A data center project in Allentown, Lehigh County, listed on the Pennsylvania DEP's Data Center Permit Tracker. It is proposed; the record holds no sourced date for when it reached that stage.

How much power it needs, how much water it would use and who would use it have not been disclosed.

Last verified · 1 source, 1 primary · Reviewed by a person, every entry sourced. · How to read this page

  • This record: Proposed, ringed
  • data center
  • Smaller pins: 78 other published records in Pennsylvania
Details
  • this record's location, ringed
  • parcel outline, from the county parcel record
  • city limits, U.S. Census Bureau, on a town level record
  • county boundary

The other pins are the published projects in the same state, each in its stage color. The imagery beneath is the USGS national orthoimagery, public domain, shown so the land around the site can be read.

How to read this page. Every fact links to the source it rests on; a number in brackets is its place in the source list. A figure no source gives reads Not disclosed, and nothing is estimated. Where sources give different figures, each is shown with who gave it, and another source's figure never stands in for the record's own. Entries are added and never overwritten; corrections are listed under What happened.

What is known

Each figure as its source gave it. The number in brackets is its place in the source list.

Who leads it
Quantm LLC as stated by the source
[1] gis.dep.pa.gov
State permit status
Proposed, no permit applications received the state's permit register, as of October 7, 2026, last verified October 23, 2026
[1] gis.dep.pa.gov
Undisclosed in public filings
Land, Buildings, Power it would draw, Water, Who would use it, Jobs once it runs, Tax each year Reported by others: 23 GW (newscentermaine.com (opens in a new tab)). Their figure, not the record's.
Every field, with who said it and when (Researcher view)

Impact figures

FieldValueWho says soSourceLast verified
How much power it needs
How much water it would use
How loud it would be
Jobs once it runs
Tax it would pay each year

The record's fields

FieldValueWho says soSourceLast verified
Who is building it Quantm LLC as stated by the source [1] gis.dep.pa.gov (opens in a new tab) October 23, 2026
Who is constructing it
How much land
Buildings
Where its power comes from
Grid connection
How it is cooled
State permit status Proposed, no permit applications received the state's permit register, as of October 7, 2026, last verified October 23, 2026 [1] gis.dep.pa.gov (opens in a new tab) October 23, 2026

How much power it needs, also reported: 23 GW, 2026 (newscentermaine.com (opens in a new tab): 31 projects across 26 states are expected to produce more than 23 gigawatts of additional electricity capacity.) .

A blank value cell means not disclosed by any source on file; a blank basis cell means the source gave the figure without saying on what basis.

The developer's figure is what the company said; what a permit allows is the ceiling a permit sets; measured means observed. Water is in gallons a day or a year, whichever the source stated; a tax claim given as a range shows both ends, each linked to the source that gave it.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Power the campus would draw A utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

What was decided

Acts of Lehigh County and Allentown about data centers, on the record with their source. A rule about the area is not a decision about this record.

DateWhoDecisionSource
Lehigh County South Whitehall Township in Lehigh County facing community opposition to a data center proposal cbsnews.com (opens in a new tab)

What happened

No dated entry is on the record yet.

  • Read on October 7, 2026 (the day the page was read; it gives no date of its own)

    The Pennsylvania DEP's Data Center Permit Tracker lists the project as proposed, with no permit applications received, as of October 7, 2026.

    [1] gis.dep.pa.gov

The site

The pin is the site, as the EPA's facility record places it. Location from an EPA facility record.

The site map is at the top of the page.

Where
Allentown, Lehigh County, Pennsylvania
How exactly it is located
Exact, the point of the EPA's facility record
The parcel
No parcel outline in the public record
Nearest homes
Not computed for a record placed at a place center

USGS NAIP aerial view of Emaus Ave Warehouse
LAT 40.56741 / LON -75.47454 Imagery: U.S. Geological Survey / USDA NAIP (Public Domain)

Comparisons

1 metric with more than one figure

Every figure on the record for the same thing, the record's own or the document's first, each with who gave it, its date and its basis.

Capacity at full buildout

1 figure, 1 source
Show each source's words
  • 23 GW, newscentermaine.com: 31 projects across 26 states are expected to produce more than 23 gigawatts of additional electricity capacity.

Questions about this project

7 questions answered from the record

Answered from the rows on this page.

How big is Emaus Ave Warehouse?

Not disclosed. No source on file gives its capacity, its acreage or a count of buildings. What the record holds instead is under Disclosed.

Who is building Emaus Ave Warehouse?

Quantm LLC is the developer, gis.dep.pa.gov (opens in a new tab). No construction contractor is named on the record yet.

Who will use Emaus Ave Warehouse?

Not disclosed. No source on file names a tenant, says whether the site is single or multi tenant, or states what it is for. The record keeps the use as not disclosed until one does; see Who it serves.

How much power and water does Emaus Ave Warehouse say it needs?

Power: not disclosed by any source on file. Water: not disclosed by any source on file.

Where does Emaus Ave Warehouse stand today?

It is proposed; the date it reached that stage is not sourced, only the day a page was read. No dated entry is on the record yet.

What has Allentown or Lehigh County decided about it?

Lehigh County: South Whitehall Township in Lehigh County facing community opposition to a data center proposal (reported September 16, 2026, cbsnews.com (opens in a new tab)). 1 event is on the county's rows; a rule about the area is not a decision about this record.

What is still unknown about Emaus Ave Warehouse?

Not disclosed by any source on file: how much power it needs, how much water it would use, how loud it would be, jobs once it runs, tax it would pay each year, who is constructing it, how much land, buildings, where its power comes from, grid connection, how it is cooled. No missing primary document is listed for this record yet; What the record lacks is where one appears when a person names it.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Tracked project domains

Promotional domains, campaign sites, and municipal portals preserved through the Internet Archive.

Primary documents

  1. Pennsylvania DEP Data Center Permit Tracker (opens in a new tab), Pennsylvania Department of Environmental Protection, October 7, 2026

1 source on file.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Commercial, enterprise, financial or AI training use needs a commercial license. Prose stays under copyright.
Cite this page Data Center Record, "Emaus Ave Warehouse", https://datacenterrecord.org/projects/emaus-ave-warehouse-allentown-pa, last verified October 23, 2026. CSV · JSON
Cite this page

Data Center Record, "Emaus Ave Warehouse", https://datacenterrecord.org/projects/emaus-ave-warehouse-allentown-pa. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Prose stays under copyright.

Report a change
For researchers
Stage
Proposed
Tier
reviewed in depth
Tags
Reviewed in depth
Coordinates
40.567406, -75.474544
How the location is known
Location from an EPA facility record.
Location source
https://gis.dep.pa.gov/DataCenterPermitTracker/
Coordinate source
the Pennsylvania DEP Data Center Permit Tracker's point for the site
Location source number
[1]
Location last verified
October 13, 2026
Published
October 13, 2026
Last verified
October 23, 2026
Undisclosed in public filings
EPA registry id, Uses, Tenancy, Cooling, How capacity was disclosed, How water was disclosed, How acreage was disclosed, Interconnection, Capacity, if disclosed, Rating of the county's rows

Researcher view · Emaus Ave Warehouse · 1 source, 1 entry, 1 decision nearby · basis and source tier on every row · verified October 23, 2026

Download CSV JSON