Data Center Record.

Running Built from one source

Sabey Data Centers Intergate Quincy Campus

Quincy, Grant County, WADeveloper: Sabey Data CentersCensus GEOID 53025

Stage
Running
Power
65 MW
the developer's figure
Buildings
5 buildings
operator page, verified October 27, 2026
Undisclosed in public filings
Land, Water

Sabey Data Centers operates its 520,000 square foot, five building, 65 MW Intergate Quincy hydro powered data center campus at 2200 M Street NE in Quincy, Grant County, Washington. It is running; the record holds no sourced date for when it reached that stage.

How much water it would use and who would use it have not been disclosed.

1 hearing on the record, 2023

Last verified · 1 source, 0 primary · Built from one source, not yet reviewed in depth by a person. · How to read this page

  • This record: Running, ringed
  • data center
  • Smaller pins: 29 other published records in Washington
Details
  • this record's location, ringed
  • parcel outline, from the county parcel record
  • city limits, U.S. Census Bureau, on a town level record
  • county boundary

The other pins are the published projects in the same state, each in its stage color. The imagery beneath is the USGS national orthoimagery, public domain, shown so the land around the site can be read.

How to read this page. Every fact links to the source it rests on; a number in brackets is its place in the source list. A figure no source gives reads Not disclosed, and nothing is estimated. Where sources give different figures, each is shown with who gave it, and another source's figure never stands in for the record's own. Entries are added and never overwritten; corrections are listed under What happened.

What is known

Each figure as its source gave it. The number in brackets is its place in the source list.

Buildings
5 buildings operator page, verified October 27, 2026
[1] sabeydatacenters.com
Power it would draw
65 MW the developer's figure About 1 percent of New York City's summer peak demand in 2024.
[1] sabeydatacenters.com
Who leads it
Sabey Data Centers as stated by the source
Undisclosed in public filings
Land, Water, Who would use it, Jobs once it runs, Tax each year
The math behind the comparison
  1. Sabey Data Centers Intergate Quincy Campus, capacity: 65 MW.
  2. New York City (NYISO Zone J) summer peak demand, actual, 2024: 10,245 MW (2024).
  3. 65 ÷ 10,245 = 0.01 (MW over MW).

Sources:

A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).

Every field, with who said it and when (Researcher view)

Impact figures

FieldValueWho says soSourceLast verified
How much power it needs 65 MW the developer's figure [1] sabeydatacenters.com (opens in a new tab) October 27, 2026
How much water it would use
How loud it would be
Jobs once it runs
Tax it would pay each year

The record's fields

FieldValueWho says soSourceLast verified
Who is building it Sabey Data Centers as stated by the source October 27, 2026
Who is constructing it
How much land
Buildings 5 buildings operator page, verified October 27, 2026 [1] sabeydatacenters.com (opens in a new tab) October 27, 2026
Where its power comes from
Grid connection
How it is cooled

A blank value cell means not disclosed by any source on file; a blank basis cell means the source gave the figure without saying on what basis.

The developer's figure is what the company said; what a permit allows is the ceiling a permit sets; measured means observed. Water is in gallons a day or a year, whichever the source stated; a tax claim given as a range shows both ends, each linked to the source that gave it.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

What was decided

Acts of Grant County and Quincy about data centers, on the record with their source. A rule about the area is not a decision about this record.

July 14, 2023 Quincy, WA Quincy's Microsoft data center boom prompts new school, library, hospital, police station Quincy City Council 3clips

Quincy City Council public record on Grant County hydropower allocations, industrial zoning, and backup diesel generator permits for Quincy data center campuses (July 14, 2023).

  1. Quincy City Council & Grant County PUD Applicant and Economic Development Presentation Developer Representative auto captions, unchecked
    "being replaced by computing power. >> We just had one stoplight until the data centers came. Pretty much downtown looked like circa 1976. It was just all tired and and needed a face lift. >> Nick Conan was born and raised in Quincy. >> It's changed it for the better, and our poverty level has dropped immensely. >> He helps to run Microsoft's massive campus here, never before seen until"
  2. Quincy City Council & Grant County PUD Official Deliberation Elected Official auto captions, unchecked
    ">> There hasn't been any issues as far as you know with power grids, water supply, anything like that? >> Not that I'm aware of. >> Ever since Microsoft broke ground on the center 20 years ago, Quincy started booming. In the span of 15 years, census figures show the population of Quincy has grown by nearly 27%. >> We've gone from three to five guys to 50 guys. >> Mike Stetner has lived here most of his"
  3. Resident public comment Resident Public Comment auto captions, unchecked
    ">> Well, it was always the the reliable power. There's no trees to take out the power lines. They're close to a lot of the dams. The ground was cheap. The power cost was cheap. Uh an abundance of water. >> His small electric company grew from three employees to more than 200. >> Everything's just gotten bigger, better, faster. New schools, new fire station, new police station, city hall. >> Yes, those flashing yellow and green"

What happened

No dated entry is on the record yet.

  • Read on October 27, 2026 (the day the page was read; it gives no date of its own)

    Verified facility status from Washington state agency permits, utility dockets, municipal planning filings, or operator campus specifications.

    [1] sabeydatacenters.com

The site

The pin is the site's address.

The site map is at the top of the page.

Where
2200 M Street NE, Quincy, WA 98848, Quincy, Grant County, Washington [1] sabeydatacenters.com (opens in a new tab)
How exactly it is located
Exact, at the address
The parcel
No parcel outline in the public record
Nearest homes
Not computed for a record placed at a place center

USGS NAIP aerial view of Sabey Data Centers Intergate Quincy Campus
LAT 47.24631 / LON -119.81571 Imagery: U.S. Geological Survey / USDA NAIP (Public Domain)

Questions about this project

5 questions answered from the record

Answered from the rows on this page.

How big is Sabey Data Centers Intergate Quincy Campus?

The record has 2 measures of its size: 65 MW (the developer's figure, sabeydatacenters.com (opens in a new tab)) and 5 buildings (operator page, verified October 27, 2026, sabeydatacenters.com (opens in a new tab)). Its acreage is not disclosed.

Who is building Sabey Data Centers Intergate Quincy Campus?

Sabey Data Centers is the developer. No construction contractor is named on the record yet.

How much power and water does Sabey Data Centers Intergate Quincy Campus say it needs?

Power: 65 MW (the developer's figure, sabeydatacenters.com (opens in a new tab)). Water: not disclosed by any source on file.

Where does Sabey Data Centers Intergate Quincy Campus stand today?

It is running; the date it reached that stage is not sourced, only the day a page was read. No dated entry is on the record yet.

What has Quincy or Grant County decided about it?

No decision by Quincy or Grant County about data centers is on the record. The Grant County page and the Washington scorecard list every rated row the day a person publishes one.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Reporting

  1. Sabey Data Centers Intergate Quincy Campus Official Disclosure (opens in a new tab), Sabey Data Centers, query feed

1 source on file.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Sabey Data Centers Intergate Quincy Campus", https://datacenterrecord.org/projects/sabey-data-centers-intergatequincy-quincy-wa, last verified October 27, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Sabey Data Centers Intergate Quincy Campus", https://datacenterrecord.org/projects/sabey-data-centers-intergatequincy-quincy-wa. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Running
Tier
built from one source
Tags
Built from one source
Coordinates
47.246308, -119.815715
How the location is known
Location from the site's street address.
Location source
https://sabeydatacenters.com/locations/quincy-washington-data-center
Coordinate source
Grant County Assessor / Sabey Data Centers
How capacity was disclosed
the developer's figure
Capacity, if disclosed
65 MW, the developer's figure
Published
October 21, 2026
Last verified
October 27, 2026
Undisclosed in public filings
Location source number, Location last verified, EPA registry id, Uses, Tenancy, Cooling, How water was disclosed, How acreage was disclosed, Interconnection, Rating of the county's rows

Researcher view · Sabey Data Centers Intergate Quincy Campus · 1 source, 1 entry, 0 decisions nearby · basis and source tier on every row · verified October 27, 2026

Download CSV JSON