Data centers in Quincy, Washington
Quincy has 5 data centers on the record: 5 running. No city rule about data centers is on the record for Quincy yet. Grant County's own decisions are on the Grant County page.
The 5 data centers in Quincy
Every Quincy record 5 records · blank cell: not disclosed · sort by any column
| Facility and county | Stage | Operator | Power (MW) | Latest entry | Basis | Located | Tier | Verified |
|---|---|---|---|---|---|---|---|---|
| CyrusOne Quincy Data Center (PNW1) Quincy, Grant County | Running | CyrusOne | 48 | the developer's figure | site | 2 | 2026-10-27 | |
| H5 Data Centers Quincy Campus Quincy, Grant County | Running | H5 Data Centers | 40 | the developer's figure | site | 2 | 2026-10-27 | |
| Sabey Data Centers Intergate Quincy Campus Quincy, Grant County | Running | Sabey Data Centers | 65 | the developer's figure | site | 1 | 2026-10-27 | |
| Vantage Data Centers Quincy Campus (WA1) Quincy, Grant County | Running | Vantage Data Centers | 83 | the developer's figure | site | 2 | 2026-10-27 | |
| Microsoft Quincy Columbia Data Center Campus (MWH01) Quincy, Grant County | Running | Microsoft | 240 | Microsoft has been building and operating data centers in Quincy for about 20 years and announced commitments including closed loop water systems and declining tax incentives to address community backlash. opb.org (opens in a new tab) local outlet January 17, 2026 | the developer's figure | site | 4 | 2026-10-27 |
Blank cell: not disclosed by any source on file. Power is the developer's figure or a permit's, each linked on the record.
What Quincy has decided
No facility record and no county act is on the record for Quincy yet. The Washington state rule applies: case by case.
July 14, 2023 Quincy, WA Quincy's Microsoft data center boom prompts new school, library, hospital, police station
Quincy City Council public record on Grant County hydropower allocations, industrial zoning, and backup diesel generator permits for Quincy data center campuses (July 14, 2023).
- KOMO News Broadcast Report Broadcast Report transcribed from local broadcast report
"being replaced by computing power. We just had one stoplight until the data centers came. Pretty much downtown looked like circa 1976. It was just all tired and needed a face lift. Nick Conan was born and raised in Quincy. It's changed it for the better, and our poverty level has dropped immensely. He helps to run Microsoft's massive campus here, never before seen until"
- KOMO News Broadcast Report Broadcast Report transcribed from local broadcast report
"There hasn't been any issues as far as you know with power grids, water supply, anything like that? Not that I'm aware of. Ever since Microsoft broke ground on the center 20 years ago, Quincy started booming. In the span of 15 years, census figures show the population of Quincy has grown by nearly 27%. We've gone from three to five guys to 50 guys. Mike Stetner has lived here most of his"
- Resident public comment Resident Public Comment transcribed from local broadcast report
"Well, it was always the reliable power. There's no trees to take out the power lines. They're close to a lot of the dams. The ground was cheap. The power cost was cheap. an abundance of water. His small electric company grew from three employees to more than 200. Everything's just gotten bigger, better, faster. New schools, new fire station, new police station, city hall. Yes, those flashing yellow and green"
Using this data in a report? Support the record.
The rules across Washington · Report missing data or a local act
What happened
-
Went liveMicrosoft Quincy Columbia Data Center Campus (MWH01)
opb.org (opens in a new tab) local outlet
The county and nearby counties
Distances run between the centers the Census Bureau gives each place. Every Washington county.
Disclosed figures
476 MW power
Power, water, jobs and tax
| Figure | Disclosed total | Disclosed | Without a figure | Basis |
|---|---|---|---|---|
| Power | 476 MW | 5 | 0 | 5 the developer's figure |
| Water, stated per day | 0 | 5 | ||
| Water, stated per year | 0 | 5 | ||
| Permanent jobs | 0 | 5 | ||
| Tax each year | 0 | 5 |
A blank total means no record disclosed the figure; the count without one says how many.
Summed only where a record disclosed the figure; a record with no figure adds nothing and is counted as not disclosed. Water is summed per day and per year separately, as the sources stated it, and never converted. A tax claim given as a range is summed at both ends.
By what the facilities are for
| Use | Records | Power | Water | Jobs | Tax each year |
|---|---|---|---|---|---|
| No stated use | 5 | 476 MW |
A blank cell means no record with that use disclosed the figure.
A record that lists several uses counts once under each. Each cell is the sum over the records with that use, disclosed rows only.
What the facilities are for
No source on file states what any of the 5 tracked facilities in Quincy are for.
How the facilities are cooled
No source on file states how any of the 5 tracked facilities in Quincy are cooled.
About this data
Report a correction · Send a tip about Quincy · The rows here are part of the Washington export.
Cite this page
Data Center Record, "Data center records in Quincy, Grant County, Washington", https://datacenterrecord.org/states/wa/grant-county/quincy. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.
The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.
For researchers
- Level
- city
- Census GEOID
- 5357115
- Census geography
- Incorporated place, Quincy city
- Rating
- Not rated