Data Center Record.
Census GEOID: 17037 Location Precision: permit coordinates Jump to Entity & Permit Table Commercial & Bulk Data (CC BY-NC 4.0)

Last verified: · 3 primary and 9 reporting sources

● Running First recorded September 14, 2026 · 5 Buildings

Meta DeKalb Data Center Campus

Street address 1350 E Gurler Rd, DeKalb, IL 60115, DeKalb County permit coordinates Exact, the point of the EPA's facility record [1] EPA ECHO detailed facility report: Goldframe LLC

Overview, regulatory gates and specifications

Meta lists a data center at DeKalb, Illinois among the sites it operates. [4] Filings on the record specify 5 planned or operational buildings. [2] Meta lists Meta DeKalb Data Center at DeKalb, Illinois on its own page of data center locations, read September 14, 2026. [2]

1. Land & Parcel
Parcel located
2. Local Zoning
Zoning approved
3. Tax & EDA Deal
Not yet on file
4. Utility Grid Queue
Energized
5. Air & Water Permits
Illinois DCEO Data Center In
What happens next: Facility is operational; air permit compliance, water reporting and utility filings are monitored.
Electricity Demand
Not disclosed
No MW figure in public filings yet

U.S. EIA residential equivalence (~830 homes per MW) will compute automatically once a permit or filing states facility megawatts.

Utility interconnection queue filings monitored.

Cooling & Water
Not disclosed
Daily water volume not stated in public filings

U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.

No local property tax abatement amount disclosed in public filings.

Site & Buildings [2]
5 buildings
operator page

Assessor parcel acreage and building square footage are added when municipal or county filings are published.

Location: 1350 E Gurler Rd, DeKalb, IL 60115.

Taxes & Permanent Jobs
Not disclosed
Tax and job figures not yet on file

State and local tax abatement agreements and permanent job commitments are recorded when filed.

No local property tax abatement amount disclosed in public filings.

Key specifications on the record

Power capacity
Not disclosed
Water usage
Not disclosed
Land area
Not disclosed
Buildings
5 buildings operator page
[2] datacenters.atmeta.com
Backup generators
Not disclosed
Capital investment
Not disclosed
Commissioned
Operational since 2022 (4 years)
Who leads it
Meta as stated by the source
Permitted legal entity
Goldframe LLC what a permit allows
[1] echo.epa.gov
State permit status
Illinois DCEO Data Center Investment Program Certified (2021, Goldframe LLC) the state's permit register, as of December 31, 2025, last verified November 6, 2026
[3] dceo.illinois.gov
Not disclosed
Who would use it, Jobs once it runs, Tax each year

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: Meta · Applicant / Shell LLC: Goldframe LLC
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for Meta DeKalb Data Center Campus.

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW)
Site Footprint (Acres)
Data Hall Buildings 5 buildings 5 operator page [2] datacenters.atmeta.com
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Power the campus would draw A utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Hearings and statements on the record

April 27, 2022 DeKalb, IL Facebook parent Meta expands Illinois data center in DeKalb DeKalb City Council 2 clips

DeKalb City Council approval of Project Kringle tax abatements and infrastructure agreements for the Meta DeKalb hyperscale data center (April 27, 2022).

  1. DeKalb Economic Development and Applicant Presentation Developer Representative transcribed from local broadcast report
    "investment of more than a billion dollars in dekalbon illinois when the work is complete it will support over 200 operational jobs there's a lot of other sustainable initiatives that are embedded into the design of our data center so for example our our cooling systems are some of the most efficient in the data center industry"
  2. Eyewitness News WTVO WQRF (MyStateline) Broadcast Report Broadcast Report transcribed from local broadcast report
    "year meta also announced it would provide a fifty thousand dollar grant to support stem materials and opportunities for elementary and secondary students in the DeKalb school district"

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

No dated entry is on the record yet.

Every event in order

  • Read on September 14, 2026 (the day the page was read; it gives no date of its own)

    Meta lists Meta DeKalb Data Center at DeKalb, Illinois on its own page of data center locations, read September 14, 2026.

    [2] datacenters.atmeta.com

Nearest data centers in Illinois

Verified data center records in Illinois within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
CyrusOne Yorkville Data Center Campus Yorkville, Kendall County 20 mi Proposed CyrusOne
South Elgin Sundowner Road Data Center Proposal South Elgin, Kane County 22 mi Stalled or cancelled Sundowner Industrial Developer LLC 2 buildings
Edged Chicago Data Center Campus (Aurora CHI01) Aurora, Kane County 25 mi Running Edged 96 MW
CyrusOne Aurora Campus (CHI1 / CHI2 / CHI3) Aurora, DuPage County 26 mi Running CyrusOne 3 buildings
Meridian Parkway Aurora Data Center Aurora, DuPage County 27 mi Running Meridian Parkway Data Center Owner LLC 1 building
Compass Datacenters Hoffman Estates Campus (ORD1) Hoffman Estates, Cook County 29 mi Running Compass Datacenters 5 buildings

Blank cell: not disclosed by any source on file.

Common questions about Meta DeKalb Data Center Campus

Answered directly from the verified filings and local actions on this page.

Who is building Meta DeKalb Data Center Campus?

Meta is the developer. No construction contractor is named on the record yet.

How much power and water does Meta DeKalb Data Center Campus say it needs?

Power: not disclosed by any source on file. Water: not disclosed by any source on file.

Where does Meta DeKalb Data Center Campus stand today?

It is running; the date it reached that stage is not sourced, only the day a page was read. No dated entry is on the record yet.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Tracked project domains

Promotional domains, campaign sites, and municipal portals preserved through the Internet Archive.

Primary documents

  1. EPA ECHO detailed facility report: Goldframe LLC (opens in a new tab), U.S. Environmental Protection Agency
  2. Meta: Our U.S. data center fleet (opens in a new tab), Meta, September 14, 2026
  3. Illinois DCEO Data Center Investment Program 2025 Annual Report (Goldframe LLC, DeKalb) (opens in a new tab), Illinois Department of Commerce and Economic Opportunity, December 31, 2025

Reporting

  1. Worker trapped inside shipping container at Facebook/Meta data center construction site - Data Center Dynamics (opens in a new tab), Data Center Dynamics, November 18, 2021, news outlet
  2. Inside secret contracts used to entice Facebook, Kraft Heinz, Ferrara Candy Co., Amazon to DeKalb - Shaw Local (opens in a new tab), Shaw Local, December 17, 2023, local outlet
  3. ChicagoWest Business Center welcomes Meta to DeKalb - REJournals (opens in a new tab), REJournals, December 1, 2023, news outlet
  4. Photos: Meta announces expansion at DeKalb Data Center - Shaw Local (opens in a new tab), Shaw Local, April 27, 2022, local outlet
  5. Meta property boosts tax base for now: DeKalb County officials - Shaw Local (opens in a new tab), Shaw Local, October 12, 2024, local outlet
  6. Meta Plans to Expand DeKalb, Illinois Data Center for Total Investment of $1B - REBusinessOnline (opens in a new tab), REBusinessOnline, April 29, 2022, news outlet
  7. Meta Data Center in DeKalb now operational - WSPYnews.com (opens in a new tab), WSPYnews.com, December 1, 2023, local outlet
  8. Meta Using AI to Create Greener Concrete for its Data Centers - Data Center Frontier (opens in a new tab), Data Center Frontier, April 27, 2022, news outlet
  9. Facebook parent Meta goes mega with Illinois data center - Crain's Chicago Business (opens in a new tab), Crain's Chicago Business, April 27, 2022, news outlet

12 sources on file.

Regional grid context

This site is in the RFC West (RFCW) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Meta DeKalb Data Center Campus", https://datacenterrecord.org/projects/meta-dekalb-data-center-il, last verified November 6, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Meta DeKalb Data Center Campus", https://datacenterrecord.org/projects/meta-dekalb-data-center-il. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Running
Tier
built from one source
Tags
Built from one source
Coordinates
41.890073, -88.727057
How the location is known
Location from an EPA facility record.
Location source
https://echo.epa.gov/detailed-facility-report?fid=110070836847
Coordinate source
EPA ECHO Detailed Facility Report 110070836847
Location source number
[1]
Location last verified
October 4, 2026
EPA registry id
110070836847
Published
September 14, 2026
Last verified
November 6, 2026
Not disclosed
Uses, Tenancy, Cooling, How capacity was disclosed, How water was disclosed, How acreage was disclosed, Interconnection, Capacity, if disclosed, Rating of the county's rows

Researcher view · Meta DeKalb Data Center Campus · 12 sources, 1 entry · basis and source tier on every row · verified November 6, 2026

Download CSV JSON