?
-
Power: not disclosed by any source on file. Water: not disclosed by any source on file.
Where does TierPoint Lehigh Valley Data Center stand today?
-
It is running; the date it reached that stage is not sourced, only the day a page was read. The newest entry, read on September 14, 2026: TierPoint lists TierPoint Lehigh Valley Data Center at Valley, Pennsylvania on its own page of data center locations, read September 14, 2026. [1]
What has Valley or Chester County decided about it?
-
No decision by Valley or Chester County about data centers is on the record. The Chester County page and the Pennsylvania scorecard list every rated row the day a person publishes one.
What is still unknown about TierPoint Lehigh Valley Data Center?
-
Not disclosed by any source on file: how much power it needs, how much water it would use, how loud it would be, jobs once it runs, tax it would pay each year, who is constructing it, how much land, where its power comes from, grid connection, how it is cooled. No missing primary document is listed for this record yet; What the record lacks is where one appears when a person names it.
Sources
Primary documents
- TierPoint: Browse our data centers, TierPoint, September 14, 2026
1 source on file.
Cite this record
Data Center Record, "TierPoint Lehigh Valley Data Center", https://datacenterrecord.org/projects/tierpoint-lehigh-valley-data-center-pa, last verified September 17, 2026.
Cite this page
Data Center Record, "TierPoint Lehigh Valley Data Center", https://datacenterrecord.org/projects/tierpoint-lehigh-valley-data-center-pa. Data: Data Center Record, datacenterrecord.org, CC BY 4.0.
The structured rows are CC BY 4.0. Link to this page; that is what turns a reuse into a citation. Prose stays under copyright.
For researchers
- Slug
- tierpoint-lehigh-valley-data-center-pa
- Status value
- operational
- Stage
- Running
- Tier
- skeleton
- Tags
- skeleton
- Place id
- us/pa/chester-county/valley
- Coordinates
- 39.9848412, -75.8502218
- Location precision
- city
- Location source
- U.S. Census Bureau TIGERweb city centroid, public domain
- Coordinate source
- tigerweb city centroid
- Location source number
- Not disclosed
- Location last verified
- September 14, 2026
- EPA registry id
- Not disclosed
- Use type values
- not_disclosed
- Tenancy value
- not_disclosed
- Cooling type value
- not_disclosed
- Capacity basis
- not_disclosed
- Water basis
- not_disclosed, gallons_per_day
- Acreage basis
- Not disclosed
- Interconnection value
- not_disclosed
- Capacity, if disclosed
- Not disclosed
- Rating of the county's rows
- Not disclosed
- Published
- 2026-09-14
- Last verified
- 2026-09-17