Census GEOID: 53025 Location Precision: verified address Jump to Entity & Permit Table Commercial & Bulk Data (CC BY-NC 4.0)

Last verified: · 4 primary sources

● Running First recorded September 14, 2026 · 3 Buildings

Vantage Data Centers Quincy Campus (WA1)

Street address 2101 Road M NE, Quincy, WA 98848, Grant County verified address Exact, at the address [3] Vantage Data Centers: Vantage Quincy

Overview, regulatory gates and specifications

Vantage Data Centers operates its 83 MW, three building WA1 hyperscale data center campus at 2101 Road M NE in Quincy, Grant County, Washington (EPA FRS ID 110067218987). [1] Vantage Data Centers lists Vantage Quincy at Quincy, Washington on its own page of data center locations, read September 14, 2026. [4]

1. Land & Parcel
Parcel located
2. Local Zoning
Zoning approved
3. Tax & EDA Deal
Not yet on file
4. Utility Grid Queue
Energized
5. Air & Water Permits
EPA air permit on file
What happens next: Facility is operational; air permit compliance, water reporting and utility filings are monitored.
Electricity Demand [3]
83 MW
the developer's figure

Equivalent to ~68,890 U.S. homes (U.S. EIA 830 homes/MW baseline) · 4.0% of Hoover Dam nameplate capacity (2,080 MW).

Grid interconnection and utility service tracked on file.

Cooling & Water
Not disclosed
Daily water volume not stated in public filings

U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.

No local property tax abatement amount disclosed in public filings.

Site & Buildings [3]
3 buildings
operator page

Assessor parcel acreage and building square footage are added when municipal or county filings are published.

Location: 2101 Road M NE, Quincy, WA 98848.

Taxes & Permanent Jobs
Not disclosed
Tax and job figures not yet on file

State and local tax abatement agreements and permanent job commitments are recorded when filed.

No local property tax abatement amount disclosed in public filings.

Key specifications on the record

Power capacity
83 MW developer figure Equivalent to the continuous electricity demand of about 68,900 average U.S. homes based on U.S. Energy Information Administration residential consumption data. About 0.8 percent of New York City's summer peak demand in 2024.
[3] vantage-dc.com
Water usage
Not disclosed
Land area
Not disclosed
Buildings
3 buildings operator page
[3] vantage-dc.com
Backup generators
Not disclosed
Capital investment
Not disclosed
Commissioned
Operational since 2012 (14 years)
Who leads it
Vantage Data Centers as stated by the source
Official project website
vantage-dc.com (opens in a new tab) verified October 28, 2026
vantage-dc.com (opens in a new tab)
Archived promotional websites
vantage-dc.com (opens in a new tab) [Wayback snapshot] (opens in a new tab) preserved in Internet Archive
tracked domains
Not disclosed
Who would use it, Jobs once it runs, Tax each year
The math behind the comparison
  1. Vantage Data Centers Quincy Campus (WA1), capacity: 83 MW.
  2. New York City (NYISO Zone J) summer peak demand, actual, 2024: 10,245 MW (2024).
  3. 83 ÷ 10,245 = 0.0081 (MW over MW).

Sources:

A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: Vantage Data Centers
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for Vantage Data Centers Quincy Campus (WA1).

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW) 83 MW 83 MW the developer's figure [3] vantage-dc.com
Site Footprint (Acres)
Data Hall Buildings 3 buildings 3 operator page [3] vantage-dc.com
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Hearings and statements on the record

July 14, 2023 Quincy, WA Quincy's Microsoft data center boom prompts new school, library, hospital, police station Quincy City Council 3 clips

Quincy City Council public record on Grant County hydropower allocations, industrial zoning, and backup diesel generator permits for Quincy data center campuses (July 14, 2023).

  1. KOMO News Broadcast Report Broadcast Report transcribed from local broadcast report
    "being replaced by computing power. We just had one stoplight until the data centers came. Pretty much downtown looked like circa 1976. It was just all tired and needed a face lift. Nick Conan was born and raised in Quincy. It's changed it for the better, and our poverty level has dropped immensely. He helps to run Microsoft's massive campus here, never before seen until"
  2. KOMO News Broadcast Report Broadcast Report transcribed from local broadcast report
    "There hasn't been any issues as far as you know with power grids, water supply, anything like that? Not that I'm aware of. Ever since Microsoft broke ground on the center 20 years ago, Quincy started booming. In the span of 15 years, census figures show the population of Quincy has grown by nearly 27%. We've gone from three to five guys to 50 guys. Mike Stetner has lived here most of his"
  3. Resident public comment Resident Public Comment transcribed from local broadcast report
    "Well, it was always the reliable power. There's no trees to take out the power lines. They're close to a lot of the dams. The ground was cheap. The power cost was cheap. an abundance of water. His small electric company grew from three employees to more than 200. Everything's just gotten bigger, better, faster. New schools, new fire station, new police station, city hall. Yes, those flashing yellow and green"

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

No dated entry is on the record yet.

Every event in order

  • Read on September 14, 2026 (the day the page was read; it gives no date of its own)

    Vantage Data Centers lists Vantage Quincy at Quincy, Washington on its own page of data center locations, read September 14, 2026.

    [3] vantage-dc.com

1 correction to this record

Every correction, with its reason
  1. · Timeline date

    Dated from its source: the row's own text states it: "... read September 14, 2026."

Every correction on the record is on the corrections page.

Nearest data centers in Washington

Verified data center records in Washington within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
Sabey Data Centers Intergate Quincy Campus Quincy, Grant County 2 mi Running Sabey Data Centers 65 MW
H5 Data Centers Quincy Campus Quincy, Grant County 3 mi Running H5 Data Centers 40 MW
Microsoft Quincy Columbia Data Center Campus (MWH01) Quincy, Grant County 5 mi Running Microsoft 240 MW
CyrusOne Quincy Data Center (PNW1) Quincy, Grant County 5 mi Running CyrusOne 48 MW
Serverfarm TiTAN Moses Lake Data Center Moses Lake, Grant County 22 mi Running Serverfarm 36 MW
Microsoft East Wenatchee Data Center Campus (APL) East Wenatchee, Douglas County 23 mi Running Microsoft 72 MW

Blank cell: not disclosed by any source on file.

Common questions about Vantage Data Centers Quincy Campus (WA1)

Answered directly from the verified filings and local actions on this page.

Who is building Vantage Data Centers Quincy Campus (WA1)?

Vantage Data Centers is the developer. No construction contractor is named on the record yet.

How much power and water does Vantage Data Centers Quincy Campus (WA1) say it needs?

Power: 83 MW (the developer's figure, vantage-dc.com (opens in a new tab)). Water: not disclosed by any source on file.

Where does Vantage Data Centers Quincy Campus (WA1) stand today?

It is running; the date it reached that stage is not sourced, only the day a page was read. No dated entry is on the record yet.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Tracked project domains

Promotional domains, campaign sites, and municipal portals preserved through the Internet Archive.

Primary documents

  1. EPA ECHO detailed facility report: Vantage Data Centers (opens in a new tab), U.S. Environmental Protection Agency
  2. Vantage Data Centers: Data center locations (opens in a new tab), Vantage Data Centers, September 14, 2026
  3. Vantage Data Centers: Vantage Quincy (opens in a new tab), Vantage Data Centers, September 14, 2026
  4. Vantage Data Centers lists Vantage Quincy at Quincy, Washington (opens in a new tab), Vantage Data Centers

4 sources on file.

Regional grid context

This site is in the Northwest Power Pool (NWPP) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Vantage Data Centers Quincy Campus (WA1)", https://datacenterrecord.org/projects/vantage-quincy-wa, last verified October 27, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Vantage Data Centers Quincy Campus (WA1)", https://datacenterrecord.org/projects/vantage-quincy-wa. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Running
Tier
built from one source
Tags
Built from one source
Coordinates
47.262526, -119.768477
How the location is known
Location from the site's street address.
Location source
https://vantage-dc.com/data-center-locations/north-america/quincy-washington/
Coordinate source
EPA FRS / Grant County Assessor
Location source number
[1]
Location last verified
October 4, 2026
EPA registry id
110067218987
How capacity was disclosed
the developer's figure
Capacity, if disclosed
83 MW, the developer's figure
Published
September 14, 2026
Last verified
October 27, 2026
Not disclosed
Uses, Tenancy, Cooling, How water was disclosed, How acreage was disclosed, Interconnection, Rating of the county's rows

Researcher view · Vantage Data Centers Quincy Campus (WA1) · 4 sources, 1 entry · basis and source tier on every row · verified October 27, 2026