Data Center Record.

Data centers in Washington

Washington has 14 data center sites, 0 buildings where disclosed on the record: 11 running and 3 proposed. Most are in King County (7) and Grant County (5), and records are in 4 of 39 counties. The largest proposal is Microsoft Quincy Data Center in Grant County; it is reported.

Washington decides case by case. From the state's own rule: Washington law Senate Bill 6231 removed tax exemptions for replacement server equipment and ended eligibility for certain refurbished data centers in 2026, September 9, 2026.

3 sites the EPA's registry shows and no record has verified are on the map apart from the count. What not yet verified means.

How to read this page. Every count comes from the records on this page and links to where it is counted. Nothing is published until a person reads its source, and a figure no source gives reads Not disclosed; nothing is estimated. A rating changes only when a person sets it.

Projects and campuses on the record

Facility and countyStageOperatorPower (MW)Latest entry
Microsoft Quincy Data Center Quincy, Grant CountyProposedMicrosoft
Keel Moses Lake Data Center Moses Lake, Grant CountyProposedKeelPartnership formed earlier in 2026 with system requirements and delivery timelines settled gurufocus.com (opens in a new tab) national outlet reported September 11, 2026
Amazon Walla Walla County Data Center Walla Walla CountyProposedAmazonAdvance Phase LLC purchased approximately 500-553 acres in October 2024 for $32.5 million to $36 million datacenterdynamics.com (opens in a new tab) trade press reported February 12, 2026
CyrusOne Quincy PNW1 Quincy, Grant CountyRunningCyrusOne
H5 Data Centers Quincy Quincy, Grant CountyRunningH5 Data Centers
Vantage Quincy Quincy, Grant CountyRunningVantage Data Centers
Centersquare Seattle data center Seattle, King CountyRunningCentersquare
DataBank Seattle data center Seattle, King CountyRunningDataBank
Digital Realty Seattle Seattle, King CountyRunningDigital Realty
Equinix SE4 Kent, King CountyRunningEquinix
H5 Seattle Seattle, King CountyRunningH5 Data Centers
TierPoint Spokane Data Centers Spokane, Spokane CountyRunningTierPointData center development in Spokane paused or stalled spokanejournal.com (opens in a new tab) news outlet reported July 2, 2026
Equinix Seattle Seattle, King CountyRunningEquinixEquinix converted former parking deck into data center facility in Seattle datacenterknowledge.com (opens in a new tab) trade press reported May 30, 2024
TierPoint Seattle Data Center Seattle, King CountyRunningTierPointTierPoint expanded its Seattle data center by 18,000 square feet datacenterdynamics.com (opens in a new tab) trade press reported June 26, 2020

A blank cell means not disclosed by any source on file. Power is the developer's figure or a permit's, each linked on the record. All 14 Washington projects.

Every Washington record 14 records, and 3 sites not yet verified listed apart · sort by any column · blank cell: not disclosed

RecordPlaceStageOperatorMWBasisLocatedTierVerified
Apl Data CenterEast Wenatchee, DouglasNot yet verifiedEPA registry22026-10-20
Grant Node Data CenterMoses Lake, GrantNot yet verifiedEPA registry22026-10-20
Sabey Corp SeattleSeattle, KingNot yet verifiedSabey Data CentersEPA registry22026-10-20
CyrusOne Quincy PNW1Quincy, GrantRunningCyrusOneEPA registry22026-10-04
H5 Data Centers QuincyQuincy, GrantRunningH5 Data CentersEPA registry22026-10-04
Vantage QuincyQuincy, GrantRunningVantage Data CentersEPA registry22026-10-04
Centersquare Seattle data centerSeattle, KingRunningCentersquarecentroid22026-09-17
DataBank Seattle data centerSeattle, KingRunningDataBankcentroid22026-09-17
Digital Realty SeattleSeattle, KingRunningDigital Realtycentroid22026-09-17
Equinix SE4Kent, KingRunningEquinixcentroid22026-09-17
H5 SeattleSeattle, KingRunningH5 Data Centerscentroid22026-09-17
Microsoft Quincy Data CenterQuincy, GrantProposedMicrosoftcentroid42026-09-17
Keel Moses Lake Data CenterMoses Lake, GrantProposedKeelcentroid42026-09-17
TierPoint Spokane Data CentersSpokane, SpokaneRunningTierPointcentroid22026-09-17
Amazon Walla Walla County Data CenterWalla WallaProposedAmazoncentroid32026-09-25
Equinix SeattleSeattle, KingRunningEquinixcentroid22026-09-17
TierPoint Seattle Data CenterSeattle, KingRunningTierPointcentroid22026-09-17

Tier 1: an official or company source. Tier 2: a news report resolving to the outlet's own page. Located: a site coordinate from a permit, a parcel or an address, or the county or town centroid. Verified: the last day a person read the source. A blank cell means not disclosed by any source on file.

Every Washington county (39)

4 of 39 counties have a record. A county without one is listed, not linked, until its first published record.

CountyCensus GEOIDProjectsRulesHow it treats data centers
King County5303370
Grant County5302550
Spokane County5306311restrictive
Walla Walla County5307110
Klickitat County5303901
Pierce County5305301

A blank rating cell means no person has set one for the county. A county without a record is listed, not linked.

33 counties with no records yet
  • Adams County
  • Asotin County
  • Benton County
  • Chelan County
  • Clallam County
  • Clark County
  • Columbia County
  • Cowlitz County
  • Douglas County
  • Ferry County
  • Franklin County
  • Garfield County
  • Grays Harbor County
  • Island County
  • Jefferson County
  • Kitsap County
  • Kittitas County
  • Lewis County
  • Lincoln County
  • Mason County
  • Okanogan County
  • Pacific County
  • Pend Oreille County
  • San Juan County
  • Skagit County
  • Skamania County
  • Snohomish County
  • Stevens County
  • Thurston County
  • Wahkiakum County
  • Whatcom County
  • Whitman County
  • Yakima County

The rules in Washington 4 rows · rating rests only on a binding act in force

What the state and its counties and cities have decided. Each row is rated by what it has decided, open, case by case, restrictive or closed, never by whether that is good or bad.

BodyLevelRatingIn force untilLatest actActsVerified
Washingtonstatecase by caseWashington law Senate Bill 6231 removed tax exemptions for replacement server equipment and ended eligibility for certain refurbished data centers in 2026. newsweek.com (opens in a new tab) national outlet Sep 9, 20262 acts on this row
Every act on the Washington row
  1. event

    Washington moved to halt data center tax breaks

    dailycaller.com (opens in a new tab) national outlet

  2. event

    Washington law Senate Bill 6231 removed tax exemptions for replacement server equipment and ended eligibility for certain refurbished data centers in 2026.

    newsweek.com (opens in a new tab) national outlet

Last verified September 9, 2026.

22026-09-09
Klickitat Countycountynot ratedA data center moratorium proposal failed during Klickitat County Commissioners meeting despite public support. facebook.com (opens in a new tab) social media Reported Sep 82 acts on this row
Every act on the Klickitat County row
  1. moratorium rejected

    A data center moratorium proposal failed during Klickitat County Commissioners meeting despite public support

    facebook.com (opens in a new tab) social media

  2. hearing

    Klickitat County Commissioners held a workshop on data centers with an estimated 150 residents

    facebook.com (opens in a new tab) social media

Last verified September 8, 2026.

22026-09-08
Pierce Countycountynot ratedNo dated act on this row yet.2026-09-09
Spokane Countycountyrestrictive until December 18, 20262026-12-18Spokane County Board of Commissioners unanimously approved a four month pause on new data center permits on Tuesday. rangemedia.co (opens in a new tab) news outlet Aug 18, 20261 act on this row
Every act on the Spokane County row
  1. moratorium adopted

    Spokane County Board of Commissioners unanimously approved a four month pause on new data center permits on Tuesday.

    rangemedia.co (opens in a new tab) news outlet

Last verified September 23, 2026.

12026-09-23

Reported: the source's date; the item names no day of its own. A rating rests only on a binding act in force; "not rated" means no person has set one. A blank cell means the record holds nothing for it.

Washington laws and the full scorecard

Bills and laws in Washington

3 signed into law, 5 bills tracked

5 bills tracked in the Washington legislature, 3 of them signed into law, grouped by where each stands. A row opens its own page; the Washington laws page has what each law requires.

No official summary on file for any of these 5 measures; each row links to the legislature's page for the text.

Signed into law 3

5 bills tracked, 3 signed · LegiScan, CC BY 4.0

NumberSessionStatusDateTitle
S.B. 6231 2025-2026 Regular Session Signed 2026-04-01 Revised for engrossed: Removing a tax exemption for the replacement of equipment for data centers.
H.B. 2708 2025-2026 Regular Session In committee 2026-01-30 Removing a tax exemption for the replacement of equipment for data centers.
H.B. 2655 2025-2026 Regular Session In committee 2026-01-26 Providing a retail sales and use tax exemption for the construction and equipping of new data centers located in a county east of the Cascades that borders another state and has a population of at least 500,000.
H.B. 1846 2021-2022 Regular Session Signed 2022-03-31 Providing a tax preference for rural and nonrural data centers.
S.B. 6789 2009-2010 Regular Session Signed 2010-03-25 Concerning sales and use tax exemptions for certain equipment and infrastructure contained in data centers.

5 bills tracked in Washington; 2025-2026 Regular Session, legislature adjourned; last checked October 26, 2026. The last check found no bill not already tracked; the 5 tracked bills stand. Search terms: data center, data centre, large load, hyperscale, computing facility, server farm, high load factor (indirect), energy intensive facility (indirect), large electric load (indirect), digital asset mining (indirect), cryptocurrency mining (indirect), qualified technology facility (indirect), colocation (indirect), moratorium (with another term), sales tax exemption (with another term). The search on LegiScan. (opens in a new tab)

Bill data from LegiScan (opens in a new tab), licensed CC BY 4.0 (opens in a new tab). The record chooses the bills, writes each stage in its own words and cites the legislature's own page for every bill.

How this state's members voted

H.R. 9340, Ratepayer Protection Act: U.S. House of Representatives, roll call 312, September 16, 2026. On Motion to Suspend the Rules and Pass, as Amended. Passed, 417 to 3. Washington's members: 9 yea, 0 nay, 1 present or not voting. How each member voted

MemberPartyPosition
BaumgartnerRYea
DelBeneDYea
JayapalDYea
Larsen (WA)DYea
NewhouseRYea
PerezDYea
RandallDYea
SchrierDYea
Smith (WA)DNot Voting
StricklandDYea

A blank party cell means the clerk's roll gives none.

H.R. 9340, Ratepayer Protection Act: U.S. Senate, roll call 254, September 30, 2026. On Cloture on the Motion to Proceed H.R. 9340. Cloture on the Motion to Proceed Rejected, 57 to 43. Washington's members: 0 yea, 2 nay. How each member voted

MemberPartyPosition
Cantwell (D-WA)DNay
Murray (D-WA)DNay

A blank party cell means the clerk's roll gives none.

Positions as the clerk records them. How bills and votes are recorded.

What was said

Data centers are part of how we get our Netflix and get our Amazon shopping and our Google or Gmail, so some data centers , have to have them
John Duresky, Congressional Candidate (Democrat), Washington 4th District Campaign · October 19, 2026 · quoted · Yakima Herald-Republic (opens in a new tab) news outlet
Trump said people living near a data center could receive a dividend because nearby residents would benefit greatly from the development.
Donald Trump, U.S. President · October 3, 2026 · paraphrased · Newsweek (opens in a new tab) national outlet

Every Washington statement, by speaker (16)

11 more on this page, one per speaker and claim; 16 statements in all
"building these power-hungry, water-hungry data centers all over the place seems like something that we should be cautious about"
John Duresky, Congressional Candidate (Democrat), Washington 4th District Campaign Congressional campaign commentary Yakima Herald-Republic (opens in a new tab) news outlet
Context & source notes

Provenance: Quoted; content date; reported from elsewhere.

Setting: Congressional campaign commentary.

Primary source: Yakima Herald-Republic (opens in a new tab).

Gluesenkamp Perez said communities surrounding data centers “need to be held harmless” from effects of noise pollution and rising energy costs.

Democratic candidate for U.S. House (District 3), Washington opb.org (opens in a new tab) local outlet
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: opb.org (opens in a new tab).

Braun said every data center project needs to be evaluated on a case by case basis, but the discussion needs to start in the community where the project is proposed.

Republican candidate for U.S. House (District 3), Washington katu.com (opens in a new tab) local outlet
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: katu.com (opens in a new tab).

Daniel Cohan, professor of civil and environmental engineering at Rice University, says data center environmental impact depends on three variables: total electricity required, type of electricity generated, and how quickly projects are built.

professor of civil and environmental engineering, Rice University Newsweek (opens in a new tab) national outlet
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: Newsweek (opens in a new tab).

Amanda McKinney, Republican candidate for U.S. Rep. from Washington's 4th District, said data centers should follow local rules and communities should decide what facilities they want.

Republican candidate for U.S. Representative, Washington's 4th District KUOW (opens in a new tab) local outlet
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: KUOW (opens in a new tab).

John Duresky, Democrat candidate for U.S. Rep. from Washington's 4th District, said his coalition includes trade unions that want to build data centers as well as environmentalists concerned about AI impact.

Democratic candidate for U.S. Representative, Washington's 4th District KUOW (opens in a new tab) local outlet
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: KUOW (opens in a new tab).

County Commissioner Chris Jordan said data centers could consume the same energy as one half of the entirety of Spokane County.

Spokane County Commissioner RANGE Media (opens in a new tab) news outlet
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: RANGE Media (opens in a new tab).

"it's important for us to be at the forefront of all of the innovation as Americans"
Amanda McKinney, Yakima County Commissioner and Congressional Candidate, Yakima County Board of Commissioners June interview (exact venue not specified) Yakima Herald-Republic (opens in a new tab) news outlet
Context & source notes

Provenance: Quoted; content date; reported from elsewhere.

Setting: June interview (exact venue not specified).

Primary source: Yakima Herald-Republic (opens in a new tab).

"we're smart enough to do it in a way that we can do it safely and more importantly with community input"
Amanda McKinney, Yakima County Commissioner and Congressional Candidate, Yakima County Board of Commissioners Congressional campaign commentary Yakima Herald-Republic (opens in a new tab) news outlet
Context & source notes

Provenance: Quoted; content date; reported from elsewhere.

Setting: Congressional campaign commentary.

Primary source: Yakima Herald-Republic (opens in a new tab).

On the November 3, 2026 ballot in Washington: U.S. House, District 1 (2), U.S. House, District 2 (2), U.S. House, District 3 (2), U.S. House, District 4 (2), U.S. House, District 5 (2), U.S. House, District 6 (2), U.S. House, District 7 (2), U.S. House, District 8 (2), U.S. House, District 9 (2), U.S. House, District 10 (2); 5 of 20 candidates with a statement on data centers on the record. Every candidate.

Already running in Washington

11 sites are serving load, 7 of them in King County.

See the 11 running sites
  1. Centersquare Seattle data center Seattle, King County Running
  2. CyrusOne Quincy PNW1 Quincy, Grant County Running · Operational since 2019 (7 years)
  3. DataBank Seattle data center Seattle, King County Running
  4. Digital Realty Seattle Seattle, King County Running · Operational since 2005 (21 years)
  5. Equinix SE4 Kent, King County Running · Operational since 2016 (10 years)
  6. Equinix Seattle Seattle, King County Running · Operational since 2004 (22 years)
  7. H5 Data Centers Quincy Quincy, Grant County Running
  8. H5 Seattle Seattle, King County Running
  9. TierPoint Seattle Data Center Seattle, King County Running · Operational since 2020 (6 years)
  10. TierPoint Spokane Data Centers Spokane, Spokane County Running
  11. Vantage Quincy Quincy, Grant County Running · Operational since 2012 (14 years)

Questions about Washington data centers

How many data center projects are on the record in Washington?

14 projects are on the record in Washington: 3 reported, 11 running and 3 not yet verified. Each is listed under Projects with its status history and sources. Resources: the questions people ask about data centers

answered from the rows above

Where in Washington are they?

Records are in 4 counties: King County (7), Grant County (5), Spokane County (1) and Walla Walla County (1). The county table lists every county with its count, zero included. Resources: the questions people ask about data centers

answered from the rows above

How much power is disclosed for data centers in Washington?

Not disclosed. None of the 14 records on file for Washington states a power figure. Resources: the questions people ask about data centers

answered from the rows above

How much water do data centers in Washington say they will use?

Not disclosed. None of the 14 records on file for Washington states a water figure. Resources: the questions people ask about data centers

answered from the rows above

Who is building data centers in Washington?

12 developers are named on the record: Equinix (2 records), H5 Data Centers (2 records), TierPoint (2 records), Amazon, Centersquare, CyrusOne, DataBank, Digital Realty, Keel, Microsoft, Sabey Data Centers and Vantage Data Centers. Each name opens the record, where the developer's source is listed. Resources: the questions people ask about data centers

answered from the rows above

Which counties and cities in Washington have rules about data centers?

3 county and city rows are on the record, 1 of them rated: Spokane County is rated restrictive: Spokane County Board of Commissioners unanimously approved a four month pause on new data center permits on Tuesday, August 18, 2026, source (opens in a new tab), Klickitat County has no rating yet: A data center moratorium proposal failed during Klickitat County Commissioners meeting despite public support (reported September 8, 2026, source (opens in a new tab)) and Pierce County has no rating yet. The state's own row is rated case by case, with 2 dated acts listed under the scorecard. Resources: the questions people ask about data centers

answered from the rows above

What is proposed or being built near me in Washington, by county?

3 records are not yet running. Grant County: Keel Moses Lake Data Center (reported) and Microsoft Quincy Data Center (reported); and Walla Walla County: Amazon Walla Walla County Data Center (reported). A county name opens its page with the map and every record there. Resources: the questions people ask about data centers

answered from the rows above

What has the state of Washington itself decided?

3 state laws are on the record: S.B. 6231 (signed, April 1, 2026, source (opens in a new tab)), H.B. 1846 (signed, March 31, 2022, source (opens in a new tab)) and S.B. 6789 (signed, March 25, 2010, source (opens in a new tab)). The state's own scorecard row carries 2 dated acts, the newest reported September 9, 2026; the laws page has what each law requires in the words of its text. Resources: the questions people ask about data centers

answered from the rows above

Disclosed figures

nothing disclosed by 14 records

summed only where a record disclosed the figure

FigureDisclosed totalDisclosedWithout a figureBasis
Power014
Water, stated per day014
Water, stated per year014
Permanent jobs014
Tax each year014

A blank cell means no record in Washington disclosed the figure. Third party figures on the same metrics are listed apart below; a figure a project disclosed about itself is never mixed with them.

FigureDisclosed totalDisclosedWithout a figureBasis
Power014
Water, stated per day014
Water, stated per year014
Permanent jobs014
Tax each year014

A blank total means no record disclosed the figure; the count without one says how many.

Summed only where a record disclosed the figure; a record with no figure adds nothing and is counted as not disclosed. Water is summed per day and per year separately, as the sources stated it, and never converted. A tax claim given as a range is summed at both ends.

The disclosed totals are in the table above.

No source on file states what any of the 14 tracked facilities in Washington are for. 3 sites not yet verified are named apart and are not in that number.

What each use disclosed

UseRecordsPowerWaterJobsTax each year
No stated use14

A blank cell means no record with that use disclosed the figure.

A record that lists several uses counts once under each. Each cell is the sum over the records with that use, disclosed rows only.

No source on file states how any of the 14 tracked facilities in Washington are cooled. 3 sites not yet verified are named apart and are not in that number.

Sources read for Washington

20 sources

20 sources are read for Washington:

Newspapers
The Spokesman-Review
Public broadcaster
Cascade PBS, KUOW
Utility commission dockets
Washington Utilities and Transportation Commission
Economic development
Washington State Department of Commerce
Search feeds
15 news searches
Every feed, with its kind and tier

What the monitor reads for Washington: feeds every four hours, pages daily.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Only what a source states, with its basis. Nothing is estimated, and a figure no source gives reads not disclosed.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Commercial, enterprise, financial or AI training use needs a commercial license. Prose stays under copyright.
Cite this page Data Center Record, "Data centers in Washington", https://datacenterrecord.org/states/wa, updated October 22, 2026. CSV · JSON · GeoJSON
Cite this page

Data Center Record, "Data center records in Washington", https://datacenterrecord.org/states/wa. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Prose stays under copyright.

Report a change
For researchers
State code
WA
Rating of the state's own row
Case by case
Count by status
reported 3, running 11, not yet verified 3
Located records
3 located, 11 at a centroid, 0 without coordinates