● Proposed Campus Reported February 12, 2026 · 4 Buildings

Amazon Wallula Data Center Campus

Street address 450 Dodd Road, Wallula, WA 99363, Walla Walla County verified address Exact, at the address ecology.wa.gov (opens in a new tab)

Overview, regulatory gates and specifications

Amazon Web Services filed SEPA environmental review and air quality permit applications for a four building data center campus on Dodd Road at the Port of Walla Walla Wallula Gap Industrial Park in Walla Walla County, Washington. [1] Amazon held an open house for a proposed data center in Walla Walla County that drew public debate. [1]

Verified Site & Permit Summary
Verified address
450 Dodd Road, Wallula, WA 99363, Walla Walla County verified address
Operator / developer
Amazon Web Services
Permit / registry ID
www.datacenterdynamics.com on file [1]

How much power it needs, how much water it would use and who would use it have not been disclosed.

What happens next: Next public milestones include utility queue filings, state environmental permits and local site plan review.

Key specifications on the record

Power capacity
Not disclosed
Water usage
Not disclosed
Land area
Not disclosed
Buildings
4 buildings permitted
ecology.wa.gov (opens in a new tab)
Backup generators
Not disclosed
Capital investment
Not disclosed
Who leads it
Amazon Web Services as stated by the source
Where its power comes from
Nuclear power: four SMRs offering up to 320 MW capacity as stated by the source
[1] datacenterdynamics.com
Not disclosed
Who would use it, Jobs once it runs, Tax each year

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Michael Baumgartner

Michael Baumgartner

U.S. Representative · Washington

DID Recorded statement at OPB (September 21, 2026)
SAID Michael Baumgartner said a data center should not increase utility customers' water and electricity rates to effectively subsidize the company (September 21, 2026) opb.org (opens in a new tab)

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: Amazon Web Services · Parent: Amazon
UTILITIES
Electric utility: Nuclear power: four SMRs offering up to 320 MW capacity

View all 5 statements on the record in Washington →

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for Amazon Wallula Data Center Campus.

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW)
Site Footprint (Acres)
Data Hall Buildings 4 buildings permit filing
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Power the campus would draw A utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

  1. (content date)

    Amazon held an open house for a proposed data center in Walla Walla County that drew public debate.

    ecology.wa.gov (opens in a new tab) primary source

  2. Acquisition (source date; the content gives no date of its own)

    Advance Phase LLC purchased approximately 500-553 acres in October 2024 for $32.5 million to $36 million

    [1] datacenterdynamics.com

Every event in order

2 corrections to this record

Every correction, with its reason
  1. · Event type

    The entry reports a purchase of land, a building or a company, a change of hands and not a stage; its kind was other and is acquisition (the record's rules, on the editor's word).

  2. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

Every correction on the record is on the corrections page.

Nearest data centers in Washington

No other verified data center record in Washington is located within 60 miles of this site. Browse all data centers in Washington.

Comparisons

1 metric with more than one figure

Every figure on the record for the same thing, each with who gave it, its date and its basis.

Project footprint

1 figure, 1 source
Show each source's words
  • 125 acres, www.datacenterdynamics.com: Project planned in four phases of 125 acres each, with four 215,000 sq ft buildings per phase, totaling more than 3.4 million sq ft

Common questions about Amazon Wallula Data Center Campus

Answered directly from the verified filings and local actions on this page.

Who is building Amazon Wallula Data Center Campus?

Amazon Web Services is the developer. No construction contractor is named on the record yet.

Who will use Amazon Wallula Data Center Campus?

Not disclosed. No source on file names a tenant, says whether the site is single or multi tenant, or states what it is for. The record keeps the use as not disclosed until one does; see Who it serves.

How much power and water does Amazon Wallula Data Center Campus say it needs?

Power: not disclosed by any source on file. Water: not disclosed by any source on file.

Where does Amazon Wallula Data Center Campus stand today?
What is still unknown about Amazon Wallula Data Center Campus?

Not disclosed by any source on file: how much power it needs, how much water it would use, how loud it would be, jobs once it runs, tax it would pay each year, who is constructing it, how much land, grid connection, how it is cooled. No missing primary document is listed for this record yet; What the record lacks is where one appears when a person names it.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Reporting

  1. AWS likely behind $4.8bn data center in Walla Walla, Washington (opens in a new tab), www.datacenterdynamics.com, February 12, 2026, trade press
  2. Public comment period opens for proposed Amazon data center in Wallula (opens in a new tab), elkhornmediagroup.com, September 15, 2026, news outlet
  3. Amazon open house draws debate over Walla Walla County data center - Nonstop Local News (opens in a new tab), Nonstop Local News, August 12, 2026, local outlet

3 sources on file.

Regional grid context

This site is in the Northwest Power Pool (NWPP) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Amazon Wallula Data Center Campus", https://datacenterrecord.org/projects/amazon-walla-walla-county-data-center-wa, last verified October 27, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Amazon Wallula Data Center Campus", https://datacenterrecord.org/projects/amazon-walla-walla-county-data-center-wa. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Proposed
Tier
built from one source
Tags
Built from one source
Coordinates
46.1025, -118.9042
How the location is known
Location from the site's street address.
Location source
https://ecology.wa.gov/regulations-permits/permits-certifications/air-quality-permits
Coordinate source
Walla Walla County Assessor / SEPA Checklist
Location last verified
September 16, 2026
Published
September 5, 2026
Last verified
October 27, 2026
Not disclosed
Location source number, EPA registry id, Uses, Tenancy, Cooling, How capacity was disclosed, How water was disclosed, How acreage was disclosed, Interconnection, Capacity, if disclosed, Rating of the county's rows

Researcher view · Amazon Wallula Data Center Campus · 3 sources, 2 entries · basis and source tier on every row · verified October 27, 2026

Download CSV JSON