Data Center Record.
Census GEOID: 53025 Location Precision: verified address Jump to Entity & Permit Table Commercial & Bulk Data (CC BY-NC 4.0)

Last verified: · 1 reporting source

● Running Announced January 17, 2026 · 6 Buildings · Microsoft

Microsoft Quincy Columbia Data Center Campus (MWH01)

Street address 15555 NW B Street, Quincy, WA 98848, Grant County verified address Exact, at the address datacenters.microsoft.com (opens in a new tab)

Overview, regulatory gates and specifications

Microsoft operates its flagship Columbia Data Center Campus (MWH01) across six facility phases totaling 240 MW at 15555 NW B Street in Quincy, Grant County, Washington. [1] Filings on the record specify 6 planned or operational buildings. [1] Microsoft has been building and operating data centers in Quincy for about 20 years and announced commitments including closed loop water systems and declining tax incentives to address community backlash. [1]

1. Land & Parcel
Parcel located
2. Local Zoning
Zoning approved
3. Tax & EDA Deal
Incentive review
4. Utility Grid Queue
Energized
5. Air & Water Permits
Not yet on file
What happens next: Facility is operational; air permit compliance, water reporting and utility filings are monitored.
Electricity Demand [1]
240 MW
the developer's figure

Equivalent to ~199,200 U.S. homes (U.S. EIA 830 homes/MW baseline) · 12% of Hoover Dam nameplate capacity (2,080 MW).

Grid interconnection and utility service tracked on file.

Cooling & Water
Not disclosed
Daily water volume not stated in public filings

U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.

No local property tax abatement amount disclosed in public filings.

Site & Buildings [1]
6 buildings
operator page

Assessor parcel acreage and building square footage are added when municipal or county filings are published.

Location: 15555 NW B Street, Quincy, WA 98848.

Taxes & Permanent Jobs
Not disclosed
Tax and job figures not yet on file

State and local tax abatement agreements and permanent job commitments are recorded when filed.

No local property tax abatement amount disclosed in public filings.

Key specifications on the record

Power capacity
240 MW developer figure Equivalent to the continuous electricity demand of about 199,200 average U.S. homes based on U.S. Energy Information Administration residential consumption data. About 2 percent of New York City's summer peak demand in 2024.
datacenters.microsoft.com (opens in a new tab)
Water usage
Not disclosed
Land area
Not disclosed
Buildings
6 buildings operator page
datacenters.microsoft.com (opens in a new tab)
Backup generators
Not disclosed
Capital investment
Not disclosed
Commissioned
Operational since 2020 (6 years)
Who leads it
Microsoft as stated by the source
Not disclosed
Who would use it, Jobs once it runs, Tax each year
The math behind the comparison
  1. Microsoft Quincy Columbia Data Center Campus (MWH01), capacity: 240 MW.
  2. New York City (NYISO Zone J) summer peak demand, actual, 2024: 10,245 MW (2024).
  3. 240 ÷ 10,245 = 0.02 (MW over MW).

Sources:

A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: Microsoft
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for Microsoft Quincy Columbia Data Center Campus (MWH01).

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW) 240 MW 240 MW the developer's figure
Site Footprint (Acres)
Data Hall Buildings 6 buildings 6 operator page
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

  1. · Status: running (content date)

    Microsoft has been building and operating data centers in Quincy for about 20 years and announced commitments including closed loop water systems and declining tax incentives to address community backlash.

    [1] opb.org

Every event in order

Nearest data centers in Washington

Verified data center records in Washington within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
CyrusOne Quincy Data Center (PNW1) Quincy, Grant County Less than 1 mi Running CyrusOne 48 MW
H5 Data Centers Quincy Campus Quincy, Grant County 2 mi Running H5 Data Centers 40 MW
Sabey Data Centers Intergate Quincy Campus Quincy, Grant County 3 mi Running Sabey Data Centers 65 MW
Vantage Data Centers Quincy Campus (WA1) Quincy, Grant County 5 mi Running Vantage Data Centers 83 MW
Microsoft East Wenatchee Data Center Campus (APL) East Wenatchee, Douglas County 19 mi Running Microsoft 72 MW
Serverfarm TiTAN Moses Lake Data Center Moses Lake, Grant County 26 mi Running Serverfarm 36 MW

Blank cell: not disclosed by any source on file.

Common questions about Microsoft Quincy Columbia Data Center Campus (MWH01)

Answered directly from the verified filings and local actions on this page.

Who is building Microsoft Quincy Columbia Data Center Campus (MWH01)?

Microsoft is the developer. No construction contractor is named on the record yet.

How much power and water does Microsoft Quincy Columbia Data Center Campus (MWH01) say it needs?

Power: 240 MW (the developer's figure, datacenters.microsoft.com (opens in a new tab)). Water: not disclosed by any source on file.

Where does Microsoft Quincy Columbia Data Center Campus (MWH01) stand today?

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Reporting

  1. A small town in Central Washington is Microsoft’s answer to the data center backlash - Oregon Public Broadcasting - OPB (opens in a new tab), OPB (via Google News), January 17, 2026, local outlet

1 source on file.

Regional grid context

This site is in the Northwest Power Pool (NWPP) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Microsoft Quincy Columbia Data Center Campus (MWH01)", https://datacenterrecord.org/projects/microsoft-quincy-data-center-wa, last verified October 27, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Microsoft Quincy Columbia Data Center Campus (MWH01)", https://datacenterrecord.org/projects/microsoft-quincy-data-center-wa. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Running
Tier
built from one source
Tags
Built from one source
Coordinates
47.2482, -119.8695
How the location is known
Location from the site's street address.
Location source
https://datacenters.microsoft.com/globe/explore/washington/
Coordinate source
Grant County Assessor / Microsoft
Location last verified
September 16, 2026
How capacity was disclosed
the developer's figure
Capacity, if disclosed
240 MW, the developer's figure
Published
September 5, 2026
Last verified
October 27, 2026
Not disclosed
Location source number, EPA registry id, Uses, Tenancy, Cooling, How water was disclosed, How acreage was disclosed, Interconnection, Rating of the county's rows

Researcher view · Microsoft Quincy Columbia Data Center Campus (MWH01) · 1 source, 1 entry · basis and source tier on every row · verified October 27, 2026

Download CSV JSON