Data Center Record.

Running Built from one source

TierPoint Lehigh Valley Data Center

TierPoint lists a data center at Valley, Pennsylvania among the sites it operates. It is running; the record holds no sourced date for when it reached that stage.

How much power it needs, how much water it would use and who would use it have not been disclosed.

Last verified · 1 source, 1 primary · A skeleton record: built from one source, not yet reviewed in depth by a person. · How to read this page

How to read this page. Every fact links to the source it rests on; a number in brackets is its place in the source list. A figure no source gives reads Not disclosed, and nothing is estimated. Where sources give different figures, each is shown with who gave it, and another source's figure never stands in for the record's own. Entries are added and never overwritten; corrections are listed under What happened.

What is known

Each figure as its source gave it. The number in brackets is its place in the source list.

Land
Not disclosed
Power it would draw
Not disclosed
Reported by others: 11 to 32 gigawatts (Yellowhammer News); 4,100 MW (Yellowhammer News), and 1 more under Comparisons. Their figure, not the record's.
Water
Not disclosed
Who leads it
TierPoint
as stated by the source
Who would use it
Not disclosed
Jobs once it runs
Not disclosed
Tax each year
Not disclosed
Every field, with who said it and when (Researcher view)

Impact figures

FieldValueWho says soSourceLast verified
How much power it needs Not disclosed
How much water it would use Not disclosed
How loud it would be Not disclosed
Jobs once it runs Not disclosed
Tax it would pay each year Not disclosed

The record's fields

FieldValueWho says soSourceLast verified
Who is building it TierPoint as stated by the source September 17, 2026
Who is constructing it Not disclosed
How much land Not disclosed
Where its power comes from Not disclosed
Grid connection Not disclosed
How it is cooled Not disclosed

How much power it needs, also reported: 11 to 32 gigawatts, 2026 (Yellowhammer News: TVA 2026 Integrated Resource Plan projects region could need 11 to 32 gigawatts additional capacity by 2040); 4,100 MW, 2026 (Yellowhammer News: More than 4100 megawatts of new TVA owned generation currently under construction); 3,000 MW, 2026 (Yellowhammer News: 3000 megawatts of generation under evaluation by TVA) .

The developer's figure is what the company said; what a permit allows is the ceiling a permit sets; measured means observed. Water is in gallons a day or a year, whichever the source stated; a tax claim given as a range shows both ends, each linked to the source that gave it.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water useA state water right filing or a water supply agreement.
  • Who would use itA lease announcement or a tenant named in a filing.
  • Power the campus would drawA utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Jobs and taxAn incentive agreement, a county's economic development filing or a fiscal note.

What happened

  1. · Status: running (the day the page was read; it gives no date of its own)

    TierPoint lists TierPoint Lehigh Valley Data Center at Valley, Pennsylvania on its own page of data center locations, read September 14, 2026. [1]

The full TierPoint Lehigh Valley Data Center timeline, in order

The site

Where in Valley is not in the public record. The pin marks the center of Valley, not a building, and the outline is Chester County.

  • This record: Running, ringed
  • data center
  • Dashed edge: the exact site is not in the public record
  • Smaller pins: 19 other published records in Pennsylvania
Details
  • this record's location, ringed
  • parcel outline, from the county parcel record
  • city limits, U.S. Census Bureau, on a town level record
  • county boundary

The other pins are the published projects in the same state, each in its stage color. The imagery beneath is the USGS national orthoimagery, public domain, shown so the land around the site can be read.

Where
Valley, Chester County, Pennsylvania
How exactly it is located
Town level, the center of the city
The parcel
No parcel outline in the public record
Nearest homes
Not computed for a record placed at a place center
Nearest records
Nearest records are not computed for a record placed at the center of its town.

Comparisons

1 metric with more than one figure

Every figure on the record for the same thing, the record's own or the document's first, each with who gave it, its date and its basis.

Capacity at full buildout

3 figures, 1 source
11 to 32 gigawattsReported

Yellowhammer News, Aug 26, 2026

Show each source's words
  • 11 to 32 gigawatts, Yellowhammer News: TVA 2026 Integrated Resource Plan projects region could need 11 to 32 gigawatts additional capacity by 2040
  • 4,100 MW, Yellowhammer News: More than 4100 megawatts of new TVA owned generation currently under construction
  • 3,000 MW, Yellowhammer News: 3000 megawatts of generation under evaluation by TVA

Questions about this project

7 questions answered from the record

Answered from the rows on this page.

How big is TierPoint Lehigh Valley Data Center?

Not disclosed. No source on file gives its capacity, its acreage or a count of buildings. What the record holds instead is under Disclosed.

Who is building TierPoint Lehigh Valley Data Center?

TierPoint is the developer. No construction contractor is named on the record yet.

Who will use TierPoint Lehigh Valley Data Center?

Not disclosed. No source on file names a tenant, says whether the site is single or multi tenant, or states what it is for. The record keeps the use as not disclosed until one does; see Who it serves.

How much power and water does TierPoint Lehigh Valley Data Center say it needs?

Power: not disclosed by any source on file. Water: not disclosed by any source on file.

Where does TierPoint Lehigh Valley Data Center stand today?

It is running; the date it reached that stage is not sourced, only the day a page was read. The newest entry, read on September 14, 2026: TierPoint lists TierPoint Lehigh Valley Data Center at Valley, Pennsylvania on its own page of data center locations, read September 14, 2026. [1]

What has Valley or Chester County decided about it?

No decision by Valley or Chester County about data centers is on the record. The Chester County page and the Pennsylvania scorecard list every rated row the day a person publishes one.

What is still unknown about TierPoint Lehigh Valley Data Center?

Not disclosed by any source on file: how much power it needs, how much water it would use, how loud it would be, jobs once it runs, tax it would pay each year, who is constructing it, how much land, where its power comes from, grid connection, how it is cooled. No missing primary document is listed for this record yet; What the record lacks is where one appears when a person names it.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Primary documents

  1. TierPoint: Browse our data centers, TierPoint, September 14, 2026

1 source on file.

Cite this record

Data Center Record, "TierPoint Lehigh Valley Data Center", https://datacenterrecord.org/projects/tierpoint-lehigh-valley-data-center-pa, last verified September 17, 2026.

Last verified , first recorded . Every correction is logged on the corrections page.

Cite this page

Data Center Record, "TierPoint Lehigh Valley Data Center", https://datacenterrecord.org/projects/tierpoint-lehigh-valley-data-center-pa. Data: Data Center Record, datacenterrecord.org, CC BY 4.0.

The structured rows are CC BY 4.0. Link to this page; that is what turns a reuse into a citation. Prose stays under copyright.

Report a change
For researchers
Slug
tierpoint-lehigh-valley-data-center-pa
Status value
operational
Stage
Running
Tier
skeleton
Tags
skeleton
Place id
us/pa/chester-county/valley
Coordinates
39.9848412, -75.8502218
Location precision
city
Location source
U.S. Census Bureau TIGERweb city centroid, public domain
Coordinate source
tigerweb city centroid
Location source number
Not disclosed
Location last verified
September 14, 2026
EPA registry id
Not disclosed
Use type values
not_disclosed
Tenancy value
not_disclosed
Cooling type value
not_disclosed
Capacity basis
not_disclosed
Water basis
not_disclosed, gallons_per_day
Acreage basis
Not disclosed
Interconnection value
not_disclosed
Capacity, if disclosed
Not disclosed
Rating of the county's rows
Not disclosed
Published
2026-09-14
Last verified
2026-09-17